Ir al contenido
Georgia Commons
Menú

Bulloch County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 4 - BUILDINGS AND BUILDING REGULATIONS / Article II - TECHNICAL CODES / Division 2 - BUILDING AND RELATED CODES ADMINISTRATION

Sec. 4-51. Permits.

Sobre este texto

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Action on application.

(1) The building official is in charge of issuing building permits. The building permit will be issued if, upon review of the application, the building official is satisfied that the proposed project can meet the requirements of this chapter and all other applicable ordinances. The building official may require the submission of additional information in order to determine if the proposed project meets the requirements of this chapter.

(2) Applications for permits under this division shall be examined within five working days after filing. If, after examination, no objection is found to the same and it appears that the proposed work will be in compliance with the laws and ordinances applicable thereto, the application shall be approved and a permit issued for the proposed work.

If the building official determines that the proposed project as presented in the building permit application will not satisfy the requirements of this chapter, he/she will not issue a building permit. He/she will notify the applicant in writing within ten days of the submission of the application, stating reasons for the refusal. The applicant will then need to confer with the building official to determine what he/she needs to do in order to comply with the ordinance and be eligible for a building permit.

(3) The issuance or granting of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this division. No permit presuming to give authority to violate or cancel the provisions of this division shall be valid, except insofar as the work or use which it authorizes is lawful.

(4) The issuance of a permit based on applications, plans and/or specifications shall not prevent the building official from thereafter requiring the correction of errors in the applications, plans and/or specifications or from preventing the work from being carried on thereunder when in violation of this division or of other ordinances of the county.

(5) The building official shall maintain a permanent record of the permit application and issuance thereof, which record shall indicate the name of the professional engineer or architect, if any, that has sealed the plans, specifications, plats or reports pursuant to which the building permit is issued. Such record shall include details on the size, type of building or structure, use for the building or structure and estimated cost of construction.

(b) Fees. The schedule of fees and charges, a copy of which is on file in the office of the clerk of the board of commissioners, shall control the fees to be charged for permits to be issued pursuant to this division. Failure to obtain the permit as provided herein shall result in the fee being doubled.

(c) Conditions of permit.

(1) All work performed under a permit issued shall conform to the approved application and plans and all codes or ordinances governing the work or equipment for which permits were issued. All work shall be performed by an individual contractor, firm or corporation licensed to perform such work except when performed by an individual installing, altering or repairing plumbing, plumbing fixtures, air conditioning and heating, air conditioning and heating fixtures, or electrical services in a single family dwelling owned and occupied by him.

(2) Individuals, contractors, firms or corporations licensed to perform work governed by this division shall register their license number with the building official before obtaining permits.

(3) Temporary signs shall be permitted on a parcel as long as the parcel has an active building permit and shall be removed when a certificate of occupancy has been issued.

(d) Expiration. A permit under which no work is commenced within six months after issuance, or where the work commenced is suspended or abandoned for six months, shall expire by limitation and fees paid shall be forfeited. The application, plans and specifications shall be reviewed and a new permit required before work is started or resumed.

(e) Revocation. The building official may revoke any building permit where there has been any false statement or misrepresentation as to a material fact or condition in the application or plans on which the permit was based, and upon such revocation, all construction, improvements or alterations as authorized by such permit or approval, shall cease until a valid building permit is issued.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Amd. of 4-5-05(1); Amd. of 1-19-10(1); Amd. of 4-5-11(1))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bulloch-county/code/4-51@2026-02-03-b5ed253c6a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Bulloch County Code of Ordinances, Sec. 4-51. Permits | Georgia Commons