Ir al contenido
Georgia Commons
Menú

Wrightsville · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 26 - SUBDIVISION DEVELOPMENT REGULATIONS / Article II - DESIGN STANDARDS

Sec. 26-34. Water; sewer; utilities.

Sobre este texto

  • As published by Municode, current through 2024-09-30
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Water systems. Water system mains shall be installed to supply the entire subdivision.

Such systems shall be designed with the approval of the city water engineer and may be connected to the city water system when property is dedicated to the city. The developer shall be required to complete all underground work for such utilities, including the provision of adequate service connections to each lot within the subdivision prior to paving of such subdivision roads.

(b) Sewerage.

(1) When the subdivision is located within the service area of an existing public sewerage system, sanitary sewers shall be installed in such a manner as to serve adequately all lots with connection to the public system. Where lots cannot be economically connected with a sewerage system or where such a system cannot be feasibly developed, they must contain adequate area for the installation of approved septic tank and disposal fields and must be approved in writing by the county health department.

(2) For the purpose of this chapter, it shall be considered economically feasible to develop a sewerage system when the total cost per lot for sanitary sewers does not exceed the cost per lot for septic tanks by more than 100 percent. In such event, a sewerage system with adequate collection sewers, servicing each lot and providing for a preliminary treatment facility including, among other methods, a properly constructed sewerage lagoon, shall be provided.

(3) All materials, equipment, labor, and other matters related to the sanitary sewerage system shall be provided by the developer. When considered feasible by the city engineer, new subdivisions may connect to public sewerage with costs borne by the developer.

(4) All sewer facilities shall be installed in accordance with the standards of the state department of natural resources and the county health department.

(c) Utility installation. Public utility installation costs for gas, telephone, electrical, cable television, and streetlights shall be borne by the developer or utility company. Installation shall be on street rights-of-way, specified easements, or under streets prior to paving of streets.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:wrightsville/zoning/26-34@2024-09-30-e848adb2fe

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.