Cook County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 58 - SUBDIVISIONS / Article IV - MINIMUM IMPROVEMENTS
Sec. 58-136. Building permit.
Sobre este texto
- As published by Municode, current through 2020-04-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
No permit for construction of any building or any lot of a proposed subdivision shall be issued unless the plat of the proposed subdivision has been recorded in the office of the county clerk of superior court and unless the minimum site improvements, as prescribed in this chapter, have been made, and such improvements have been inspected and approved by the county engineer. Building permits may be issued for a portion of a subdivision prior to the completion of the improvements in the entire subdivision only if a performance bond in the amount of 125 percent of the improvements as prescribed in section 58-54(i) is posted and accepted by the board of commissioners.
(Ord. of 7-7-1997, § 6-11)
APPENDIX A
Local Streets:
/2-inch asphalt concrete E, F, or H mix.
Over either:
Five inches soil cement or six inches graded aggregate and crushed limestone (compacted to modified density) or 61
/2 inch lime rock or ten inches sand/clay base course class B.
Collectors and above:
Two inches asphalt concrete E, F, or H.
Over either:
Six inches soil cement or seven inches graded aggregate crushed limestone (compacted to modified density) or 71
/2 inches lime rock or 12 inches sand/clay class B.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.