Sec. 150-88. Permitting, inspection, certificate of occupancy and fees.

Sobre este texto

  • As published by Municode, current through 2023-05-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Permit. A permit shall be required to locate a pre-owned manufactured home in the jurisdiction. To obtain a permit, applicants shall provide to the building inspector:

(1) An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by this Act;

(2) Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that the home meets the minimum health and safety standards of section 150-89;

(3) A $500.00 refundable guarantee of condition bond or $500.00 refundable cash deposit; and

(4) The permit and inspection fee required by of this section.

(b) Inspection. Prior to the relocation of the manufactured home to or within the county, the same shall be inspected by the county building inspector or other authorized agent. If the subject manufactured home is located outside the territorial boundaries of the county, the applicant, in addition to other fees and costs, shall pay the costs of the out-of-county inspection, as determined by the county.

(c) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant at such time that the building inspector certifies that the requirements of this division have been met.

(d) Fee. A permit and inspection fee to be set by the board of commissioners from time to time, the amount of which shall be commensurate with the expense of enforcing this division and shall be in line with other inspection fees charged by the county, shall be charged to the applicant to cover the cost to the county to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection. The applicant shall be charged a reasonable fee based on cost for each additional follow-up inspection that may be necessary.

(e) Out of county inspection. A separate inspection fee, the amount of which shall be determined by the board of commissioners and which shall be commensurate with the expense the subject inspection, shall be charged for inspections of pre-owned manufactured housing located outside of the county. No pre-owned manufactured home shall be brought into the county without first having been inspected.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 11-4-2010, § 3)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:charlton-county/code/150-88@2023-05-18-a2a0e24715

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Charlton County Code of Ordinances, Sec. 150-88. Permitting, inspection, certificate of occupancy and fees | Georgia Commons