Sec. 54-67. Special use permit required.
Sobre este texto
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A special use permit is required for permission to operate a landfill, waste collection center, recovered materials processing facility, or recycling center.
(1) Application procedure. An application for a special use permit must be submitted by the owner of the subject property, or the authorized agent of the owner, as shown by notarized affidavit. The applicant must submit a fee as indicated below with the application. An application form shall be provided by the county. The applicant is required to submit the following information with the application:
a. A site plan showing the subject property, containing (a) a survey of the boundaries of the subject property, (b) all lots within 500 feet of the subject property, and (c) the names of the owners of all such properties, as indicated by county tax records on the date of the application.
b. A landscaping and buffer plan, showing roads, grading, buffers, fences, plantings, screenings, and similar features.
c. An erosion and sedimentation control plan showing how storm water drainage will be handled during all phases of construction, operation, and remediation.
d. A site plan showing the proximity to all residential homes and uses, commercial structures and uses, industrial structures and uses, roads, airports, and railroads, within 1,000 feet of the subject property.
e. Topographic map of the site, showing elevations on a two-foot contour, and showing all wetlands and flood plains, streams, lakes and water features, and groundwater recharge areas.
f. A site plan indicating expected noise levels at the perimeter of the property and at 100-foot intervals around the boundaries of the property, out to a distance of 500 feet.
g. A description of hours and method of operation, a lighting plan, and a dust and debris mitigation plan to keep the streets and area clean.
h. For a landfill, the following information is required:
1. A remediation plan, showing the plans for restoring the site after closure of each landfill cell.
2. A hydrological survey, showing the depth of the water table throughout the site at 100-foot intervals, showing the location of all public and private wells within one-half mile of the boundaries of the site, and showing the seasonal flow directions of the groundwater.
3. Elevation renderings, showing lines of site and maximum landfill cell elevation.
4. Certification that all state and federal agencies and departments that regulate landfills through statutes, regulations or advisories have been timely notified of the application and intent to construct a landfill.
(2) Notice procedures.
a. Once a completed application is submitted to the county, the clerk of the board of commissioners shall forward the same to the board. The applicant shall be required to send a letter via first class mail to all adjoining property owners, as shown on the tax records of the county on the date of the application, and to all property owners where any portion of their property is within 1,000 feet of the boundary of the landfill. The notice shall be required to state that the applicant is seeking a special use permit for the requested use, and shall state the date of the two board of commissioners hearings on the application. Certification of this notice must be provided to the board, along with a list of all owners, prior to the first hearing.
b. The applicant shall also be required to pay for notice to be published at least twice in the county's legal organ prior to each hearing. Notice shall be published beginning at least seven but not more than 45 days prior to the date of each hearing. The notice shall state the time, place, and purpose of the hearing. Copies of all ads or a certification from the publisher must be submitted to the board prior to each hearing.
c. The applicant shall also pay for and post signs on the subject property along the road frontage, which shall be placed in conspicuous locations on the property.
Signs shall be erected at least 15 days prior to the first public hearing and must remain until a written decision is issued. One sign is required for each 300 feet (or fraction thereof) of road frontage (i.e. under 300-1, 301 to 600-2, etc.). Each sign must be a minimum of ten square feet in size, and labeled "Special Use Permit Notice" with letters a minimum of four inches high. All other letters must be a minimum of two inches high, and the bottom of the sign itself must be a minimum of three feet off the ground and not obscured from view. Each sign must state that a special use permit has been sought, the dates, times and places of the two hearings, and the use requested. The applicant must provide pictures of the signs in place to the board prior to the first hearing.
(3) Hearing procedures.
a. The board shall hold two hearings on the application. At the first hearing, the applicant shall present its application, but public comments will not be received.
The board will have the opportunity to ask questions of the applicant, and board members shall request any further information desired by the board from the applicant. The board may also request independent experts be retained by the applicant, or by the county, to verify the applicant's information or develop new and additional information. The first hearing shall take place within 45 days of a completed application being submitted. The second hearing shall take place at the next regularly scheduled board meeting following publication of the second required notice, unless additional time is granted by the board, in which case it shall take place within 60 days of the first hearing.
If the board requests that an independent expert be retained on behalf of the county, the applicant shall be required to pay to the expert's estimated expenses prior to said expert being retained. The board shall hold said funds in escrow until payment is required and refund any unused funds to the applicant. The board shall issue no decision on an application request until the applicant has paid all expenses incurred under this section.
b. At the second public hearing on a special use permit application, the applicant shall again present its application, and any supplemental information requested by the board. The board members shall have the opportunity to ask questions of the staff, any experts, the applicant, supporters and opponents. The hearing shall be transcribed or recorded so that it may be transcribed later if necessary. The applicant and supporters shall be granted equal time as opponents. The minimum time allowed per side is 15 minutes. More time than the minimum may be allowed by the board or the chairman if the application is complex, or the number of witnesses warrants a further extension. If the chairman determines that there are a great number of opponents with the same interest (for example, members of the same neighborhood), the chairman may require that a spokesman be designated. The opponents may also be represented by an attorney. The appliSOLID WASTE § 54-67 cant, supporters and opponents shall have the right to provide testimony, including expert testimony, in support of their position. Each party shall have a reasonable opportunity to ask questions of the other side, in an orderly manner as controlled by the chairman.
c. The board shall only consider evidence presented with the application or at the hearing. The board members shall not accept any ex parte evidence, and all evidence submitted shall be disclosed at or before the public hearing, to allow all sides the opportunity to review it.
(4) Decision process.
a. At the close of the evidence at the public hearing, the board shall discuss the application. No vote shall be taken at this time. At the close of discussion, the board shall recess the hearing to allow the county attorney's office time to prepare proposed written decision(s). The county attorney's office shall meet with each board member individually and ascertain his or her reasons for approval or denial, and shall prepare a written decision or decisions to be voted on by the board at a hearing within 45 days. Board members may also prepare their own proposed decisions.
b. Written decisions should be based on the evidence in the record and the criteria in the ordinance.
c. At the hearing, the chairman shall call for motions and any member may put forward a written decision to be voted on. Written decisions may be supplemented with further conditions proposed at that hearing. No vote shall be final until a written decision is adopted by the board.
d. Any proposal shall be specifically conditioned to the site plan, plat maps, elevation renderings, and other detailed plans to insure that the development is erected in accordance with the presented materials. The approval may also impose additional conditions, if the conditions are designed to minimize the impact of the use on the neighboring property, streets and so forth.
(5) Criteria for grant of special use permit. In considering whether to grant or deny a special use permit, the board shall consider the following criteria:
a. Whether the proposed use will have a negative impact in regard to traffic on adjacent streets and in regard to adjacent residential, commercial and industrial uses.
b. Whether there is sufficient and safe parking facilities, access and egress provided.
c. Whether the proposed use is compatible with the surrounding properties, uses, and governmentally regulated facilities.
d. Whether the proposed use will have a negative impact on health, safety, aesthetics, property value, or other elements of the community.
e. Whether the proposed use is compatible with the county's comprehensive plan and solid waste management plan.
f. Whether there are any environmentally sensitive areas on the subject property (including wetlands, streams, flood plains, etc). If there are such areas, whether the proposed plans adequately protect those areas.
g. Whether the signage and outdoor lighting is consistent with the surrounding uses.
h. Whether there is sufficient protective screening, either natural, topographic, or proposed, to screen the use from public view.
i. Whether the property can be viably used for other purposes.
j. Whether the hours of operation of the proposed use are consistent with surrounding uses.
k. Whether noise, dust, debris or other external impacts of the use would negatively impact the surrounding uses.
(6) Development requirements. The development requirements that apply to landfills, waste collection centers, recycling centers and recovered material processing facilities are as follows:
a. Landfills. Minimum property area for landfills is 200 acres. The minimum undisturbed buffer around the entire perimeter of the property shall be 200 feet.
If the undisturbed buffer does not contain sufficient density of hardwood and evergreen trees to screen the landfill from view at all times of the year, the applicant shall be required to improve the buffer with a minimum of [a] ten-foot earthen berm topped with [an] eight-foot opaque wooden fence, and to plant a 25-foot buffer of pine and hardwoods outside that berm, at a density approved by the county. Additionally buffering requirements may be imposed as circumstances warrant. Additionally, an undisturbed buffer of 50 feet must be maintained around all lakes, streams, and wetlands on the property. No portion of the non-buffer area of the site (as measured from the inner boundary of the buffer at the nearest point) shall be closer than 1,000 feet to any residentially used lot. A security fence must be erected around the landfill operations area. No more than 40 percent of the total property area may be disturbed as landfill cell area, with the remainder preserved as open space. No landfill cell is permitted within 200 feet of any lake, stream, or wetland buffer, not within 100 feet of any area within the 100-year flood plain. No landfill cell may exceed 65 feet in height above the original grade. Any scenic barrier, security fence, and/or earthen burn required by this section must be continually maintained in good repair and good condition by the permittee.
b. Waste collection centers. Minimum property area for waste collection center is 50 acres. The minimum undisturbed buffer around the entire perimeter of the property shall be 150 feet. If the undisturbed buffer does not contain sufficient density of hardwood and evergreen trees to screen the waste collection center at all times of the year, the applicant shall be required to improve the buffer with a minimum of [a] ten-foot landscaped earthen berm topped with a six-foot opaque wooden fence. Additional buffering requirements may be imposed as circumstances warrant. Additionally, an undisturbed buffer of fifty feet must be maintained around all lakes, streams, and wetlands of the property. No portion of the non-buffer area of the site (as measured from the inner boundary of the buffer at the nearest point) shall be closer than 1,000 feet to any residentially used lot.
A security fence must be erected around the landfill operations area, inside the buffer. No waste may be kept on a waste collection center property for more than three weeks before being transferred to a landfill.
c. Recovered materials processing center. Minimum property area for recovered materials processing center is 20 acres. The minimum undisturbed buffer around the entire perimeter of the property shall be 100 feet. If the undisturbed buffer does not contain sufficient density of hardwood and evergreen trees to screen the landfill at all times of the year, the applicant shall be required to improve the buffer with a minimum of [a] six-foot landscaped earthen berm topped with a six-foot opaque wooden fence. Additional buffering requirements may be imposed as circumstances warrant. Additionally, an undisturbed buffer of 25 feet must be maintained around all lakes, streams, and wetlands on the property. No portion of the non-buffer area of the site (as measured from the inner boundary of the buffer at the nearest point) shall be closer than 1,000 feet to any residentially used lot.
d. Recycling centers. Minimum property area for recycling centers is 20 acres. The minimum undisturbed buffer around the entire perimeter of the property shall be 100 feet. If the undisturbed buffer does not contain sufficient density of hardwood and evergreen trees to screen the landfill at all times of the year, the applicant shall be required to improve the buffer with a minimum of [a] six-foot landscaped earthen berm topped with a six-foot opaque wooden fence. Additional buffering requirements may be imposed as circumstances warrant. Additionally, an undisturbed buffer of 25 feet must be maintained around all lakes, streams, and wetlands on the property. No portion of the non-buffer area of the site (as measured from the inner boundary of the buffer at the nearest point) shall be closer than 1,000 feet to any residentially used lot. No recovered materials may be kept on recycling center property for more than three weeks before being transferred to a recovered materials processing facility. Waste that is not recyclable may not be accepted by nor stored at a recycling center.
(7) Appeal procedures. In the event a special use permit application is denied, the applicant shall have the right to appeal to the superior court of the county within 30 days. The applicant shall file a copy of the appeal with the clerk of the board of commissioners, and the clerk shall forward a copy of the entire record (including all evidence submitted by all sides) to the superior court as soon as is practicable, along with the minutes of the hearings, copies of the tapes or transcriptions of the hearings, the written decision, a copy of the ordinance, and all other relevant ordinances, maps and documents.
(8) General restrictions. The following restrictions apply to all landfills, waste collection centers, recycling centers and recovered material processing facilities.
a. No facility shall be open, accept any waste or other materials, or be in operation earlier than 7:00 a.m. nor later than 7:00 p.m. Monday through Friday, and 8:00 a.m. through 3:00 p.m. Saturday. No operations are allowed on Sunday.
b. Lighting for any facility shall be downward firing and shielded to minimize light pollution. Illumination from any facility shall not cast light on adjoining property or shine in such a manner as to cause traffic interference.
c. Vehicles leaving the site of any facility shall be sufficiently clean not to deposit dirt, debris, or waste into the road or right-of-way.
d. Ingress and egress shall be as designated by the county, and acceleration and deceleration lanes shall be provided for traffic entering and leaving any facility.
e. No landfills, waste collection centers, recycling centers or recovered material processing facilities shall be established in violation of any state or federal statute, regulation or advisory, or without certification of compliance with all applicable statutes, regulations and advisories.
(9) Fees. The fees for submission of a special use permit application and for each annual renewal in addition to paying the cost of newspaper advertising, are as follows:
Each special use permit governed by this article must be renewed on an annual basis by filing an application to renew with the county board of commissioners at least 90 days prior to the permit's expiration date and pay in the fees enumerated above in addition to the costs of advertising the renewal application in the legal organ of the county.
Historia
(Ord. of 8-16-2004, § VI)