Ir al contenido
Georgia Commons
Menú

Barrow County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 90 - UTILITIES / Article IV - SEWER USE

Sec. 90-115. CID permit, discharge reports and administration.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) County indirect discharge (CID) permit requirement. No new or existing significant industrial user shall discharge wastewater into the POTW without first obtaining a wastewater discharge permit from the chairman, except that a significant industrial user that has filed a timely application pursuant to subsection 90-115(b) may continue to discharge for the time period specified therein. The chairman may require users other than SIU's to obtain CID permits as necessary to carry out the purposes of this article. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this article and subjects the CID permittee to the sanctions set out in section 90-114. Obtaining a CID permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements.

(b) CID application and permit requirements. All significant industrial users, prior to discharging process wastewater, shall submit an original and two copies of an application and engineering report to the county for the purpose of obtaining a CID permit. The original and copies of said package shall be submitted to the chairman for review and comment. The engineering report shall contain the information specified in section 90-115 hereof. The user shall submit to the county revised plans whenever alterations or additions to the user's premises deviate from the originally submitted plans. Any currently connected significant industrial user who has not heretofore filed such a report shall file same with the county no later than six months after the effective date of this article. The board of commissioners may initiate inquiries concerning plan revisions and process changes at six-month intervals.

(c) Permit application. The application and report required by subsection (b), above, or other provisions of this section 90-115 shall contain, in units and terms appropriate for evaluation, the following information.

(1) Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW;

(2) Number and type of employees, hours of operation, and proposed or actual hours of operation;

(3) Each product produced by type, amount, process or processes, and rate of production;

(4) Type and amount of raw materials processed (average and maximum per day);

(5) Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge;

(6) Time and duration of discharges; and

(7) Any other information as may be deemed necessary by the chairman to evaluate the wastewater discharge permit application.

(d) Incomplete CID application. Persons who have filed incomplete applications will be notified in writing by the county that the application is deficient and the nature of such deficiency. The applicant will be given four days or within such extended period as allowed by the county to respond in writing. If no written response is received from the applicant in the time frame specified by the county, the county shall deny the request and notify the applicant in writing of such action.

(e) Evaluation of CID applications. All CID permit applications will be dealt with in accordance with procedure enumerated in this article.

(f) CID permit content.

(1) A wastewater discharge permit shall include such conditions as are deemed reasonable necessary by the chairman to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the

POTW.

a. Wastewater discharge permits must contain:

1. A statement that indicates wastewater discharge permit duration, which in no event shall exceed five years.

2. A statement that the wastewater discharge permit is nontransferable without prior notification to the county in accordance with this section 90-115, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit;

3. Effluent limits based on applicable pretreatment standards;

4. Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and

5. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.

b. Wastewater discharge permits may contain, but need not be limited to, the following conditions:

1. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;

2. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works;

3. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges;

4. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW;

5. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW;

6. Requirements for installation and maintenance of inspection and sampling facilities and equipment;

7. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and

8. Other conditions as deemed appropriate by the chairman to ensure compliance with this article, and state and federal laws, rules and regulations.

(g) Applicant's notification of proposed CID permit conditions and objection procedures.

Upon receipt draft CID permit, any person, including the applicant, shall have 30 calendar days to review same and file written objections with the county. Within 15 calendar days of receipt of an applicant's request or written objections, the county may schedule a meeting between itself and the applicant for the purpose of resolving the disputed CID permit issues.

If an applicant files no written objection to the draft permit proposed by the county, or a subsequent agreement is reached concerning the same, issuance of the permit will be in accordance with this article.

(h) Permission to discharge. Issuance of a CID permit by the county shall constitute permission by the county to discharge into the county POTW under the terms and conditions as enumerated in the CID permit. All users not required to operate under a CID permit, who currently contribute wastewater other than normal domestic sewage, and who discharge a rate in excess of 1,000 gallons per day shall comply with the provisions of section 90-117.

(i) Pretreatment facilities/compliance schedules. Users shall provide wastewater treatment as necessary to comply with this article and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in this section 90-115 within the time limitations specified by EPA, the state, or the chairman, whichever is more stringent.

Any facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the chairman for review, and shall be acceptable to the chairman before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the county under the provisions of this article.

(j) Baseline report requirements. Within 180 days after the effective date of a categorical pretreatment standard, or 180 days after the final administrative decision made upon a category determination submission under 40 CFR, part 403.6(a)(4), whichever is later, existing industrial users subject to such categorical pretreatment standards and currently discharging to or scheduled to discharge to a POTW shall be required to submit to the chairman a report which contains the information listed in subsection 90-11(k) of this section. At least 90 days prior to commencement of discharge. New sources and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the chairman a report which contains the information listed in subsection 90-115(k)(1)—(5).

New sources shall give estimates of the information requested in subsections 90-115(k)(4) and (5). New sources shall also be required to include in this report information on the method of pretreatment the source intends to use to meet applicable pretreatment standards.

(k) Baseline report contents.

(1) Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners;

(2) Permits. The user shall submit a list of any environmental control permits held by or for the facility;

(3) Description of operations. The user shall submit a brief description of the nature, average rate of production, and standard industrial classification of the operation(s) carried out by such industrial user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes.

(4) Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following:

a. Regulated process streams; and

b. Other streams as necessary to allow use of the combined waste stream formula of 40 CFR, part 403.6(e).

The chairman may allow for verifiable estimates of these flows where justified by cost or feasibility considerations.

(5) Measurement of pollutants.

a. The user shall identify the pretreatment standards applicable to each regulated process;

b. In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or chairman) of regulated pollutants in the discharge from each regulated process.

Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations;

c. A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques where feasible. The board of commissioners may waive flowproportional composite sampling for any industrial user that demonstrates that flow-proportional sampling is infeasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged.

d. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph.

e. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 CFR § 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR, parts 403.6(e) this adjusted limit along with supporting data shall be submitted to the chairman;

f. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR, part 136 and amendments thereto. Where 40 CFR, part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the chairman determines that the part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the chairman;

g. The chairman may allow the submission of a baseline report, which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures;

h. The baseline report shall indicate the time, date and place, of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the

POTW;

(6) Certification. A statement, reviewed by an authorized representative of the industrial user (as defined in section 90-111) and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O and M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; and

(7) Compliance schedule. If additional pretreatment and/or O and M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O and M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard.

a. Where the industrial user's categorical pretreatment standard has been modified by a removal allowance (40 CFR, part 403.7), the combined waste stream formula (40 CFR, part 403.6(e)), and/or a fundamentally different factors variance (40 CFR, part 403.13) at the time the user submits the report required by paragraph

(b) of this section, the information required by subsection (b)(6) and (7) of this section shall pertain to the modified limits.

b. If the categorical pretreatment standard is modified by a removal allowance (40 CFR, part 403.7), the combined waste stream formula (40 CFR, part 403.6 (e)), and/or a fundamentally different factors variance (40 CFR, part 403.13) after the user submits the report required by subsection 90-115(b) of this article, any necessary amendments to the information requested by subsections (b)(6) and (7) of this section shall be submitted by the user to the chairman within 60 days after the modified limit is approved.

(l) Analytical and sampling requirements for demonstrating continued compliance. All analyses conducted for compliance purposes shall be performed in accordance with procedures established by the Environmental Protection Agency under the provisions section 304(h) of the Act (33 U.S.C. § 1314(h)) and contained in 40 CFR, part 136 and amendments thereto or with any other test procedure approved by the Environmental Protection Agency. Sampling shall be performed in accordance with the techniques approved by the environmental protection agency. Except as indicated below, the user must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the chairman may authorize the use of time proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques.

(m) Signatory and certification requirements. All wastewater discharge permit applications and user reports must be signed by an authorized representative of the user and contain the following certification statement:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

(n) Compliance schedule. The following conditions shall apply to the schedule required by subsection 90-115(k)(7).

(1) The schedule shall contain increments of progress in the form of calendar dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment requirements for the industrial user to meet the applicable categorical standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc).

(2) No increment referred to in this subsection (n)(1) shall exceed nine months.

(3) Not later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the county including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for the delay, and steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the county.

(o) Notification of changes to system. Each user must notify the chairman of any planned significant changes to the user's operations or system, which might alter the nature, quality, or volume of its wastewater at least 30 days before the change. The chairman may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a CID permit application. For purposes of this requirement, significant changes include, but are not limited to, flow increases of two percent or greater, and the discharge of any previously unreported pollutants.

(p) Notification of violation. If sampling performed by a user indicates a violation, the user must notify the chairman within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the chairman within 30 days after becoming aware of the violation. The user is not required to resample if the POTW monitors at the user's facility at least once a month, or if the POTW samples between the user's initial sampling and when the user receives the results of this sampling.

(q) Maintenance of records. Any industrial user subject to the reporting requirements established in this section shall maintain records of all information resulting from any monitoring activities required by this section. Such records shall include for all samples:

(1) The date, exact place, method, and time of sampling and the names of the persons taking the samples;

(2) The dates analyses were performed;

(3) Who performed the analyses;

(4) The analytical techniques/methods used; and

(5) The results of such analyses.

(r) Periodic reporting/retention of records. Any user classified as a significant industrial user (SIU), shall submit to the county during the months of June and December, unless required more frequently in the categorical standard or by the county, a report indicating the nature and concentration of pollutants in the effluent, which are limited by such categorical standards. In addition, this report shall include a record of all daily flows during the reporting period, including those, which exceeded the average daily flow reported in subsection 90-115(k)(5). At the discretion of the county and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the county may agree to alter the months during which the reports are to be submitted. If mass limitations have been imposed on the industrial user's discharge, the report required by this subsection (r) shall indicate the mass of pollutants regulated by categorical standards in the discharge of the industrial user.

Any industrial user subject to the reporting requirement established in this subsection (r) shall be required to retain for a minimum of three years any records of monitoring activities and results (whether or not such monitoring activities are required by this subsection (r)) and shall make such records available for inspection and copying by the county, the EPD or the EPA. This period of retention shall be extended during the course of any unresolved litigation regarding the industrial user or when requested by the county, the EPD or the environmental protection agency.

(s) Confidentiality of records. Any records, reports or information obtained in accordance with this article are intended to be used to determine applicable effluent limitations, toxic conditions, pretreatment requirements or permit conditions and shall be available to the public, except that, upon showing satisfactory to the county by any person, records, reports, or information, or particular part thereof (other than effluent data), to which the county has access to under this section, if made public would divulge methods or processes entitled to protection as trade secrets of such person, the county shall consider such record, report or information, or particular portion thereof, confidential in accordance with the purposes of this section, except that such record, report or information may be disclosed to officers, employees or authorized representatives of the State of Georgia or the United States concerned with carrying out the provisions of the Clean Water Act or when relevant in any proceeding under this article or other applicable laws.

(t) Duration of permits. CID permits shall be issued for a period between three and five years. Users becoming subject to National Categorical Pretreatment Standards shall apply for new permits on the effective date of said standards.

(u) Permit renewal. A user must apply in writing to the county for a renewal permit within the period of time not more than 90 days and not less than 30 days prior to expiration of the current permit.

(v) Permit modifications. The chairman may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons:

(1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements;

(2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance;

(3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;

(4) Information indicating that the permitted discharge poses a threat to the county's POTW, county personnel, or the receiving waters;

(5) Violation of any terms or conditions of the wastewater discharge permit;

(6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;

(7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR section 403.13;

(8) To correct typographical or other errors in the wastewater discharge permit.

(w) Transfer of CID permit. CID permits are issued to a specific user for a specific operation.

A CID permit shall not be reassigned or transferred or sold to a new owner, new user, or for different premises, without permission of the chairman. Upon the chairman's approval of the transfer, the original permittee must supply the new user with a copy of the permit.

(x) Applicable costs. All costs incurred by users in the design, construction and continuous maintenance of any type facility required by a CID permit shall be the sole responsibility of that user.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-27-2001, § 5)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:barrow-county/code/90-115@2026-11-23-b44145e922

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Barrow County Code of Ordinances, Sec. 90-115. CID permit, discharge reports and administration | Georgia Commons