All utilities shall conform to the following requirements:

606.1 (Reserved).

606.2 Private or Individual Water and Sewer Systems. Where either public water or public sewers or both are determined by the County Commission not available to a subdivision, and a subdivider shall decide to establish a private water supply system and a private sewer system or allow individual systems then plans and specifications for such private or individual water and sewage systems shall be approved by the Environmental Protection Division of the Georgia Department of Natural Resources or the Brantley County Health Department, where appropriate, and shall be so installed as to simplify later connection to public utility systems, where determined to be appropriate by the County Commission or its designee.

606.3 Fire Hydrants. Fire hydrants shall be required for all subdivisions to be served by a public water system, and when determined by the County Engineer for subdivisions served by private water systems. As required by the International Fire Code and as adopted by the Brantley County Board of Commissioners, fire hydrants shall be located no more than five hundred feet (500') apart and within five hundred feet (500') of any structure and shall be on an minimum six inch (6") water line main with a residual pressure of 20 psi. To eliminate future street openings, all underground utilities for fire hydrants, together with the fire hydrants themselves and all other supply improvements shall be installed and approved by the County Engineer before any final paving of a street shown on the subdivision plat. Do you want a requirement for dry hydrants?

606.4 Tracer Wire. Tracer wire or tape, as approved by the County Engineer, shall be placed with all buried nonmetallic utility lines (trunk lines and lateral service lines) and underground irrigation systems.

606.5 Street Lighting. Street lights shall be required at new street entrances on streets designated or classified as arterial streets where the ADT generated by the new street is two hundred (200) or more. Street lights shall also be required at new street entrances on streets designated or classified as collector streets where the ADT generated by the new street is nine hundred (900) or more. Street lights shall be provided by the developer and installed by the developer in accordance with design and specification standards approved by the County Traffic Safety Engineer. Street lights shall be in place prior to final inspection and approval by the County Engineer for all improvements.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 9-14-2010)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:brantley-county/code/606@2025-04-03-f3855ca4e8

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Brantley County Code of Ordinances, Sec. 606. Utilities | Georgia Commons