Ir al contenido
Georgia Commons
Menú

Cobb County · Código de ordenanzas

División 4. CONSTRUCTION STANDARDS

22 secciones

Buscar en los códigos de Cobb County

Legible por máquinas https://georgiacommons.org/counties/cobb/code/~part-i/~chapter-122/~article-ii/~division-4.md · https://georgiacommons.org/counties/cobb.md · MCP https://mcp.georgiacommons.org/mcp

Contenido

  1. Sec. 122-111. Permit required for opening, altering or connecting to public water or wastewater facilities
  2. Sec. 122-112. Application for connection permit
  3. Sec. 122-113. Separate service to separate buildings
  4. Sec. 122-114. Utilization of previously used water and wastewater pipes and materials
  5. Sec. 122-115. Compliance with technical codes
  6. Sec. 122-116. Elevation of wastewater connections, check prior to pouring foundation
  7. Sec. 122-117. Conditions to determine if building is served by public wastewater system
  8. Sec. 122-118. Connection of downspouts, drains to wastewater system
  9. Sec. 122-119. Water and wastewater connections
  10. Sec. 122-120. Restoration of disturbed public property
  11. Sec. 122-121. Cross-connection control and backflow prevention
  12. Sec. 122-122. Temporary water supply standpipes in elbows only
  13. Sec. 122-123. Limitation on construction of permanent structures near water or wastewater easements
  14. Sec. 122-124. Capping and sealing of discontinued water and sewer connections
  15. Sec. 122-125. Location of water meters
  16. Sec. 122-126. Wastewater lift station
  17. Sec. 122-127. All water and wastewater facilities construction plans must be approved by the county
  18. Sec. 122-128. Fire hydrant installation and repairs
  19. Sec. 122-129. Fire service metering requirements
  20. Sec. 122-130. Sewer considerations for new developments
  21. Sec. 122-131. Commercial car wash requirements
  22. Secs. 122-132—122-150. ReservedReservada

Georgia Commons es independiente y no está afiliado a este condado ni a su editorial. Nada aquí es asesoría legal.