Ir al contenido
Georgia Commons
Menú

Barrow County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 90 - UTILITIES / Article IV - SEWER USE

Sec. 90-121. Private wastewater disposal.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Sewer not available. Where a public sanitary sewer is not available, the building sewer shall be connected to a private individual on-site sewage disposal system complying with the provisions of this section.

(b) Approval and construction design. Before an individual on-site sewage disposal system is installed, the owner must first obtain approval from the county health department or other agency having legal jurisdiction.

(c) Communal on-site sewage disposal prohibited. Privately financed wastewater disposal plants serving more than one residence or more than one property are prohibited. If a property does not use an individual on-site sewage disposal system, it must be connected to a sewer leading to a POTW.

(d) Septic tank leach fields. The type, capacity, location, and layout of individual on-site sewage disposal systems shall comply with the requirements of all local state and federal agencies. All septic tank and leach field systems or individual on-site alternative systems must have the approval of the county health department. No septic tank system shall be permitted to discharge to any natural outlet or receiving stream.

(e) Maintenance of individual disposal systems. The owner of a septic tank leach field system shall operate and maintain the private wastewater disposal facility in a sanitary manner at all times at no expense to the board of commissioners.

(f) Public sewer connection. At the written instruction of the county health department or by the chairman, a connection to the public sewer shall be made within 90 days at the property owner's expense, and the individual on-site disposal system abandoned according to health department requirements.

(g) Public sewer availability. At such time as a public sewer becomes available to a commercial/industrial property served by a private wastewater disposal system, as provided in subsection (f) above, a direct connection shall be made to the public sewer within 90 days in compliance with this article, and any septic tanks, cesspools, and similar private wastewater disposal facilities shall be cleaned of sludge and filled with suitable material.

(h) Maintenance. The owner shall operate and maintain the approved private wastewater disposal facilities in a sanitary manner at all times, at no expense to the county unless otherwise agreed by all parties concerned.

(i) Safety. All excavations and operation areas for privately financed wastewater disposal systems shall be adequately guarded with barricades and lights so as to protect the public from hazard.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-27-2001, § 11)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:barrow-county/code/90-121@2026-11-23-b846c67919

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Barrow County Code of Ordinances, Sec. 90-121. Private wastewater disposal | Georgia Commons