Bulloch County · Código de ordenanzas
Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article IV - PROCEDURE FOR PLAT APPROVAL
Section 4.1. Scope.
Sobre este texto
- As published by Municode, current through 2026-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
The purpose of this article is to outline orderly processes and procedures for the application, review, consideration, and approval of plats, subdivisions, and planned developments. Approvals for certain types of applications are distinguished from each other and considered separately. Each type of action necessary for approval is described below.
4.1.1. Sketch plan. The purposes of the sketch plan are to familiarize the subdivider with the application regulations herein, while providing the approving authorities the opportunity to give proper input and feedback to ensure conformance with these regulations, other applicable laws and policies, and especially the zoning ordinance and the comprehensive plan.
4.1.2. Preliminary plat. The purposes of the preliminary subdivision plat are to provide the approving authorities the opportunity to review the detailed site and construction plans, which principally include the layout and specifications for lots, streets and utilities, drainage and topography; and, to ensure conformance with applicable laws and policies, especially environmental requirements, the zoning ordinance and the comprehensive plan.
4.1.3. Final plats and as-built plans. The purposes of the final plat are to provide the approving authorities the opportunity to verify that the requirements for the preliminary plat were met; to ensure conformance with applicable laws and policies, including, but not limited to, environmental requirements, the zoning ordinance and the comprehensive plan, to accept publicly dedicated lands, easements and infrastructure according to approved standards, and, to accept plats for legal recording prior to the sale of lots. A final plat that does not require sketch plan review may be filed and approved without going through the preliminary plat process. As-built plans may be approved administratively providing any variations substantially conform to the preliminary plat and construction plans. As-built plans must be filed and approved before any security for construction of infrastructure is released or, if no security is required, prior to the issuance of any certificate of occupancy for any structure in the subdivision.
4.1.4. Planned developments. The purposes of reviewing general development plans for planned developments are to provide the approving authorities the opportunity to ensure that certain group developments are designed and constructed to minimize traffic hazards, create a high-quality attractive development, and to provide appropriate improvements to mitigate potential negative impacts to surrounding neighborhoods. Conceptual site plans shall be submitted to the planning and zoning commission for review and approval.
4.1.5. The planning and zoning commission may impose conditions and modifications in approving sketch plans and conceptual site plans as may be necessary to protect the health, safety, and welfare of residents and to protect the surrounding landowners and neighborhoods.
Historia
(Amd. of 4-4-23(1))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.