Emanuel County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 34 - MANUFACTURED HOMES / Article III - PERMITTING, USE AND PLACEMENT
Sec. 34-88. Administrative procedures.
Sobre este texto
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Only HUD Code or DCA approved manufactured homes, as defined in section 34-82, will be permitted for location in the county. Buildings or other structures designed primarily for storage which do not meet either the Georgia 1994, Standard Building Code, the HUD Code, or meet with DCA approval shall not be used for residential occupancy. Pre-HUD manufactured homes located within the county prior to the adoption of this article may be relocated outside the county, subject, however, to the other requirements for moving manufactured homes as provided herein. Only buildings or other structures, which were designed for human occupancy can be sold or leased for that purpose within the county.
(b) Site requirements. All manufactured homes must be located on an approved site which conforms with the standards outlined in this article and the county land use ordinance. Except that where such dwelling or structure shall be connected to an off-site central or public sewer system and public water system or community water system, the minimum lot size shall be one useable acre and conform to all other requirements of the county land use ordinance.
(c) Application procedure.
(1) No manufactured home may be moved into or relocated within the county or occupied until a building permit has been issued and properly completed, as applicable.
(2) Applications for a building permit shall be available at the county building official's office.
(3) The site permit and copy of the plat for the proposed manufactured home location may be obtained from the county Tax assessors office as provided herein. Plat copies that are not available at the tax assessors' office may be further obtained from the clerk of the superior court's office.
(4) The applicant, upon obtaining the building permit, will request from the county health department an on-site sewage permit for a new installation or an "existing on-site sewage management system performance evaluation report form" for connection to an existing system. The environmental health officer will annotate on the building permit that this step is completed and attach the appropriate document to the building permit.
(5) Installation must comply with section 34-89 below in order to obtain building official approval for occupancy. Such approval is necessary to obtain permanent electrical service. Manufactured homes will not be authorized to receive permanent electrical service until the provider of electrical service has been notified for approval for occupancy by the building official.
(6) Manufactured home dealers (sellers) responsible for the delivery and set-up of manufactured homes in the county shall comply with the installation requirements of this article and the statutes and regulations of the state, and shall, in any event, complete correction of such deficiencies as are identified by the building official within ten days. The failure to correct such installation and set-up deficiencies, unless prevented from doing so, shall constitute a violation of this article.
(d) Recreational vehicles.
(1) The above requirements do not apply to recreational vehicles. Recreational vehicles shall not be approved for permanent installation or permanent occupancy and may only be used for a maximum of 90 consecutive days within any 12-month period as a temporary residence. All recreation vehicles must display a current state license and registration. Building permits will not be issued for recreational vehicles.
(2) Recreational vehicles known as park models, park cabins or park lodges to are allowed to be installed in the county requiring the same set-up requirements and permitting requirements as a HUD approved home.
(3) Non-HUD or non-DCA approved structures which were not designed for residential use may be renovated and refurbished for non-permanent occupancy, which is defined as occupancy, which does not involve more than seven consecutive overnight stays within any 30-day period.
(4) At the option of the homeowner, so long as a manufactured home is properly installed, and the front landing erected as required by section 34-89(e), an extension not to exceed 60 days may be granted to complete final compliance, with all of the provisions of the county's manufactured home ordinance. If this option is chosen, a second inspection fee of $75.00 will be charged.
Historia
(Ord. of 9-18-2000, § 8; Amd. of 5-21-01; Amd. of 12-16-2002, § 8.4)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.