The schedules below shall be followed for the required improvements of all subdivision plats and general development plans for planned developments.
Schedule 6.7.1: Improvement Standards by Development Scale Improvement Minor (up to 10 lots) Intermediate (11—120 lots) Major (121 or more lots) Planned Development Site grading R R R R Street signs R R R R Paved streets R R R R Paved off-street parking R R R R Storm drainage R R R R Monuments and property markers R R R R On-site sewerage disposal R R R R Underground utilities(1) R R R R Clustered mailboxes(2) C R R R Community water system(3) C R R R Fire hydrants(3) C R R R Buffers and landscaping C R R R Streetlights(4) C R R R Open space C C C R Public water(5) C C C C Public sanitary sewer(5) C C C C Pedestrian ways(6) C R R R Curb and gutter(7) C C R R Required improvements (R). Required improvements are mandatory.
Conditioned improvements (C). The planning and zoning commission and the governing authority may require that the sub-divider install improvements as a condition of final development approval if it is specific and unique to the proposed development, provides amenities that fit the scale of the development, reduces nuisances, or improves the general health, safety and welfare of surrounding neighborhoods and the community.
(1) Except for junction boxes, meters and existing overhead utility lines, underground utilities shall only be required where new internal streets are constructed.
(2) If clustered mailboxes are required by the United States Postal Service, they will conform to such requirements, and locations where such mailboxes are required shall be installed on a separate parcel that is off of the right-of-way or travel lanes of roads or streets. Such location(s) shall provide adequate paved parking or queuing, and the access from the cluster box venue location shall be no closer than 100 feet from any public street intersection so as not to interfere with sight distances or traffic circulation. The location will be owned and maintained by the developer or a common interest element.
(3) Not required in subdivisions with lots at five or more acres.
(4) A county streetlight special district is required.
(5) May be required to tie on to an existing municipal or county system pursuant to a county ordinance or intergovernmental agreement.
(6) Reference 6.3.10 of this appendix (not required in AG-5, R-80, R-40).
(7) Not required in AG-5, R-80, R-40 zoning districts. Also not required in subdivisions with less than 81 lots in R-25 zoning districts.
Schedule 6.7.2: Improvement Standards for Street Grading and Surfacing Phase Standard I II
Sub-grade Shall be compacted to 100 percent of the laboratory maximum dry density.
See schedule 10.1.1 for inspections and testing requirements.
X X Graded aggregate-base Shall meet Georgia D.O.T. specifications and be no less than six inches in depth. Any alternative materials
shall be submitted to the county engineer for approval. It shall be compacted to 100 percent of the maximum dry density. See schedule
10.1.1 for inspections and testing requirements.
X X Asphalt mixtures Shall be approved by the county engineer and satisfy Georgia D.O.T.
specifications. Surface course shall be 9.5 mm or 12.5 mm asphalt superpave unless otherwise approved by the county engineer.
X Job mix formula A formula for hot mix asphalt shall be submitted to the county at least one week prior to paving. All mixtures must contain hydrated lime or anti-strip additive. Minimum thickness shall be two inches.
X Reflective markings Blue reflective raised pavement markers shall be required to identify fire hydrant locations. All other pavement markings and road striping shall meet Georgia D.O.T.
specifications.
X I—Laboratory Testing: To verify the above items, testing shall be done for every 1,500 square yards of material placed.
II—Subject to inspection and approval of county engineer or designee.
Schedule 6.7.3: Monuments and Property Marker Requirements Monuments:
Location Monuments shall be located in the ground at all angles in the boundaries of the subdivision; at the intersection lines of streets and at the intersection of the lines of streets with boundaries of the plat and at the intersection of alleys with the boundaries of the subdivision; at all points of curvature, points in the side lines of streets and alleys; and at all angles of an intermediate traverse line.
Monuments:
Placement It is not intended or required that monuments be placed within the traveled portion of a street to mark angles in the boundary of the subdivision if the angle points can be readily reestablished by reference to monuments along the side lines of the streets. All required monuments shall be placed flush with the ground where practicable.
If the required location of a monument is in an inaccessible place, or where the location of a monument would be clearly impracticable, it is sufficient to place a reference monument nearby and the precise location thereof shall be clearly indicated on the plat and referenced to the true point.
Monuments:
Materials All monuments used shall be made of a minimum of solid iron or steel bars at least one-half inch in diameter and 24 inches long. If a point required for a monument is on a bedrock outcropping, a steel rod at least one-half inch in diameter shall be drilled and grouted into solid rock to a depth of at least eight inches.
Monuments:
Control corners Within each block of a subdivision at least two monuments designed and designated as control corners shall be installed. All control corners shall be constructed of concrete and shall be at least four inches in diameter or square and not less than three feet in length.
Each monument shall have imbedded in its top or attached by a suitable means, a metal plate of noncorrosive materials and marked plainly with the point, the surveyor's registration number, the month and year it was installed and the words "control corner." Alternatively, the surveyor may provide Georgia East Zone, state plane coordinates on at least two corners within the subdivision with sufficient data to compute coordinates of all other corners. These coordinates shall be of the same accuracy as required by law for property surveys.
Property markers Property markers using steel or wrought iron pipe or the equivalent not less than one-half inch in diameter and at least 24 inches in
length shall set all corners, except those located by monuments.
Subdivision corner tie Subdivision corner tie. At least one corner of the subdivision shall be designated by course and distance (tie) from a readily discernible
permanent reference marker. If a corner is within 2,000 feet of a U.S.
Coast and Geodetic Station, U.S. Geological Survey, or Georgia Grid System coordinated monument, then this corner shall be marked with
a monument so designated by computed X and Y coordinates which shall appear on the map with a statement identifying this station or monument to an accuracy of 1:10,000. When such a monument or station is not available, the tie shall be made to some permanent and readily recognizable landmark or identifiable point, physical object or structure. In subdivisions of more than ten lots, the information for this corner tie shall include elevation above sea level making it in effect a benchmark which can be used to determine if individual lots are in a flood prone area.
Historia
(Amd. of 4-4-23(1); Amd. of 12-17-24)