Bulloch County · Código de ordenanzas

Appendix B - SUBDIVISION REGULATIONS (APRIL 4, 2023) / Article VI - REQUIRED IMPROVEMENTS

6.3.3. Street grading and surfacing.

Sobre este texto

  • As published by Municode, current through 2026-02-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) If the ditches on existing county roads are to be used for drainage from the subdivision, the developer will re-grade said ditches and provide drainage outlets according to county policies. All re-grading and drainage outlets shall be approved by the governing authority or its authorized representatives prior to issuing any building permits.

(b) In all subdivisions, regardless of size, if the minimum lot size is less than 20,000 square feet or the minimum lot width is less than 100 feet, paving will be required for all streets, including private streets, within the subdivision.

(c) Unless otherwise specifically set forth herein, all the materials, methods of construction, and workmanship for work performed in connection with road construction shall conform to the latest standard specifications of the Georgia Department of Transportation (GDOT). Design criteria and standards not specifically set forth herein shall conform to the current edition of the American Association of State Highway Transportation Officials (AASHTO) Geometric Design of Highways and Streets, except where specifically noted otherwise in the standards adopted by the county.

(d) Temporary construction access drives shall be installed for phased developments, when required by the county engineer.

(e) In subdivisions and planned developments that generate more than 1,000 daily trips on a local paved road accessing the development, the developer will be required re-surface the access road at each intersection at a distance of 100 feet in both directions from the centerline of the new intersecting street.

(f) Street grading, base preparation, and surfacing shall be carried out by the subdivider according to plans and specifications approved by the county and in accordance with the Georgia Department of Transportation specifications as noted in schedule 6.7.2.

6.3.4. Paved off-street parking. All driveways in residential subdivisions with a density of R-40 or higher shall be paved. All driveways and parking areas in nonresidential subdivisions or planned developments must be paved according to current county specifications and shall subsequently be owned and maintained by the developer or their successor(s).

6.3.5. Community water systems. When connection to a municipal or county water system is not available, a community water system is permitted, if it is designed and installed according to the requirements of the State of Georgia Environmental Protection Division, and where applicable, county fire protection standards. An approved, signed copy from EPD (Environmental Protection Division) of the water system plans must be submitted to the building and zoning official with the preliminary plat submission. The county will not accept ownership of any proposed water or wastewater utility constructed, owned or maintained by the applicant/developer, a private utility, or common interest element. The following improvement standards shall be required:

(a) Whenever any existing paved public road is crossed with water mains, the developer must secure an encroachment permit from the county before installing the mains.

(b) At the crossing, directional drilling may be authorized unless the county engineer determines that a steel casing with sufficient diameter must be jacked and bored to accommodate the carrier pipe. Continuous and uniform bedding shall be provided in the trench for all buried pipes.

(c) Backfill material shall be tamped in layers no greater than one foot in thickness around the pipe and to a sufficient height above the pipe to adequately support and protect pipe as well as prevent settlement of backfill.

(d) Thrust restraint shall be provided at all points where hydraulic thrust may develop.

This will include providing reaction blocking, tie rods or joints designed to prevent movement of all bends, tees, valves, plugs, hydrants and other points where thrust may develop.

(e) In subdivisions with 11 or more lots, systems shall be required to provide fire protection that includes hydrants that provide the needed fire flow simultaneous with domestic use, maintaining a minimum residual pressure of 20 psi, subject to approval of the county fire chief.

6.3.6. Public sanitary sewage and disposal. When a sanitary sewer is installed in a subdivision, sanitary sewers shall be installed to the plans and specifications approved by and in accordance with the rules and regulations of the county health department or other appropriate municipal, county or state agency. When a sewer line is in a street right-of-way and it will be necessary to cut into the street surface to serve the abutting lots, a connection shall be stubbed-out to the property line to serve each lot prior to surfacing the street.

6.3.7. On-site sewage disposal systems. When septic tank systems are required prior to the construction of any community sewage disposal system, such as private septic tanks, an oxidation pond or other facility, the location, size, plans and specifications of such a facility shall be approved by and be in accordance with the rules and regulations of the governing authority and the county health department or other appropriate state agency.

6.3.8. Curb and gutters. If concrete curbs or paved valley type gutters are installed, they shall be installed in accordance with plans and specifications prepared by an engineer and approved by the county engineer or the local governing authority or its designee. Curbs and gutters shall be constructed to accommodate the street drainage system. They may be required by the approving authority in areas of notable flash flooding, heavy rain runoff, or other areas prone to drainage problems.

6.3.9. Storm drainage. An adequate drainage system, including necessary open ditches, pipes, culverts, storm sewers, intersectional drains, drop inlets, bridges, detention facilities, and other necessary appurtenances shall be installed by the subdivider according to plans and specifications approved by the county engineer and, as applicable, in accordance with the county's stormwater management ordinance.

6.3.10. Pedestrian ways. Crosswalks and sidewalks may be required along county or state roadways external to the development by the planning and zoning commission or governing authority where it is deemed essential to provide circulation or access to schools, playgrounds, shopping centers, transportation, or other community facilities. Crosswalks and sidewalks shall be required along new public or private streets within intermediate or major subdivisions and planned developments by the planning and zoning commission or governing authority in the following zoning districts: R-25, R-15, R-8, R-3, R-2, PUD-1, PUD-2, and PUD-3. When sidewalk and crosswalk construction is required, construction must adhere to standards observed by the Americans with Disabilities Act Accessibility Guidelines and section 7.7.8 of these regulations. The sidewalk can be installed at the time of home construction to minimize damage from construction.

6.3.11. Access. The planning and zoning commission and the governing authority shall not approve a sketch plan or planned development in a location where the existing roads providing primary access are inadequate to serve the additional traffic generated by the development. Shared access may be required where, upon the county engineer's recommendation, reducing curbs cuts or driveways is desirable. The approving authority may consider safety as well as require available alternatives for regulating access to new developments or individual lots, upon the review of an access evaluation or traffic impact study. A subdivision or a planned development shall only be able to access new public or private streets built to serve the development. The costs for improvements necessary to improve safety or enhance accessibility shall be borne by the developer.

(a) The entire parcel, rather than simply a particular project, shall be considered in formulating and approving access plans. To this end, the administrative official may require a development project or subdivision on only part of a lot (an un-subdivided parcel) to design and provide access through the remainder of the parcel not proposed for land development at the time, or reserve such future access by easement or right-of-way.

(b) Where land proposed to be subdivided or developed includes only part of the tract owned or intended for subdivision or development by the subdivider or land developer, a tentative plan of a future road system for the portion not slated for immediate subdivision or land development consideration shall be required by the administrative official. When such tentative plan is required, it shall be prepared and submitted by the subdivider or land developer no later than the time of submission of lot subdivision or development plan approval, whichever occurs first.

(c) Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc., required as deemed necessary for safe traffic operations by the administrative official shall be installed at all entrance roads into a development where warranted. The county engineer shall use the current version of the Georgia Department of Transportation Regulations for Driveway and Encroachment Control, Section 4.9, "Auxiliary Turn Lanes," as may be amended from time to time, as a basis for determining whether deceleration lanes and other lanes are required; unless otherwise determined appropriate, if the DOT driveway regulations would require an improvement if the road were a state route, the director shall require the same such improvements which are as follows.

(d) Right-turn deceleration lanes. Right turn deceleration lanes must be constructed at no cost to the county if the daily site generated right turn volumes (RTV) based on the Institute of Transportation Engineers' publication Trip Generation (assuming a reasonable distribution of entry volumes) meet or exceed the values shown in the table below:

Posted Speed (miles per hour) Annual Average Daily Traffic (AADT) Two-Lane Routes More than Two Lanes on Main Road < 6,000 > or = 6,000 < 10,000 > or = 10,000 35 or less 200 RTV daily 100 RTV daily 200 RTV daily 100 RTV daily 40 to 50 150 RTV daily 75 RTV daily 150 RTV daily 75 RTV daily

55 to 60 100 RTV daily 50 RTV daily 100 RTV daily 50 RTV daily > or = 65 Always Always Always Always

(e) Left-turn lanes. Left turn lanes must be constructed at no cost to the county if the daily site generated left turn volumes (LTV) based on the Institute of Transportation Engineers' publication Trip Generation (assuming a reasonable distribution of entry volumes) meet or exceed the values shown in the table below:

Posted Speed (miles per hour) Annual Average Daily Traffic (AADT) Two-Lane Routes More than Two Lanes on Main Road < 6,000 > or = 6,000 < 10,000 > or = 10,000 35 or less 300 LTV daily 200 LTV daily 400 LTV daily 300 LTV daily 40 to 50 250 LTV daily 175 LTV daily 325 LTV daily 250 LTV daily

55 or over 200 LTV daily 150 LTV daily 250 LTV daily 200 LTV daily

(f) For any lot of record which existed prior to adoption of this ordinance but which does not have frontage on a public street or private street meeting the requirements of this ordinance, access may be obtained to and from that lot of record solely via any access easement which was lawfully established for access to such lot prior to the adoption of this ordinance.

(g) A new access easement shall not be authorized as the sole means of access to a lot, except when property is lawfully divided pursuant to the exception for lots in the AG-5 zoning district. This paragraph shall not be construed to limit use of access easements on lots that otherwise meet the access and lot frontage requirements of the zoning ordinance.

(h) In the event that a planned development or intermediate subdivision of 11 lots or more has access to a substandard road (i.e., a dirt, gravel or surface treated pavement road), the following project access improvements shall be required.

(1) The street shall be upgraded by the developer to a public road standard required in the Bulloch County Subdivision Regulations from the project entrance to the nearest standard paved road along the route of access.

(2) The developer shall design the road and provide the labor, equipment and materials required for roadway improvements and necessary drainage improvements.

(3) The right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the county. If the developer cannot acquire adequate right-of-way, the county attorney shall initiate acquisition proceedings at the expense of the developer after authorization by the board of commissioners.

6.3.12. Buffers, screening, and landscaping. When landscape plans or buffers are required or conditioned the following standards shall apply.

(a) A landscaping plan shall be prepared by a Georgia licensed landscape architect and submitted as required supplemental information referenced in schedule 5.6.3 of these regulations, providing sufficient detail to determine whether the required amount and type of materials that best serve the intended function has been selected.

(b) A planted buffer strip and visual screen in accordance with sections 405 through 407 of the county zoning ordinance is required unless it is determined by the planning and zoning commission or the board of commissioners that more restrictive standards are required by conditions for approval.

6.3.13. Open-space dedication. The approving authorities shall consider the location, access, quality and composition of common open space to be dedicated for a common interest element or public use before approval. Open space consisting of any utility and drainage easements shall not count as open space. Active recreation areas shall be owned by a common interest element, while passive open space such as linear parks or conservation easements may be offered for public dedication to the county. However, the board of commissioners must approve and accept any such dedication, which decision shall be made with input from the Bulloch County Parks and Recreation Department.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:bulloch-county/code/6.3.3@2026-02-03-18abd6638f