Ir al contenido
Georgia Commons
Menú

Young Harris · Ordenanza de zonificación

Appendix A - ZONING / Article VI - AMENDMENTS, POWERS, DUTIES AND APPEALS

6.5.1. Building permit required.

Sobre este texto

  • As published by Municode, current through 2026-05-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(1) No building or other structure shall be located, erected, moved, added to, or structurally altered without a building permit. No building permit shall be issued except in conformity with the provisions of this ordinance.

(2) It shall be unlawful to commence the excavation or filling of any lot for construction of any building until a building permit has been issued for such work. Natural vegetation shall remain on all properties until a permit has been issued.

(3) A building permit shall not be required for the following:

a. Replacement of roofing covering, including asphalt shingles, mineral-surfaced roll roofing, metal roofing or other material, including minimal decking replacement, so long as no structural changes are made.

b. Movable cases, counters, and partitions not over five feet high.

c. Painting, wallpapering, tiling, carpeting, cabinetry, counter tops (if plumbing is not affected), millwork, and similar finish work.

d. Swings and other playground equipment accessory to a one or two-family dwelling.

e. Detached accessory structures of 100 square feet or less, or detached accessory structures of 300 square feet or less provided that such structure does not have electrical, plumbing or other utility service to it or in it.

f. Ordinary minor repairs may be made without a permit, provided that such repairs shall not violate any of the provisions of the technical codes or any other laws or ordinances. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting egress requirements; nor shall any ordinary minor repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety.

(4) Permit fees shall be established by the mayor and city council by separate resolution.

6.5.2. Permit applications. Each application for a permit, with the required fee, shall be filed with the building official on a form furnished by the City of Young Harris for a specific work to be done, including a general description and the location of the proposed work. The application shall be signed by the owner, his agent or contractor. The application shall indicate the proposed occupancy of the building or structure.

(1) Applications for building permits for the construction of, renovation of, or addition to buildings and structures other than for single-family (detached or duplex) residential uses shall require submission of two sets of plans bearing the seal of an architect or engineer, legally registered under the laws of this state regulating the practice of architecture or engineering. Such plans shall be drawn to scale showing the acreage and exact location of the lot, the actual dimensions of the proposed building(s) or structure(s) and their location on the lot, the distance of the proposed building(s) or structure(s) from all property lines and setback lines, and the number of dwelling units (if applicable). Topographic lines at mean sea level, both existing and proposed, drainage plans, proposed size and location of ingress/egress, water and/or sewer mains and services, both existing and proposed, including hydrants and meter size shall also be shown so as to allow the city to properly review the development proposal to ensure compliance with the zoning ordinance and other applicable Code standards. Applications must include the approval of the state fire marshal or a statement from the fire marshal that no approval is necessary.

(2) All applications for building permits for the construction of, renovation of, or addition to single-family (detached or duplexes) residential uses (including their accessory uses such as detached garages and outbuildings) require submission of plans drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, number of dwelling units (if applicable), footprint dimensions to scale and the proposed size and location of ingress/egress to the lot. If no alteration of the footprint of existing buildings or structures is planned, no such plans shall be required, and the applicant shall so state on its application.

(3) Where private sewerage systems are used, a copy of the permit for the septic system, issued by the Towns County Health Department, shall accompany the application for the permit.

6.5.3. Issuing Permits. The building official shall act upon an application for a permit within ten working days from the time application is filed with the City of Young Harris. If the building official is satisfied that the application is complete, the application will be forwarded to the planning commission for review at their next monthly meeting.

(1) If the application for a permit and the documents describing the work do not conform to technical codes, state law or this ordinance the planning commission shall return the application to the applicant with a written explanation of the reasons for refusal to issue the permit. This written notification shall be postmarked no later than ten working days from the time application is reviewed by the planning commission.

(2) Once the application meets all requirements the planning commission will forward the application with recommendations to the city council.

(3) Any person who begins any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fine of $100.00 per day from the beginning date of construction until permit application is received by the City of Young Harris, plus the price required for the permit or permits.

6.5.4. Conditions of permits. The planning commission may recommend, and the mayor and city council may impose, conditions which serve the purposes of this ordinance and the public welfare, regardless of whether or not they are proposed or consented to by the property owner.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 12-4-2018, §§ 2, 3; Ord. No. 2023-ORD-003, § 3, 6-6-2023; Ord. No. 2025-003, §§ 1, 2, 4-1-2025)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:young-harris/zoning/6.5.1@2026-05-06-ca8a27fd03

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Young Harris Zoning Ordinance, 6.5.1. Building permit required | Georgia Commons