Sec. 12-224. Permit application.
Sobre este texto
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Business license required. Applicants are required to purchase and maintain a valid business license as a condition of submitting and processing an application.
Application fee assessed.
Application fee must be paid at the time of submission.
• Base fee of $150.00.
• Additional fee of $2.00 per acre over one acre.
The following shall be contained in any special use permit application for an SES:
(a) Basic information. The applicant shall submit a document that lists the following:
(1) The address of the property on which the system or facility will be located;
(2) The applicant's name, address, telephone number, and email address;
(3) The property owner's name, address, telephone number, and email address;
(4) If known, the system or facility operator's name, address, telephone number, and email address;
(5) If known, the installation company's name, address, telephone number, email address, and license number; and evidence of the applicant's control of the property, such as a deed, lease, or option agreement with the landowner.
(b) Planning. The applicant shall submit the following, based on the most current and accurate information reasonably available:
(1) A site plan of the property that depicts the locations of all existing and proposed structures (including solar arrays, inverters, transformers, electrical substations, and buildings), property lines, rights-of-way, roads, required setbacks, and visual buffers;
(2) A topographic map that depicts vegetative cover, watersheds, or wetlands on the property;
(3) A visual buffer plan that demonstrates that any visual buffer (a) minimizes impacts of the system and/or facility on adjacent residential dwelling units, as required by this article, (b) preserves natural tree growth and natural land forms along the perimeter, as required by this article;
(4) A decommissioning plan that contains the following:
a. The name, address, telephone number, and e-mail address of the person(s) or entity(ies) responsible for implementing the decommissioning plan;
b. A statement of conditions that require the decommissioning plan to be implemented;
c. As part of decommissioning, a removal plan that identifies all structures, components, and non-utility owned equipment that shall be removed;
d. As part of decommissioning, a plan for recycling or otherwise reusing all materials to the extent reasonably practicable;
e. As part of decommissioning, a restoration plan to return the property to its condition prior to the installation of the system or facility or to some other condition reasonably appropriate for the designated land use after the system or facility is removed; and
f. A timeline to complete decommissioning.
(c) Construction traffic. Prior to the issuance of a building permit, the applicant shall provide a Construction Traffic Management Plan (CTMP) for review and approval by the county manager in coordination with the Dodge County Fire Chief, Dodge County EMS Director, Dodge County Sheriff, and the Dodge County Road Superintendent. A surety bond may be required to cover costs related to potential damage to public roads and right-of-way.
(d) Signage. Signage shall be placed around the proposed parcel in a conspicuous place informing the public of the potential solar farm. Signage shall be updated with the date, time, and location of the required public hearing when established (see section 12-225(f)).
(e) Certifications. The applicant shall submit an affidavit that provides, to the best of the applicant's knowledge:
(1) Construction, installation, operation and decommissioning of the system or facility will comply with all applicable federal and state laws;
(2) Commercial general liability insurance will be maintained throughout the siting, construction, installation, operation, and decommissioning of the system or facility.
Historia
(Ord. of 11-18-2024(1); Ord. of 11-3-2025, § 5A)