Ir al contenido
Georgia Commons
Menú

Baldwin County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - FLOW RATE RESTRICTIONS ON PLUMBING FIXTURES

Sec. 18-62. Residential construction.

Sobre este texto

  • As published by Municode, current through 2025-04-15
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

On or after July 1, 1991, no construction may be initiated within the county for any residential building of any type which:

(1) Employs a gravity tank-type, flushometer-valve, or flushometer-tank toilet that uses more than an average of 1.6 gallons of water per flush; provided, however, this subsection shall not be applicable to one-piece toilets until July 1, 1992;

(2) Employs a shower head that allows a flow of more than an average of 2.5 gallons of water per minute at 60 pounds per square inch of pressure;

(3) Employs a urinal that uses more than an average of 1.0 gallons of water per flush;

(4) Employs a lavatory faucet or lavatory replacement aerator that allows a flow of more than 2.0 gallons of water per minute; or

(5) Employs a kitchen replacement aerator that allows a flow of more than 2.5 gallons of water per minute.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:baldwin-county/code/18-62@2025-04-15-0039088a7a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Baldwin County Code of Ordinances, Sec. 18-62. Residential construction | Georgia Commons