Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 3 - INSPECTION AND MAINTENANCE
Sec. 50-159. Final inspection; as-built drawings; delivery of inspection and maintenance.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Certifying that the stormwater management system is functioning properly and was constructed in conformance with the approved stormwater management plan and associated hydrologic analysis,
(b) Submitting as-built drawings showing the final design specifications for all components of the stormwater management system as certified by a professional engineer,
(c) Certifying that the landscaping is established and installed in conformance with the BMP landscaping plan, and
(d) Delivering to the county a signed inspection and maintenance agreement that has been recorded by the owner in the property record for all parcel(s) that make up the site.
(e) The required certification under part (a) shall include a certification of volume, or other performance test applicable to the type of stormwater management
system component, to ensure each component is functioning as designed and built according to the design specifications in the approved stormwater management plan. This certification and the required performance tests shall be performed by a qualified person and submitted to the County with the request for a final inspection. The County shall perform a final inspection with applicant to confirm applicant has fulfilled these responsibilities.
Historia
(Ord. of 9-28-93; Code 1977, § 3-22.5A-29; Amd. of 2-9-21)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.