Ir al contenido
Georgia Commons
Menú

Bleckley County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 14 - BUILDINGS AND BUILDING REGULATIONS / Article IV - PERMITS

Sec. 14-83. Certificates of completion.

Sobre este texto

  • As published by Municode, current through 2023-08-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Issuance. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.

(b) Service utilities; connections. No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued.

(1) Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.

(2) Authority to disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the technical codes, in case of emergency, where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system, of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 6-20-1986(1), § 3.9)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bleckley-county/code/14-83@2023-08-17-67f6518e09

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.