Ir al contenido
Georgia Commons
Menú

Charlton County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Part A - GENERAL CODE OF ORDINANCES / Chapter 20 - ROADS AND BRIDGES / Article II - UTILITY ENCROACHMENTS / Division 1 - GENERALLY

Sec. 20-26. Location of utilities.

Sobre este texto

  • As published by Municode, current through 2023-05-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

All utilities crossing the right-of-way should be placed three feet below the ditch bottom and those running parallel with the right-of-way or the roadway should be placed either two feet inside the right-of-way on the back slope or on paved roads three feet from the edge of the pavement 2.5 feet deep. Cuts may not exceed 12 inches.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1999, § 15-32; Ord. of 2-4-1976, § 1)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:charlton-county/code/20-26@2023-05-18-9323f9ca4b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.