Part II - CODE OF ORDINANCES / Chapter 42 - FIRE PREVENTION AND PROTECTION / Article III - RAW WOOD WASTE PROCESSING/RECYCLING STORAGE AND OPERATIONS
Sec. 42-46. Plans.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The owner or operator shall develop the following plans for monitoring, controlling, and extinguishing spot fires and submit the plans to the director for review and approval.
(1) Facility site plan. Facility site plans shall be submitted to the director for all raw wood waste processing and recycling operations. Facility site plans shall include fire department access roads throughout, area division of piles, pile height and width, and all exposures. A copy of the facility site plan shall be maintained on-site.
(2) Operational and emergency plans. The following operational and emergency action plans shall be submitted to and be approved by the director prior to initiating operation.
a. Operational plan. At a minimum, the operational plan must include site layout, pile dimensions, fire access, water supply, site security, site operations, temperature monitoring, rotation, and diversion plan.
b. Emergency plan. Emergency plans shall include the facility operator's fire response actions, designated fire dispersal areas, equipment operators call back number, and initiation of incoming diversion plan. Emergency plans shall define the equipment necessary to process and handle the materials. All fires shall be reported to the fire department immediately upon discovery by calling 911.
(3) Equipment operator emergency callback plan. The operator shall implement and maintain a plan for rapid equipment operator response to the site. The maximum response time to the site for the equipment operator shall be within one hour of notification. The following equipment shall be on site: bulldozer, loaders, and heavy-duty equipment necessary to mitigate a fire. Skilled operators shall be available pursuant to an approved emergency callback plan. Notification procedure shall be maintained operational 24 hours a day, seven days a week. Notification may be by pager activation or telephone answering service or other approved means.
(4) Incoming waste diversion plan. The operator shall develop and submit a diversion plan for incoming green waste for implementation in the event of equipment failure or other inability to process and distribute green waste. The plan shall prevent stockpiling of waste on the site and unauthorized depositing of waste on or near the site. The operator shall initiate the diversion based on criteria in the operational and emergency plan without further direction from the fire department.
Historia
(Ord. of 3-28-2017, § 1)