Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 3 - INSPECTION AND MAINTENANCE
Sec. 50-160. Final inspection and record drawing plans.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Upon completion of a project, and before acceptance for perpetual maintenance shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit record drawing plans which reflect actual constructed conditions for any stormwater management facilities or practices after final construction is completed. The plan must show the final design
specifications for all stormwater management facilities and practices and must be certified by the professional engineer who designed the facility or who is employed by the same consultant firm responsible for
the design. A final inspection by the Cobb County Community Development is required before the release of any performance securities can occur.
Historia
(Ord. of 9-28-93; Code 1977, § 3-22.5A-30; Ord. of 2-27-07; Amd. of 2-9-21)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.