Part II - OFFICIAL CODE / Chapter 54 - MANUFACTURED HOMES / Article III - SPECIAL EXCEPTION TEMPORARY HARDSHIP PERMITS FOR MANUFACTURED HOUSING

Sec. 54-72. Application procedure for temporary construction hardship permit.

Sobre este texto

  • As published by Municode, current through 2026-04-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The procedure for applying for a temporary construction hardship permit is as follows:

(1) Such permits are issued for six months.

(2) Persons requesting a construction hardship permit must have definite plans for construction of a permanent home on the property where the manufactured home is to be located and use the manufactured home only as a temporary residence until such construction is complete.

(3) Construction of the permanent dwelling must be complete within 18 months of the original issuance of the temporary construction hardship permit.

(4) The applicant must show substantial evidence that the temporary occupation of a manufactured home is his only recourse for shelter.

(5) The applicant must own the land, or be paying for it.

(6) The applicant must submit house plans to the planning and zoning commission prior to issuance of the temporary construction hardship permit.

(7) Prior to the issuance of the temporary construction hardship permit, the applicant and the county building inspector must work out a written time schedule under which the house is to be constructed. In no case can construction begin more than three months after the date of issuance of the original temporary construction hardship permit.

(8) The applicant must furnish proof to the planning and zoning commission that adequate financing is available for construction of the house.

(9) The applicant must sign an affidavit that he will comply with the written construction schedule worked out with the building inspector, and will comply with all requirements set up temporary construction hardship permit. This affidavit must also state that the applicant will remove the manufactured home from the property upon completion of construction of the permanent house.

(10) Any manufactured home issued a temporary construction hardship permit must have been constructed within the standards established under the National Manufactured Home Construction and Safety Standards Act (U.S. Public Law 93-383) and bear an insignia issued by the U.S. Department of Housing and Urban Development (HUD).

(11) Any manufactured home issued a temporary construction hardship permit must be placed so as to meet front, side and rear setback requirements as established in the county zoning ordinance for the zoning district in which the home is to be placed.

(12) Any manufactured home issued a temporary construction hardship permit must be placed on the lot such that it can meet wastewater disposal requirements of the county health department.

(13) The Butts County Planning and Zoning Commission and the Butts County Board of Commissioners will abide by a code of ethics that states that any member with a personal interest in an item to be discussed will not vote on that item.

(14) In cases where construction goes beyond the original six months permit period, all holders of such permits must reapply for a new temporary construction hardship permit at the time each six-month period lapses. The applicant must personally appear before the Butts County Planning and Zoning Commission and the Butts County Board of Commissioners hearing for renewal. In no case will a permit be renewed when 18 months have passed since the original permit was issued.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-16-1998(4), app. N, § B)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:butts-county/code/54-72@2026-04-13-fb3ea4b96a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Butts County Code of Ordinances, Sec. 54-72. Application procedure for temporary construction hardship permit | Georgia Commons