Part II - CODE OF ORDINANCES / Chapter 34 - SUBDIVISIONS / Article III - SUBDIVISION PLATTING PROCEDURE AND REQUIREMENTS / Division 8 - ADMINISTRATIVE APPROVAL OF MINOR SUBDIVISION

Sec. 34-282. Bonds requirements.

Sobre este texto

  • As published by Municode, current through 2022-11-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

To ensure the adequacy and integrity of materials, construction and installation of public facilities and improvements, i.e., streets, drainageways and other infrastructure, the developer shall post a bond or certified check with the county building official. Said bond or certified check shall provide for and secure to the county a guarantee that the actual construction and installation requirements of the county have been met, and that a two-year maintenance and performance period shall be met.

(1) Required bond. The bond shall be with a surety company licensed to do business in the state or a letter of irrevocable credit from a bank and must be acceptable to the county attorney. It shall contain a provision indemnifying the county for all maintenance of installations and improvements required by these regulations in the subdivision for a period of two years following the date of final approval by the board of commissioners. The building official shall determine the

amount of the bond which shall be adequate to cover any failures of the improvements and drainage system. The appropriate fees are set per linear foot on dirt or paved roads. An irrevocable letter of credit, or a certificate of deposit assigned to the county may be substituted for a surety bond.

(2) Release of bond. The bond shall be released after an additional inspection by the county road superintendent indicates that all paving, drainage and other improvements have proven satisfactory and have withstood the two year test period.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 6-1-1998(2), ch. II, art. III, § 2.3-14)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:early-county/code/34-282@2022-11-07-e772ead1a4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.