Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 1 - GENERALLY
Sec. 50-111. Maintenance of stormwater facilities—County owned.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All dedicated and accepted residential stormwater management facilities on land transferred to and accepted by the county shall be maintained by the county in such a manner as to maintain and enhance the public health, safety and general welfare to reduce and minimize damage to property, to reduce and minimize the impact of such facilities on land and stream channel erosion, to assist in the attainment and maintenance of water quality standards, to reduce local flooding, and to maintain, as nearly as possible, the preexisting development runoff characteristics of the area. The county shall not be responsible for aesthetic maintenance.
Historia
(Ord. of 9-28-93; Code 1977, § 3-22.5A-38; Ord. of 4-13-04; Amd. of 11-20-25)
Reuniones que se refieren a esta sección
- Cobb County Board of Commissioners, 12 de noviembre de 2025 (Actas)Se refiere a esta sección en las actas: “Sec. 50- 111”
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.