Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 3 - INSPECTION AND MAINTENANCE
Sec. 50-143. County participation in development agreement.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A voluntary development agreement between the applicant and the county may provide for additional storage capacity beyond that required by the applicant for on-site stormwater management in order to enhance or provide for the public health, safety and general welfare, to correct unacceptable or undesirable existing conditions or to provide protection in a more desirable fashion for future development. The manager,
or his designee, shall be authorized to negotiate, subject to ultimate approval by the board of commissioners, within the following guidelines:
(1) Require that the applicant grant any necessary easement over, through or under the applicant's property to provide access to or
drainage for such facility.
(2) Require that the applicant attempt, in good faith, to obtain from the owners of property over, through or under which the stormwater management facility is to be located, any easements necessary for the construction and maintenance of same; and failing the obtaining of such easement despite the applicant's good faith efforts, the county may, at its
option, assist in such matter by purchase, condemnation, dedication or otherwise, and subject to subsection (3) of this section, with any cost incurred thereby to be paid by the applicant.
(3) Participate financially in the construction of such facility to the extent that such facility exceeds the required on-site stormwater management.
Historia
(Ord. of 9-28-93; Code 1977, § 3-22.5A-25; Amd. of 11-20-25)
Reuniones que se refieren a esta sección
- Cobb County Board of Commissioners, 12 de noviembre de 2025 (Actas)Se refiere a esta sección en las actas: “Sec. 50- 143”
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.