Cobb County · Código de ordenanzas
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article VI - TREE PRESERVATION AND REPLACEMENT
Sec. 50-225. Enforcement of article.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) It shall be the duty of the director of community development to enforce this article. The director shall have the authority to suspend, stop or modify any land disturbance permit.
(b) The issuing authority shall have the power to withhold all permits, including, but not limited to, final certificates of occupancy, building permits and all other permits on the subject site as well as final plat approval until it is determined by the issuing authority that the site complies with this article and the provisions of the formal plan approved by the county. Notwithstanding
the foregoing, nothing in this section shall prohibit the issuing authority from enforcing the required maintenance period set out under this article.
Historia
(Ord. of 9-27-88; Code 1977, § 3-24.5-31; Ord. of 4-29 99)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.