Bartow County · Código de ordenanzas
Chapter 18 - BUILDING CODE / Article II - BUILDING CODE / Division 4 - GENERAL REQUIREMENTS
Sec. 18-117. Permit required.
Sobre este texto
- As published by Municode, current through 2026-09-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, or change the occupancy of a building or a structure, or to erect, install, enlarge, alter, repair, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the standard building codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work, except as exempted below. Any time a new non-residential business is beginning operation in an existing structure, or any time a new tenant is to occupy an existing non-residential structure, such person or entity shall be required to notify the building official and obtain an inspection prior to obtaining a business license and/or beginning tenancy (such requirements shall not apply to residential tenants such as apartment renters). It shall be unlawful to commence construction of a building or structure requiring a permit without first obtaining a permit, as required herein. It shall be unlawful to commence any land disturbance activity for the construction of any building; to commence construction of any building; to commence the moving or alteration of any building; or to commence the development of land for a use not requiring a building, until all necessary permits for such work have been issued.
Building permits shall be required as listed in this chapter, and land disturbance permits as CD18:12.1 Supp. No. 13
required by the Bartow County Soil Erosion and Sedimentation Control Ordinance. All land development or construction shall comply with the codes and ordinances in effect in Bartow County at the time the permit is issued.
Historia
(Ord. of 1-3-2007(1))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.