Emanuel County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 18 - ENVIRONMENT / Article IV - SOIL EROSION AND SEDIMENTATION CONTROL / Division 2 - PERMIT PROCEDURES
Sec. 18-207. Application requirements.
Sobre este texto
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) No person shall conduct any land disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the board of commissioners to perform such activity.
(b) The application for a permit shall be submitted to the zoning administrator and must include the applicant's erosion and sedimentation control plan with supporting data, as necessary. Such plans shall include, as a minimum, the data specified in section 18-233. Soil erosion and sedimentation control plans shall conform to the provisions of sections 18-232 and 18-233. Applications for a permit will not be accepted unless accompanied by copies of the applicant's soil erosion and sedimentation control plans.
(c) A fee as provided in the schedule of fees and charges shall be charged for each acre or fraction of an acre in the project area.
(d) Immediately upon receipt of an application and plan for a permit, the issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. The results of the district review shall be forwarded to the issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by section 18-233(15) and (16), and bonding, if required as per subsection (e) of this section, have been obtained. Such review will not be required if the issuing authority and the district have entered into an agreement which allows the issuing authority to conduct such review and approval of the plan without referring the application and plan to the district.
(e) If a permit applicant has had two or more violations of previous permits, this section, or the erosion and sedimentation act, as amended, as set forth in O.C.G.A. § 12-7-1 et seq., within three years prior to the date of filing of the application under consideration, the issuing authority may deny the permit application. The issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction of an acre of the proposed land disturbing activity, prior to issuing the permit. If the applicant does not comply with this article or with the conditions of the permit after issuance, the issuing authority may call the bond or any part of the bond to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.