(a) The final inspection of any petitioned road must be completed by the county road superintendent a minimum of twelve (12) months after the last construction inspection.

Drainage problems and poor quality construction will be considered prior to recommendation for county acceptance.

(b) Petitioners are not allowed to promise that the county will accept the road. If such promise is made, the petitioner must pay damages to the purchaser in such amounts prescribed by statute.

(c) The county will not accept any road that has a grade greater than ten percent (10%).

(d) Crossfalls must be a minimum of one-eighth (1/8) inch per foot on all finished surfaces.

Super-elevated sections must be determined by the county road superintendent.

(e) The county may not desire to accrue a new road; therefore, even when the minimum standards have been met, the county may exercise its right not to accept a road into the system.

(f) Unless the county specifically desires to obtain a road, all efforts to obtain rights-of-way will be the responsibility of the party desiring to turn the road over to the county.

(g) When the county manager determines that a road qualifies for acceptance by the county, he/she will bring the matter before the board of commissioners. If the board of commissioners agrees that the road should be accepted, it will do so contingent on delivery of completed right-of-way deeds, within sixty (60) days.

(h) Alterations in the roadbed on existing roads must be presented to the county road superintendent and the county manager. If the determination is made to alter the roadbed for good reason, the petitioner must present a deed as required within sixty (60) calendar days after the board of commissioners has agreed to make such alterations.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. No. R 1-95, § V, 1-5-1995)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:dade-county/code/38-35@2024-09-05-ba829e6fb3

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Dade County Code of Ordinances, Sec. 38-35. Generally | Georgia Commons