Ir al contenido
Georgia Commons
Menú

Bartow County · Código de ordenanzas

Chapter 18 - BUILDING CODE / Article II - BUILDING CODE / Division 4 - GENERAL REQUIREMENTS

Sec. 18-129. Partially-built structures.

Sobre este texto

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The county finds that partially-built and subsequently abandoned homes and other building and structures are occurring more frequently and are an aesthetic harm to the community;

they also reduce property values of adjacent and nearby property; they create a public safety hazard in that they can be dangerous; and they invite illicit activity. The county finds such structures to be a nuisance. Therefore, it shall be unlawful for a property owner to leave a residential, commercial or industrial structure in a partially-built status for more than six months with no substantial progress occurring on the construction. Partially-built means foundations that are poured or erected; basements that have been dug and partially completed;

and structures that have been framed or dried-in (siding, roofing, windows and doors in place) but not completed. For homes that have been damaged by fire or disaster after completion, see section 10.1 of appendix A, the zoning ordinance. It shall be permissible to finish the exterior of a commercial shopping center or other commercial or industrial building without buildingout the inside. It shall also be a violation for a partially completed building or structure to remain unfinished without a certificate of occupancy more than 30 days after the expiration of its building permit (building permits expire one year from issuance unless extended; see section 18-168). The building official shall be authorized to issue citations to the property owner or builder, and shall be authorized to seek abatement of the nuisance in magistrate court or superior court.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-1-2010, § IV)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bartow-county/code/18-129@2026-09-02-babccf12c1

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.