Baldwin County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 58 - UTILITIES / Article II - WATER
Sec. 58-24. Initial water service connections.
Sobre este texto
- As published by Municode, current through 2025-04-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Any customer or developer desiring to be provided water service by the county shall make an application for water service at the office of the Baldwin County Water and Sewer Department located at 3014 Heritage Road, Milledgeville, GA 31061, or other method approved by the the county. An application for water service shall be made at the Baldwin County Board of Commissioners Annex, 1601 N. Columbia Street, Milledgeville, GA 31061 once the building opens in 2020.
(b) If the water distribution system is adjacent to or directly across the road from the customer's property and no water line extension is required, service will be provided upon the customer requesting service and meeting the terms of this article and payment of all applicable fees, provided capacity is available.
(c) Upon complying with the above stated items, the customer will be placed upon the meter installation list. The connection and the meter will be installed by the county as soon as practicable thereafter. Application for water/sewer connection should be made 30 calendar days in advance. A service call fee, as set forth in the schedule of rates, fees, and penalties shall apply if site conditions hinder meter installation.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.