Bartow County · Código de ordenanzas
Chapter 18 - BUILDING CODE / Article II - BUILDING CODE / Division 9 - CERTIFICATES
Sec. 18-322. Issuance of certificate of occupancy.
Sobre este texto
- As published by Municode, current through 2026-09-02
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the standard building codes, reviewed plans and specifications, and after the final inspection, the community development director, or his/her designee, shall issue a certificate of occupancy stating the nature of the occupancy permitted.
Historia
(Ord. of 1-3-2007(1); Ord. of 11-4-2020(2), § V)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.