(a) Studied A zones, as identified in the FIS, shall be used to establish base flood elevations whenever available.
(b) The width of a floodway shall be determined from the FIS or FEMA approved flood study. If floodway data is not available, then it shall be determined by a registered professional engineer using a method approved by FEMA.
(c) General standards. All subdivision and/or development proposals shall:
(1) Be consistent with the need to minimize flood damage.
(2) Have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize or
eliminate infiltration of floodwaters and discharges from the systems in to
floodwaters.
(3) Have adequate drainage provided to reduce exposure to flood hazards.
(4) Provide access elevated to a minimum of one foot above the base flood elevation to residential developments.
(5) Provide access elevated to or above the base flood elevation to commercial developments.
(6) Have greater than 50 percent of each residential lot outside the limits of the special flood hazard area. In the R-A and R-1 zoning districts, the director or his/ her designee may reduce the percentage
of a residential lot that may be outside of the special flood hazard area, provided
that the lot is of sufficient size and topography that the buildable area that remains outside the special flood hazard area is determined by the director or
his/her designee to be adequate for the construction of the improvements proposed without subjecting them to unnecessary flooding risks.
(7) Provide the minimum lowest floor elevation for each residential lot encroached upon by the special flood hazard area.
(8) Provide base flood elevation data for all subdivision and other proposed development, including manufactured home parks and subdivisions, as determined from the FIS or a FEMA approved flood study. For
subdivisions and other proposed development, including but not limited to manufactured home parks, containing
land where no base flood data has been provided (A-Zone), which are either greater than 50 lots or greater than five acres, base flood elevations shall be
developed using detailed methodologies for submittal to FEMA as a letter of map revision (LOMR). Prior to approval of
the preliminary plat, the applicant shall submit a copy of the LOMR to the
administrator for review and approval using the community consent forms. The applicant shall be responsible for forwarding the LOMR submittal package to FEMA. The LOMR must be approved by
FEMA prior to the county's acceptance of the final plat. Any development activity conducted by the applicant prior to final LOMR approval by FEMA will be
performed at the risk of the applicant.
(9) Any physical changes to the base floodplain shall be submitted and approved by FEMA as a conditional letter of map revision (CLOMR) or conditional
letter of map amendment (CLOMA), whichever is applicable, prior to approval of the preliminary plat. The CLOMR
submittal shall be subject to approval by the administrator using the community
consent forms before forwarding the submittal package to FEMA for approval.
The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval from FEMA shall be the responsibility of the applicant. Prior to recording of the final plat, the applicant shall submit as-built surveys for a final letter of map revision (LOMR).
(d) Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of subsection 42-44(c) apply. This study shall be prepared by a currently registered professional engineer in the State of Georgia and made a part of the application for a permit. This information shall be submitted to and approved by the administrator prior to the approval of any permit which would authorize the disturbance of land located within floodplain. Such study shall include:
(1) Description of the extent to which any floodway or floodplain will be altered or relocated as a result of the proposed
development;
(2) Step-backwater analysis, using a FEMAapproved methodology. Cross-sections (which may be supplemented by the
applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base
flood profiles;
(3) Floodplain storage calculations based on cross-sections (at least one every 100
feet) showing existing and proposed floodplain conditions to show that base flood floodplain storage capacity would not be diminished by the development;
The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all floodplain encroachments.
(e) Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore the following provisions shall apply:
(1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development
within the regulatory floodway, except for activities specifically allowed in subsection (2) below.
(2) Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic
and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof;
and,
(3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the administrator until an affirmative
conditional letter of map revision (CLOMR) is issued by FEMA and no-rise certification is approved by the administrator.
(f) Maintenance requirements. The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on his property so that the flood-carrying or flood storage capacity is not diminished. The administrator may direct the property owner (at no cost to Columbia County) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the administrator.
(Ord. No. 14-05, § 1(Exh. A), 2-18-2014; Ord. No.
19-02, § 1(Exh. A), 3-5-2019)
Reuniones que se refieren a esta sección
- Columbia County Board of Commissioners, 21 de mayo de 2024 (Actas)Se refiere a esta sección en las actas: “Section 42-45”, “Section 42-45”
- Columbia County Development and Engineering Services Committee, 14 de mayo de 2024 (Actas)Se refiere a esta sección en las actas: “Section 42-45”, “Section 42-45”
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.