Douglas County · Código de ordenanzas
Chapter 14 - ROADS, STREETS AND SIDEWALKS / Article III - USE OF PUBLIC RIGHT-OF-WAY
Sec. 14-42. Approval of installation.
Sobre este texto
- As published by Municode, current through 2026-03-31
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
As to new installation, no public utility or CSP shall install any lines, wires, pipes or poles, or otherwise utilize a public right-of-way until after obtaining prior written approval from the county transportation department respecting the proposed location of said lines, wires, pipes, communications facilities, etc., in accordance with these regulations. The transportation department shall determine if the installed location and placement of any utility or CSP along a
public right-of-way meets the requirements of this article and the specifications of the county engineering department (see section 14-41). The transportation department shall then issue a written approval or disapproval to the public utility or CSP regarding the installation. Any installation made by any utility or CSP in a location other than that specified in this regulation or the county transportation department standard number 3.02 �Underground UtilitiesTypical Locations� must be removed and reinstalled in the proper location entirely at the
expense of the utility or CSP. Failure to reinstall at the proper location will result in the withholding of any further installation permits. Failure to conform to this article or the permit will result
in the withholding of any further installation permits.
Historia
(Ord. of 9-17-19, § 1(Exh. A))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.