Woodbury · Ordenanza de zonificación
Appendix A - ZONING / Article 10 - PROCEDURES AND PERMITS / Division III - SPECIAL EXCEPTIONS
Division III. SPECIAL EXCEPTIONS
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Sec. Z10-26. Purpose and Intent.
The special exception procedure is designed to provide an opportunity for discretionary review of requests to establish or construct uses or structures which have
the potential for a deleterious impact upon the health, safety, and welfare of the public or where the impact of the use on the immediate area or the city in general related to traffic, utilities, or other factors requires additional review
criteria or requirements; and, in the event such uses or structures are approved, the authority to impose such conditions that are designed to avoid, minimize, or mitigate potentially adverse effects upon the community or other
properties in the vicinity of the proposed use or structure.
(Ord. of 7-15-2019) Sec. Z10-27. Applicability.
The requirements herein established shall apply to all special exception uses or structures identified in this Ordinance.
A. A public hearing shall be held and action shall be taken by the Board of Zoning Appeals on any special exception application in accordance with Sec. Z10-38, Public Hearing and Sec. Z10-39, Issues for Consideration except as provided hereunder.
Figure 6—Special Exception Process
B. Under the following circumstances, in lieu of the Board of Zoning Appeals, special exceptions shall be determined by the Planning and Zoning Commission or the City Council as follows:
1. The Planning and Zoning Commission shall review and decide upon special exceptions for properties or projects zoned for planned developments and mixeduse projects, and for ground floor residential requests and townhouse developments in the Central Business District (CBD), unless such requests that relate to a property or project that qualifies as a Development of Regional Impact (DRI) under the criteria contained in Sec. Z10-10, Application Submittal Requirements, Subsection B.
2. The Planning and Zoning Commission shall hear and make recommendations on special exceptions for telecommunications towers as provided in the Restrictions on Particular Uses Article, for a final decision by the City Council.
3. The City Council shall review and decide upon special exceptions for any property or project that qualifies as a Development of Regional Impact (DRI) under the criteria contained in Sec. Z10-10, Application Submittal Requirements, Subsection B.
4. The City Council shall review and decide upon special exceptions for any bed and breakfast inn. See also Sec. Z3-25, Bed and Breakfast Inns.
5. All other provisions of this Division shall apply to any such planned development or mixed-use project, CBS request, or DRI, including the provisions under Sec.
Z10-38, Public Hearing and Sec. Z10-39, Issues for Consideration.
(Ord. of 7-15-2019) Sec. Z10-28. Authorized Special Exception Uses.
Only those special exceptions that are expressly authorized as such in a particular zoning district, or elsewhere in this Ordinance, may be approved.
(Ord. of 7-15-2019) Sec. Z10-29. Special Exception Application Submittal Requirements.
Applications for special exceptions must provide the following information:
A. Applications for special exceptions must provide a completed application. The application requests that the applicant be able to satisfactorily answer the following questions:
1. Why is the use proposed as a special exception appropriate for the district and area for which it is being applied for?
2. How is the proposed special exception a benefit to the surrounding neighborhood and city in general rather than a special privilege to an individual property owner?
3. What is the proposed period of time the special exception is requested for?
4. What additional criteria will you proffer to minimize the impact of the special exception on surrounding properties?
B. In addition, the same information required for an application for a zoning map amendment under Sec. Z10-10, Application Submittal Requirements, Subsection B.
must be provided along with the completed application.
(Ord. of 7-15-2019) Sec. Z10-30. Review of Application.
A complete application for a special exception shall be filed with the Zoning Administrator.
The application review shall follow the same process as for a text or zoning map amendment described in Sec. Z10-11, Review of Application.
(Ord. of 7-15-2019) Sec. Z10-31. Staff Review of Application.
A. General Review/Referral. Upon acceptance of the application for special exception, the Zoning Administrator shall follow the same process for staff review as required for a text or zoning map amendment under Sections Sec. Z10-12, Staff Review of Application.
B. Required Action by Other Board. In the event this Ordinance requires that an application not be granted until acted upon by some government board or agency other than the Planning and Zoning Commission, Board of Zoning Appeals, or City Council, then the Zoning Administrator shall forward the application for special exception to such board or agency for appropriate action prior to the notification to an applicant that the application is ready to be presented to the hearing authority (i.e. Planning and Zoning Commission, Board of Zoning Appeals, or City Council). If they deem it appropriate, the hearing authority may approve an application contingent on required action by the other board or agency.
C. Special Exception Report and Notice to Applicant. The Zoning Administrator shall compile the referrals and any other necessary information, prepare a written report with proposed findings and a recommendation, and notify the applicant that the report is complete, and the application is ready to be presented for public hearing by the hearing authority.
(Ord. of 7-15-2019) Sec. Z10-32. Amendment to Application.
An application for a special exception may be amended by the submittal of additional information or proposed changes to the application after it has been accepted.
A. If the additional information or proposed changes submitted are to conform to recommendations made by referrals or by the hearing authority at their public hearing, then it shall not be deemed an amendment and the application shall continue to be processed on its original timeline.
B. However, if the additional information or proposed changes submitted by the applicant are at the applicant's request, then the Zoning Administrator shall review the information within 15-calendar days of receipt and render a finding as to whether the submitted information necessitates repeating any portion of the review process (including the public hearing).
C. If any portion must be repeated, the Zoning Administrator will notify the applicant in writing within the 15-calendar day period that the additional information or proposed changes will require an extension of the time limits prescribed in this Section and such notice shall specify the required extension.
D. The applicant will then have 15 calendar days to provide the Zoning Administrator with a written response either granting the necessary extension or withdrawing the additional information or proposed changes which necessitated the extension. If the applicant chooses to withdraw the information, then the application will proceed based on its original timeline.
(Ord. of 7-15-2019) Sec. Z10-33. Withdrawal of Application.
A. A special exception application may be withdrawn upon written request by the applicant any time prior to the deadline for publication of the notice of its public hearing; provided that if the request for withdrawal is made after such deadline, such withdrawal shall be only with the consent of the hearing authority.
B. If the hearing authority consents to the withdrawal of a special exception application, no new special exception application concerning any or all of the same property shall be filed within 12 months of the date of withdrawal, unless the hearing authority specifies at the time it consents to withdrawal that said time limitation shall not apply.
C. In the event that a special exception application is withdrawn under any circumstances, the application fee shall not be refunded.
(Ord. of 7-15-2019) Sec. Z10-34. Limitation on Application after Denial.
After the official denial of a special exception application, substantially the same application concerning any or all of the same property shall not be filed within 12 months of the date of denial; provided, however, that only the City Council may allow a special exception application to be resubmitted on the same property provided final action on the request will occur not less than 6 months after the date of denial.
(Ord. of 7-15-2019) Sec. Z10-35. Conditional Approval.
A. As part of approving a special exception, the hearing authority may impose such conditions, safeguards and restrictions upon the premises benefited by the special exception as may be necessary to avoid, minimize or mitigate any potentially adverse or injurious effect of such special exceptions upon other surrounding or nearby properties, to carry out the general purpose and intent of this Ordinance, or to further the goals and objectives of the Comprehensive Plan. Conditional uses should not be confused with conditions of approval, which are conditions specific to a special exception request that may be applied by the hearing authority in approving such application.
B. Such conditions may consist of any of the same conditions that can be applied to a zoning map amendment under Sec. Z10-16, Conditional Zoning, Subsection A and shall be treated in the same manner as required for a zoning map amendment under Sec. Z10-16, Conditional Zoning, Subsection B.
C. Change in Conditions of Approval. Any application that proposes a change in the conditions of approval previously established by the hearing authority through action on a special exception shall be considered a new application and therefore subject to all procedures and provisions of this Ordinance regarding the approval of a special exception.
(Ord. of 7-15-2019) Sec. Z10-36. Proffered Conditions.
A. As part of an application for a special exception, the applicant may proffer in writing the provision of reasonable proposed conditions to apply and be part of the special exception sought to be approved by said application. Proffered conditions may include written statements, development plans, profiles, elevations, or other demonstrative materials.
B. Proffered conditions may be included as a condition of approval by the hearing authority, modified by such applicable body, or not included in their approval of the special exception.
Proffered conditions are not binding on the City and become effective, in whole, part or as modified, only through inclusion or reference in the motion for approval at the time the special exception is approved.
(Ord. of 7-15-2019) Sec. Z10-37. Implementation of Conditions of Special Exception Approval.
Conditions of approval for a special exception shall be implemented in the same manner as for a zoning map amendment under Sec. Z10-18, Implementation of Conditions of Zoning Approval.
(Ord. of 7-15-2019) Sec. Z10-38. Public Hearing.
A. No later than 120 calendar days after a special exception application has been accepted, a duly noticed public hearing shall be held by the hearing authority (i.e., the Planning and Zoning Commission, Board of Zoning Appeals, or City Council, as appropriate), regarding the application.
B. Legal Notice of the public hearing shall be given in the same manner as for a zoning decision under Sec. Z10-24, Public Hearings, Subsection A.
C. Procedures for holding the public hearing shall be the same as for a zoning decision under Sec. Z10-24, Public Hearings, Subsection B.
(Ord. of 7-15-2019) Sec. Z10-39. Issues for Consideration.
In considering a special exception application, the following factors shall be given reasonable consideration by the hearing authority. The applicant shall address all the following in its statement of justification or special exception plat unless not applicable, in addition to any other standards imposed by this Ordinance:
A. Whether the proposed special exception is consistent with the Comprehensive Plan.
B. Whether the proposed special exception will adequately provide for safety from fire hazards and have effective measures of fire control.
C. The level and impact of any noise emanating from the site, including that generated by the proposed use, in relation to the uses in the immediate area.
D. The glare or light that may be generated by the proposed use in relation to uses in the immediate area.
E. The proposed location, lighting and type of signs in relation to the proposed use, uses in the area, and the sign requirements of this Ordinance.
F. The compatibility of the proposed use with other existing or proposed uses in the neighborhood, and adjacent parcels.
G. The location and area footprint with dimensions (all drawn to scale), nature and height of existing or proposed buildings, structures, walls, and fences on the site and in the neighborhood.
H. The nature and extent of existing or proposed landscaping, screening and buffering on the site and in the neighborhood.
I. The timing and phasing of the proposed development and the duration of the proposed use.
J. Whether the proposed special exception will result in the preservation or destruction, loss or damage of any topographic or physical, natural, scenic, archaeological or historic feature of significant importance.
K. Whether the proposed special exception at the specified location will contribute to or promote the welfare or convenience of the public.
L. The traffic expected to be generated by the proposed use, the adequacy of access roads and the vehicular and pedestrian circulation elements (on and off-site) of the proposed use, all in relation to the public's interest in pedestrian and vehicular safety and efficient traffic movement.
M. Whether, in the case of existing structures proposed to be converted to uses requiring a special exception, the structures meet all code requirements of the City of Woodbury.
N. Whether the proposed special exception will be served adequately by essential public facilities and services.
O. The effect of the proposed special exception on groundwater supply.
P. The effect of the proposed special exception on the structural capacity of the soils.
Q. Whether the proposed use will facilitate orderly and safe road development and transportation.
R. The effect of the proposed special exception on environmentally sensitive land or natural features, wildlife habitat and vegetation, water quality and air quality.
S. Whether the proposed special exception use will provide desirable employment and enlarge the tax base by encouraging economic development activities consistent with the Comprehensive Plan.
T. Whether the proposed special exception considers the needs of agriculture, industry, and businesses in future growth.
U. The effect of the proposed special exception use in enhancing affordable shelter opportunities for residents of the City.
V. The location, character, and size of any outdoor storage.
W. The proposed use of open space.
X. The location of any major floodplain and steep slopes.
Y. The location and use of any existing nonconforming uses and structures.
Z. The location and type of any fuel and fuel storage.
AA. The location and use of any anticipated accessory uses and structures.
BB. The area of each use; if appropriate.
CC. The proposed days/hours of operation.
DD. The location and screening of parking and loading spaces and/or areas.
EE. The location and nature of any proposed security features and provisions.
FF. A description of any features above the roof line of any structures.
GG. The number of employees.
HH. The location of any existing and/or proposed adequate on and off-site infrastructure.
II. Any anticipated odors which may be generated by the uses on site.
JJ. Whether the proposed special exception uses sufficient measures to mitigate the impact of construction traffic on existing neighborhoods and school areas.
(Ord. of 7-15-2019) Sec. Z10-40. Effective of Issuance of a Permit for a Special Exception.
The issuance of a permit for a special exception shall not authorize the establishment or extension of any use nor the development, construction, reconstruction, alteration or moving of any building or structure, but shall merely authorize the preparation, filing and processing of applications for any permits or approvals which may be required by the codes and ordinances of the City, including, but not limited to, a building permit, a certificate of occupancy, site plan and subdivision approval.
(Ord. of 7-15-2019) Sec. Z10-41. Period of Validity.
As a condition of approval, a special exception may be granted by a hearing authority for a specific period of time, with expiration of the approval to occur at the termination of said period. In such case, an extension may be granted by the original approving body, upon written application in accordance with the requirements for an initial application for a special exception.
Historia
(Ord. of 7-15-2019)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.