Ir al contenido
Georgia Commons
Menú

Cobb County · Código de ordenanzas

Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 122 - UTILITIES / Article II - WATER AND WASTEWATER SYSTEMS / Division 6 - NONDOMESTIC USE OF PUBLIC WASTEWATER FACILITIES

Sec. 122-187. Industrial pretreatment facilities.

Sobre este texto

  • As published by Municode, current through 2025-11-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Requirement. All users shall provide necessary wastewater pretreatment as required to comply with the limitations and provisions contained in this article and to achieve compliance with all federal categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations.

Any facilities required to pretreat wastewater to a level acceptable to the county shall be provided, operated and maintained at the user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the county for review and shall be acceptable to the county prior to

commencement of construction of the facility. The review of such plans and operating procedures will in no way relieve the user of the responsibility for modifying the facility as necessary to produce an effluent acceptable to the county under the provisions of this article. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be acceptable to the county prior to the user's

initiation of the changes.

(b) Compliance schedules. The timing of construction and operation of pretreatment facilities as required pursuant to this article shall be in accordance with the

compliance schedules provided to the county as described in subsection 122-186(b). However, the county shall also have the authority to issue compliance schedules independent of the permitting process, and such compliance schedules may be enforced by the county as provided in division 2 of this article.

(c) Maintenance of pretreatment facilities. All wastewater pretreatment facilities shall be properly and adequately maintained by the user so as to achieve the intended purpose of the facilities.

(d) Maintenance of operators. All pretreatment facilities shall maintain certified wastewater operators as required by the rules of the state board of examiners

for certification of water and wastewater treatment plant operators and laboratory analysts.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 6-28-88, § 3-26-98)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cobb-county/code/122-187@2025-11-20-28bf099d1e

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.