Barrow County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 90 - UTILITIES / Article V - ILLICIT DISCHARGE AND ILLEGAL CONNECTION / Division 1 - GENERALLY
Sec. 90-154. Definitions.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Accidental discharge: A discharge prohibited by this article that occurs by chance and without planning or thought prior to occurrence.
Applicant: A person submitting a post-development stormwater management application and plan for approval.
Authorized enforcement agency: The public works department of the county.
Best management practice: Sediment and erosion control and stormwater management practices approved by the department of public works or agricultural runoff control practices approved by the soil conservation district to mitigate adverse effects of land use activities, runoff, sedimentation, and nonpoint source pollution on stream bank erosion, stream hydrology, surface and groundwater replenishment.
Board of commissioners: The Board of Commissioners of Barrow County, Georgia or its agent or representative.
Channel: A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
County's separate storm sewer system: Any facility designed or used for collecting and/or conveying stormwater, including but not limited to any roads with drainage systems, highways, county streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural, man-made or altered drainage channels, reservoirs, and other drainage structures, and which is:
(1) Owned or maintained by the county;
(2) Not a combined sewer; and
(3) Not part of a publicly-owned treatment works (POTW).
Clean Water Act: The Federal Water Pollution Control Act (33 U.S.C. §§ 1251 et seq.) and any subsequent amendments thereto.
Conservation easement: An agreement between a land owner and the county or other governmental agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.
Construction activity: An activity subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits. Such activities include but are not limited to clearing and grubbing, grading, excavating, demolition and other projects resulting in land disturbance.
Detention: The temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling peak discharges.
Detention facility: A detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.
Developer: A person who undertakes land development activities.
Development: A land development or land development project.
Drainage easement: An easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.
Erosion and sedimentation control plan: A plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention: The detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme flood protection: Measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.
Flooding: A volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.
Greenspace or open space: Permanently protected areas of a site that are preserved in a natural state.
Hotspot: An area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.
Illegal connection: Either of the following:
(1) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the county's storm drain system, including but not limited to any conveyances which allow any non-stormwater discharge such as sewage, chemicals, process wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or
(2) Any pipe, open channel, drain or conveyance connected to the county's separate storm sewer system which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency.
Illicit discharge: Any direct or indirect non-stormwater discharge to the county's separate storm sewer system, except as expressly exempted under the provision of this article.
Impervious surfaces: Those areas, which prevent or impede the infiltration of stormwater into the soil as it entered in natural conditions prior to development. Common impervious surfaces include, but are not limited to, rooftops, sidewalks, walkways, patio areas, driveways, parking lots, storage areas, compacted gravel and soil surfaces, awnings and other fabric or plastic coverings.
Industrial activity: Activities subject to NPDES Industrial Permits as defined in 40 CFR, Section 122.26 (b)(14).
Industrial stormwater permit: A National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries, which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Infiltration: The process of percolating stormwater runoff into the subsoil.
Inspection and maintenance agreement: A written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.
Jurisdictional wetland: An area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.
Land development: Any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious surface.
Land development activities: Those actions or activities that comprise, facilitate or result in land development.
Land development project: A discrete land development undertaking.
National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit:
A permit issued by the Georgia EPD under authority delegated pursuant to 33 USC §1342 (b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
New development: A land development activity on a previously undeveloped site.
Nonpoint source pollution: A form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agriculture, silviculture, mining, construction, subsurface disposal and urban runoff sources.
Non-stormwater discharge: Any discharge to the storm drain system that is not composed entirely of stormwater.
Nonstructural stormwater management practice or nonstructural practice: Any natural or planted vegetation or other nonstructural component of the management plan that provides for or enhances stormwater quality and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.
Off-site facility: A stormwater management facility located outside the boundaries of a site.
On-site facility: A stormwater management facility located within the boundaries of a site.
Overbank flood protection: Measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through 25-year frequency storm events.
Owner: The legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit: The permit issued by the county to the applicant, which is required for undertaking any land development activity.
Person: Except to the extent exempted from the provisions of this chapter, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county or other political subdivision of Georgia, any interstate body or any other legal entity.
Pollutant: Anything that causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids;
cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals;
non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations that may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any other kind.
Pollution: The contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gas, solid, radioactive material, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.
Post-development: Refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.
Pre-development: Refers to the time period or the conditions that exist on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs, such as in the case of preliminary grading, roads and utilities, the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.
Premises: Any building, lot, parcel of land, or portion of land, whether improved or unimproved, including adjacent sidewalks and parking strips.
Project: A land development project.
Publicly owned treatment works or POTW: A treatment works as defined by Section 212 of the Act (33 U.S.C. 1292) which is owned, in this case, by the county. This definition includes any sewers that convey wastewater to such treatment works, but does not include pipes, sewers, or other conveyances not connected to a facility providing treatment. The term shall also mean Barrow County, Georgia, a governmental body, which has jurisdiction over the indirect discharges to and the discharges from such a treatment works.
Redevelopment: A land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff or cause additional nonpoint source pollution.
Regional stormwater management facility or regional facility: Stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.
Responsible party: Any person (as that word is defined in this section) that is responsible for a facility, activity, or operation, or that is responsible for emergency response for a facility, activity, or operation, that will or may result in pollutants entering stormwater or the county municipal separate storm sewer system, regardless of whether that person is an owner, operator, or holds another position of responsibility.
Runoff: Stormwater runoff.
Site: The parcel of land being developed, or the portion thereof on which the land development project is located.
State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.
Stormwater better site design: Nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious surface and using natural features for stormwater management.
Stormwater management: The collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater management facility: Any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure: Any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan: A document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this article.
Stormwater management system: The entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site.
Stormwater retrofit: A stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff or stormwater: Any surface flow, runoff, or drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.
Structural stormwater control: A structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of the stormwater.
Subdivision: The division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
Waters of the state: Any water, surface or underground, within the boundaries of the state.
Historia
(Ord. of 11-22-2005(2), § 2)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.