Sec. 34-557. Exemptions from stormwater management standards.

Sobre este texto

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

This article does not apply to the following activities:

(1) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;

(2) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;

(3) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration;

(4) Repairs to any stormwater management system deemed necessary by the county engineer;

(5) Agricultural practices as described O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 34-556(a) or (b);

(6) Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 34-556(a) or (b);

(7) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits;

(8) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project or governed by the preceding stormwater ordinances when the lot was platted;

CD34:95 Supp. No. 14

(9) A-1 district lots five acres or greater in size upon approval of the county engineer;

and

(10) Additions or modifications to existing single-family or duplex residential structures.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 8-4-2021(1), § 1)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bartow-county/code/34-557@2026-09-02-73e22dffd9

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bartow County Code of Ordinances, Sec. 34-557. Exemptions from stormwater management standards | Georgia Commons