Columbia County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 54 - MOBILE HOMES AND TRAILERS / Article I - IN GENERAL
Sec. 54-9. Temporary use authorization.
Sobre este texto
- As published by Municode, current through 2026-02-17
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The temporary use allowing a mobile home or modular building used as a construction office, storage buildings, outdoor storage, and/or employee parking areas to be placed on an individual lot for nonresidential use shall be submitted in conjunction with a building permit application, land disturbance permit application, or site plan review. The location of the mobile home or modular building used as a construction office, storage buildings, outdoor storage, and/or employee parking areas shall be shown on a site plan submitted with the permit or review that has been requested. The applicant shall show it is necessary to use the above use for the preparation and completion of a construction project. Said request shall be reviewed in conjunction with the application it was submitted to the appropriate county departments. Adequate facilities shall be available for electrical, water, and/or sewerage or the appropriate permits will be obtained from the development services division with subsequent inspections as required. Upon approval, a temporary use permit shall be obtained from the development services division and posted in a conspicuous place at the approved location.
The temporary use permit shall expire one year from the date of approval of the temporary use permit or upon completion of such project, whichever first occurs, and such authorization may be renewed once following noticing procedures outlined in subsection (c) of this section.
(b) The planning director or his designee shall have the authority to approve a temporary use allowing a mobile home or modular building to be placed on an individual residential lot for nonresidential use when the applicant for such can show that the request is related to the marketing of a development under construction.
The property owner or their designated representative may make an application for a temporary use on forms provided by the director.
Upon receipt of the application, a public hearing shall be scheduled before the planning commission. Notice of the public hearing shall follow the requirements set forth in section 90-180(5). The public hearing shall follow procedures as outlined in section 90-180(6) of Columbia County Code.
Such temporary offices shall be authorized for three years or until the final lot in the development is sold or leased, whichever happens first.
Such authorizations may be renewed once at the discretion of the director or his designee.
(c) The planning commission may authorize the planning director or his designee to approve a temporary use allowing a mobile home or travel trailer to be placed on an individual lot for residential purposes. The property owner or their designated representative may make an application for a temporary use on forms provided by the director. Upon receipt of the application, a public hearing shall be scheduled before the planning commission Notice of the public hearing shall follow the requirements set forth in section 90-180(5). The public hearing shall follow procedures as outlined in section 90-180(6) of Columbia County Code. The request shall be reviewed using the following criteria:
(1) Special circumstances or existing conditions are such that the denial of such authorization would deprive the applicant of any reasonable or beneficial use of his land (mere loss in value will not justify approval), or that the denial of such
authorization would cause an undue hardship and burden on the applicant to the extent that a denial would be injurious to the applicant's physical wellbeing;
(2) The granting of such authorization or use shall not be injurious to the neighborhood or detrimental to the public welfare;
(3) That adequate facilities are available for electrical, water and/or sewerage or the appropriate permits will be obtained from the development service division with
subsequent inspections.
(d) Any authorization granted pursuant to subsection (c) of this section shall expire one year from the date of approval by the planning commission or the planning director or designee and may be renewed only once by following the procedures governing the original authorization.
(e) Any mobile home, modular building, or travel trailer placed on a site in accordance with the above regulations must meet the stated building setbacks for the lot on which it is placed.
(f) Upon written approval of the temporary use authorization by the planning commission or the planning director or designee, the approved applicant shall obtain a temporary use permit from the development services division to be posted in a conspicuous place at the approved location of the temporary use. All subsequent permits and inspections related specifically to the temporary use shall be input under this initial application.
(Ord. No. 19-08, § 1(Exh. A), 8-6-2019; Ord. No.
23-02, § 1(Exh. A), 6-20-2023)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.