Woodbury · Ordenanza de zonificación
Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 4 - DEVELOPMENT PERMITTING / Article 4-3 - POST-ISSUANCE PROVISIONS AND ENFORCEMENT
Sec. 3-404. Field changes.
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) After issuance of a development permit, if changes are desired or made necessary as a result of field conditions, the design engineer must contact the zoning administrator to coordinate the review and approval of the requested revision.
(b) All field changes shall be documented as revisions to the approved development plans and correctly shown on as-built surveys.
(c) Discrepancies between as-built surveys and approved development plans may result in delays in approving final plats, building permits, or certificates of occupancy.
Historia
(Ord. of 5-17-2021(1))
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.