Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE

Sec. 86-153. Reporting requirements.

Sobre este texto

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Each industrial user shall submit for evaluation with its original application for a wastewater discharge permit the information set forth in subsection (c) of this section.

(b) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the

POTW shall submit to the director a report which contains the information set forth in subsection

(c) of this section. At least 90 days prior to commencement of the discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director the information set forth in subsection (c) of this

section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.

(c) Users as set forth in subsections (a) and (b) of this section shall submit the following information to the director:

(1) Identifying information. The name and address of the facility, including the name of the operator and owner of such facility;

(2) Environmental permits. A list of any environmental control permits held by or for the facility;

(3) Description of operations. A brief description of the nature, average rate of production and standard industrial classifications of the operations carried out by such user. This description should include a

schematic process diagram which indicates points of discharge to the POTW from the regulated processes;

(4) Flow measurement. Information showing the measured average and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set forth in 40 CFR 403.6(e);

(5) Measurement of pollutants.

a. The categorical pretreatment standards applicable to each regulated process;

b. The results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or by the director, of

regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and longterm average concentrations, or

mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set forth in section 86-162;

c. Sampling must be performed in accordance with the procedures set forth in section 86-162;

(6) Certification and signature.

a. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional

operation and maintenance and/or additional pretreatment is required to meet the pretreatment standards and requirements;

b. All baseline monitoring reports must be signed and certified in accordance with section 86-148;

(7) Compliance schedule. If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment

standards, the shortest schedule by which the user will provide such additional pretreatment and/or operation and maintenance shall be submitted to the director.

The completion date in the schedule shall not be later than the compliance date established for the applicable pretreatWATER AND SEWERS § 86-153 ment standard. A compliance schedule

pursuant to this section must meet the requirements set out in section 86-154.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1979, § 2-7-62)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:columbia-county/code/86-153@2026-02-17-8c559a6413