Brantley County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 22 - BUILDINGS AND BUILDING REGULATIONS / Article III - BUILDING CODE / Division 3 - PERMITS
Sec. 22-109. Inspections.
Sobre este texto
- As published by Municode, current through 2025-04-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Existing building inspections. Before issuing a permit the building official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received. He shall make a record of every such examination and inspection and of all violations of the technical codes.
(b) Manufacturers and fabricators. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes.
(c) Inspection service. The building official may make, or cause to be made, the inspections required by subsection (f). He may accept reports of inspectors of recognized inspection services provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the technical codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service.
(d) Inspections prior to issuance of certificate of occupancy. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy.
(e) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy is issued by the building official.
(f) Required inspections. The building official, upon 24-hour advance notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code:
Slab/Block Construction Subfloor Construction Building saw—After the permit is issued Building saw—After the permit is issued Footing inspection—Before pouring Footing inspection—Before pouring
In-slab plumbing Subfloor framing inspection (before floor decking) Framing and rough-in inspection Framing and rough-in inspection Temporary (80%) power inspection Temporary (80%) power inspection Final inspection Final inspection
(g) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. The building official shall provide written release only after an inspection has been made of successive step in the construction or installation as indicated by each of the foregoing three inspections.
(h) Reinforcing steel, structural frames, insulation, plumbing, mechanical, gas, fire protection or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, gas, electrical, fire protection work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official.
(i) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received.
(j) Any person, firm, corporation or agent who shall violate a provision of the technical codes, or fail to comply therewith, or with any of the requirements thereof, or who shall erect, construct, alter, install, demolish or move any structure, electrical, gas mechanical or plumbing system, in violation of a detailed statement or drawing submitted and permitted there under, shall be guilty of a misdemeanor. Each such person shall be considered guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this Code is committed or continued, and upon conviction of any such violation such person shall be punished within the limits and as provided by state laws.
Historia
(Ord. of 10-13-2009, § 309)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.