Ir al contenido
Georgia Commons
Menú

Forsyth County · Código de ordenanzas

Forsyth County Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2025-09-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 9 de 10. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

(f) For industrial users for which EPA or the authorized state, tribe, or territory is the control authority, as of December 21, 2020 all reports submitted in compliance with 40 CFR § 403.12 must be submitted electronically by the industrial user to the control authority or initial recipient, as defined in 40 CFR 127.2(b), in compliance with this section and 40 CFR Part 3 (including, in all cases, subpart D to part 3), 40 CFR 122.22, and 40 CFR Part 127.

Part 127 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of Part 127, the industrial users for which EPA or the authorized state, tribe, or territory is the control authority may be required to report electronically if specified by a particular control mechanism or if required to do so by state law. (40 CFR 403.12(e)(1))

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-85. Reports of changed conditions.

Each user must notify the director of any significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least ten days before the change.

(a) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of an individual wastewater discharge permit or general permit application under section 82-70 of this article.

(b) The director may reissue an individual wastewater discharge permit or general permit under section 82-79 of this article or modify an existing individual wastewater discharge permit or general permit under section 82-76 of this article in response to changed conditions or anticipated changed conditions.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-86. Reports of potential problems.

(a) In the case of any discharge, including but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, a slug discharge or slug load that might cause potential problems for the POTW, the user shall immediately telephone and notify the director of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.

(b) Within five days following such discharge, the user shall, unless waived by the director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article.

(c) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in paragraph (a), above. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure.

(d) Significant industrial users are required to notify the director immediately of any changes at its facility affecting the potential for a slug discharge.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-87. Reports from unpermitted users.

All users not required to obtain an individual wastewater discharge permit or general permit shall provide appropriate reports to the director as the director may require.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-88. Notice of violation/repeat sampling and reporting.

If sampling performed by a user indicates a violation, the user must notify the director within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 days after becoming aware of the violation. Resampling by the industrial user is not required if Forsyth County performs sampling at the user's facility at least once a month, or if Forsyth County performs sampling at the user between the time when the initial sampling was conducted and the time when the user or Forsyth County receives the results of this sampling, or if Forsyth County has performed the sampling and analysis in lieu of the industrial user. If Forsyth County performed the sampling and analysis in lieu of the industrial user, Forsyth County will perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat sampling and analysis (See 40 CFR 403.12(g)(2)).

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-89. Notification of the discharge of hazardous waste.

(a) Any user who commences the discharge of hazardous waste shall notify the POTW, the EPA regional waste management division director, and state hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: An identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this paragraph need be submitted only once for each hazardous waste discharged.

However, notifications of changed conditions must be submitted under section 82-85 of this article. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of sections 82-81, 82-83, and 82-84 of this article.

(b) Dischargers are exempt from the requirements of paragraph (a), above, during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification.

(c) In the case of any new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the director, the EPA regional waste management waste division director, and state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations.

(d) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.

(e) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued thereunder, or any applicable federal or state law.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-90. Analytical requirements.

All pollutant analyses, including sampling techniques, to be submitted as part of an individual wastewater discharge permit or general permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard.

If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the director or other parties approved by

EPA.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-91. Sample collection.

Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. The county establishes the frequency of monitoring necessary to assess and assure compliance by the user with applicable pretreatment standards and related requirements in the user's individual wastewater discharge permit or general permit.

(a) Except as indicated in subsection (b) and (c) below, the user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the director.

Where time-proportional composite sampling or grab sampling is authorized by Forsyth County, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory.

Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by Forsyth County, as appropriate. In addition, grab samples may be required to characterize batch discharges or slug discharges or to show compliance with instantaneous limits.

(b) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, closed-cup flash point and volatile organic compounds must be obtained using grab collection techniques.

(c) For sampling required in support of baseline monitoring and 90-day compliance reports required in section 82-81 and 82-83 (See 40 CFR 403.12(b) and (d)), a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the director may authorize a lower minimum. For the reports required by section 82-84 (40 CFR 403.12(e) and 403.12(h)), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and related requirements.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-92. Date of receipt of reports.

Written reports will be deemed to have been submitted on the date postmarked. For reports that are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-93. Recordkeeping.

Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article, and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or Forsyth County, or where the user has been specifically notified of a longer retention period by the director.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-94. Certification statements.

40 CFR 403.12 (1) requires that the certification that follows be provided for industrial user baseline monitoring reports (BMRs) (403.12(b)), industrial user reports on compliance with categorical pretreatment standards deadline (90-day compliance report) (403.12(d)), categorical industrial user periodic reports on continued compliance (403.12(e)) and the initial request from categorical industrial users to forego monitoring for pollutants not present.

(a) Certification of permit applications, user reports and initial monitoring waiver. The following certification statement is required to be signed and submitted by users submitting permit applications in accordance with section 82-71; users submitting baseline monitoring reports under section 82-81(b)(5) (See 40 CFR 403.12(1)); users submitting reports on compliance with the categorical pretreatment standard deadlines under section 82-83 (See 40 CFR 403.12(d)); users submitting periodic compliance reports required by section 82-84(a), (b) (See 40 CFR 403.12(e) and (h)), and users submitting an initial request to forego sampling of a pollutant on the basis of section 82-84(b)(4) (See 40 CFR 403.12(e)(2)(iii)). The following certification statement must be signed by an authorized representative as defined in division 2:

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

(b) Certification of pollutants not present. Users that have an approved monitoring waiver based on section 82-84(b) must certify on each report with the following statement that there has been no increase in the pollutant in its wastestream due to activities of the user (See 40 CFR 403.12(e)(2)(v). The following certification statement must be signed by an authorized representative as defined in division 2:

Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of [list pollutant(s)] in the Wastewaters due to the activities at the facility since filing of the last periodic report under Forsyth County Code of Ordinances, Section 82-84(a).

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 9. POWERS AND AUTHORITY OF INSPECTORS

Sec. 82-95. Right-of-entry.

Duly authorized employees or agents of Forsyth County bearing proper credentials and identification shall have a right-of-entry on, and shall be permitted to enter the properties of users, industrial users, and significant industrial users, and in accord with all pertinent constitutional safeguards regarding entry into private residences, for the purposes of inspection, observation, measurement, independent sampling, testing, record review, and copying pertinent to discharge to the sewage works in accordance with the provisions of this article.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-96. Safety rules.

While performing the necessary work on private properties referred to herein, the authorized employees or agents of Forsyth County shall observe all safety rules applicable to the premises reasonably established by the owner or operator (as applicable) of such premises.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-97. Easements.

Duly authorized employees or agents of Forsyth County bearing proper credentials and identification shall be permitted to enter all private properties through which Forsyth County holds an easement for the purposes of but not limited to, inspection, observation, measurement, sampling, repair, and maintenance of any portion of the wastewater facilities lying within said easement. All entry and subsequent work, if any, on said easement, shall be done in accordance with the terms of the duly negotiated easement pertaining to the private property involved.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 10. COMPLIANCE MONITORING

Sec. 82-98. Inspection, monitoring, and entry.

The director shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this article and any individual wastewater discharge permit, general permit, or order issued hereunder. The director shall perform at least one unannounced inspection and sampling each calendar year. Where the director has determined that an industrial user meets the criteria for classification as a non-significant categorical industrial user, the director must evaluate, at least once per year, whether an industrial user continues to meet the criteria in § 403.3(v)(2). (40 CFR 403.8(f)(2)(B)) Users shall allow the director ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.

(a) Where a user or person has security measures in force which require proper identification and clearance before entry into its premises, such user or person shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the director and all other duly authorized county personnel, employees, or agents will be permitted to enter without delay for the purposes of performing specific responsibilities.

(b) All significant industrial users shall install a suitable control manhole or other suitable structure together with such necessary meters and other appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastes. Such structures shall be accessibly and safely located and shall be constructed in accordance with plans approved prior to construction by the director.

The structure shall be installed by the owner at the owner's expense and shall be maintained by the owner so as to be safe and accessible at all times. Plans and/or drawings of this structure shall be approved by the director. The requirement for this structure may be waived if it is deemed by the director to be unnecessary.

(c) The director shall have the right to install on the user's property, or require installation of, such devices as are necessary to conduct sampling, metering, and/or observation of the user's operations. It shall be a violation of this article for any person or industrial user to tamper with, remove, adjust, disconnect, or otherwise interfere with the operation of these devices.

(d) The director may require the user to install monitoring equipment as necessary to conduct sampling, metering, and/or observation of the user's operations. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated at a frequency deemed necessary by the director, to ensure accuracy. Records of this calibration must be submitted to the director upon request.

(e) Any temporary or permanent obstruction that prevents safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the request of the director and shall not be replaced. The costs of making the facility accessible to the director shall be borne by the user.

(f) Unreasonable delays in allowing the director access to the premises of any user or person shall be a violation of this article.

(g) The location of the monitoring facility shall provide ample room in or near the monitoring facility to allow accurate sampling and preparation of samples and analysis and be maintained in such manner so as to enable the director to perform independent monitoring activities.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-99. Search warrants.

Nothing in this article shall prohibit the director from seeking the issuance of a search warrant from the courts of Forsyth County. The director may seek issuance of a search warrant to accomplish, without limitation, any inspection, sampling, testing, monitoring, investigation or enforcement that, in the opinion of the director, appears necessary in order for the POTW to achieve or maintain compliance with applicable state or federal standards, or in order for the director to promote the purposes and policies of this article.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 11. CONFIDENTIAL INFORMATION

Sec. 82-100. General.

Except as otherwise provided herein, information and data on a user obtained from reports, surveys, individual wastewater discharge permit applications, general permit applications, individual wastewater discharge permits, general permits, monitoring programs, and from the director's inspection and sampling activities, shall be available to the public without restriction unless the user specifically requests, and is able to demonstrate to the satisfaction of the director, that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets under applicable state law. Any such request must be asserted at the time of submission of the information or data. Notwithstanding the foregoing, nothing in this article shall be construed as an extension or limitation of the county's duty to comply with, or the right to disclose or not to disclose records pursuant to, the Georgia Open Records Act, O.C.G.A. § 50-18-70 et seq.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-101. Portions of report remain confidential.

When requested and demonstrated by the furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon request to governmental agencies for uses related to the NPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-102. Wastewater constituents and characteristics available to public.

Wastewater constituents and characteristics and other effluent data as defined by 40 CFR 403.14(b) will not be recognized as confidential information and except as otherwise set forth in this article, will be available to the public without restriction.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-103. Other information shall be available to the public.

Except as otherwise set forth in this article, all other information which is submitted to the state or POTW shall be available to the public at least to the extent provided by 40 CFR 2.302.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 12. MALICIOUS DAMAGE

Sec. 82-104. Damage to sewage works.

No person shall maliciously, willfully, or negligently break, damage, destroy, uncover, deface, or tamper with any structure, appurtenance, or equipment which is a part of the sewage works. Any person violating this provision shall be subject to immediate arrest under charge of disorderly conduct.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 13. PUBLICATION OF USERS IN SIGNIFICANT NONCOMPLIANCE

Sec. 82-105. General.

The director shall publish annually in the largest daily newspaper published in the municipality where the POTW is located, a list of the users which, during the previous 12 months, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall have the meaning set forth in division 2 of this article. A copy of this notice will also be included in the annual pretreatment program summary which is required by the Environmental Protection Division of the Georgia Department of Natural Resources. If no significant violation has occurred, no publication will be required. The director shall be authorized to charge the cost of such publication to the entities listed, dividing the cost equally among the listed entities.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 14. ADMINISTRATIVE ENFORCEMENT REMEDIES

Sec. 82-106. Notification of violation.

When the director finds that any user or person has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may serve upon such user or person a written notice of violation. Within seven days of the receipt of this notice, such user or person shall submit to the director (i) an explanation of the violation; (ii) a plan for satisfactory corrective action with regard to such violation; and (iii) a plan for prevention of recurrence of such violation. Submission of this plan in no way relieves such user or person of liability for any violations occurring before or after receipt of the notice of violation. Nothing in the section shall limit the authority of the director to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-107. Consent orders.

The director is hereby authorized to enter into consent agreements, consent orders, assurances of voluntary compliance, or other similar documents establishing an agreement with any user or person responsible for noncompliance. Such documents will include specific action to be taken by the user or person to correct the noncompliance with a time period specified by the document. Such documents shall have the force and effect as the administrative orders issued pursuant to sections 82-109 and 82-110 of this article and shall be enforceable in a court of law.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-108. Show cause hearing.

The director may order any user or person which has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, to appear before the director and show cause why the proposed enforcement action should not be taken. Notice shall be served on such user or person specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that such user or person show cause why the proposed enforcement should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least 30 days prior to the hearing. Such notice may be served on any authorized representative of such user or person. A show cause hearing shall not be a bar against, or prerequisite for, taking other action against such user or person.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-109. Compliance orders.

When the director determines that any user or person has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may issue an order to such user or person responsible for the discharge directing that such user or person come into compliance within a specified time. If such user or person does not come into compliance within the time provided, the director may discontinue sewer service.

Compliance orders also may contain other requirements to address noncompliance, including additional self-monitoring and management practices designed to minimize the amount of pollutants discharged to the sewer. A compliance order may not extend the deadline for compliance established for a pretreatment standard or requirement, nor does a compliance order relieve any user or person of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, the director taking any other action against such user or person.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110. Cease and desist order.

(a) When the director determines that any user or person has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, or that the past violations of such user or person are likely to recur, the director may issue an order to such user or person directing it to cease and desist all such violations and to:

(1) Immediately comply with all applicable requirements; and

(2) Take such appropriate corrective, remedial or preventive action as may be needed to properly address any violation (including without limitation, any continuing or threatened violation), including halting operations and/or terminating the discharge.

(b) Issuance of a cease and desist order shall not be a bar against, or prerequisite for taking any other action against such user or person.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.1. Administrative fines.

(a) When the county finds that any user or person has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, the county may fine such user or person in an amount no less than $250.00 but not to exceed $1,000.00, per violation, and in the case of an industrial user, $1,000.00, per violation, per day. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation.

(b) Unpaid charges, fines, and penalties shall, after 15 days be assessed an additional penalty of 12 percent of the unpaid balance, and interest shall accrue thereafter at a rate of the greater of two percent per month or the rate specified for interest on investments of the EPA Hazardous Substance Superfund established by 26 U.S.C. § 9507 (and set forth at:

http://www.epa.gov/ocfo/finstatement/superfund/int_rate.htm). A lien against the property of such user or person will be sought for unpaid charges, fines, and penalties.

(c) The director may add the costs of preparing administrative enforcement actions, such as notices and orders, to the fine.

(d) To the extent permitted by state statute, issuance of an administrative fine shall not be a bar against or a prerequisite for taking any other action against such user or person.

(e) To the extent violators are not industrial users as contemplated by O.C.G.A.

§ 36-1-20(b), administrative penalty fines shall be limited to $1,000.00 per violation.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.2. Emergency suspensions.

(a) The director may immediately suspend the discharge of any user or person, after informal notice to such user or person, whenever such suspension appears necessary, in the opinion of the director, to abate an actual or threatened discharge, which reasonably appears to present, cause, or contribute to an imminent or substantial endangerment to human health and safety or the environment. The director may also immediately suspend a user's discharge, after notice and opportunity to respond, that threatens to interfere with the operation of the POTW, or which presents, or may present, an endangerment to the environment.

(1) Any user or person notified of a suspension of its discharge shall immediately stop or eliminate its contribution. In the event of a failure by such user or person to immediately comply with the suspension order, the director may take such steps as deemed necessary, including immediate severance of the sewer connection, to prevent or minimize harm or threatened harm or endangerment to the POTW, its receiving stream, or to human health and safety or the environment. The county may allow such user or person to recommence its discharge when such user or person has demonstrated to the satisfaction of the director that the period of endangerment has passed, unless the termination proceedings in section 82-110.3 are initiated against such user or person.

(2) Any user or person responsible, in whole or in part, for any discharge presenting imminent endangerment shall submit a detailed written statement, describing the causes of the harmful contribution and the measures taken to prevent any future occurrences, to the director prior to the date of any show cause or termination hearing under sections 82-108 and 82-110.3 of this article.

Nothing in this section shall be interpreted as requiring a hearing prior to any emergency suspension under this section.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.3. Termination of discharge and/or potable water supply.

Any user or person who violates any of the following conditions is subject to termination of discharge and/or potable water supply:

(1) Violation of an individual wastewater discharge permit or general permit conditions;

(2) Failure to accurately report the wastewater constituents and characteristics of its discharge;

(3) Failure to report significant changes in operations or wastewater volume, constituents, and characteristics prior to discharge;

(4) Refusal of reasonable access to the premises of such user or person for lawful purposes, including without limitation, inspection, monitoring, or sampling;

(5) Violation of the pretreatment standards in division 5 of this article;

(6) Discharges wastewater at an uncontrolled, variable rate in sufficient quantity to cause an imbalance in the wastewater treatment process;

(7) Fails to pay monthly bills for sanitary sewer service when due;

(8) Repeats a discharge of prohibited wastes into public sewers;

(9) Acids or chemicals damaging to sewer lines or treatment process are released into the public sewer causing rapid deterioration of these structures or interfering with proper conveyance and treatment of wastewater; or

(10) A governmental agency informs Forsyth County that the effluent from the county's wastewater treatment plant is no longer of a quality permitted for discharge into a watercourse, and it is found that the customer, user or person is discharging such wastewater effluent into the public sewer in a manner that cannot be sufficiently treated or requires treatment that is not provided by Forsyth County as normal domestic treatment.

Such user or person will be notified of the proposed termination of its discharge and/or potable water supply and be offered an opportunity to show cause under section 82-108 of this article why the proposed action should not be taken. Exercise of this option by the director shall not be a bar to, or prerequisite for, taking any other action against such user or person.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.4. Recovery of costs incurred.

In addition to civil and criminal liability, any user or person violating any permit provision or any provision of the Forsyth County Sewer Use Ordinance, or causing damage to or otherwise inhibiting the county's wastewater disposal system, shall be liable to the county for any expense, loss, or damage caused by such violation or discharge. Forsyth County shall bill such user or person for the costs incurred by the county for any cleaning, repair, or replacement work caused by the violation or discharge. Refusal to pay the assessed cost shall constitute a separate violation of section 82-110.1(b) of this article. All costs of any additional or supplemental sampling or analyses required as a result of any excessive pollutant loadings (such as BOD5, suspended solids, floating oil and grease, heavy metals, or priority pollutants) of any user or person, as determined by the director, or otherwise resulting from any suspected or actual permit violation of any user or person shall be paid for by such user or person.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.5. Appeal of certain actions of the director.

(a) Any user or person aggrieved by any order or action of the director made pursuant to sections 82-109 through 82-110.3 of this article, may appeal the decision by filing a written notice of appeal with the director within seven days of the issuance of such decision. A notice of appeal shall state the specific reason why the order or action of the director is alleged to be in error.

(b) If the director does not reverse his or her decision within 30 days of receiving a timely written notice of appeal, then such user or person may within seven days, appeal to the Forsyth County Board of Commissioners (the board). The hearing shall be held within the next two meetings of the board or a date mutually agreed upon in writing by the appellant and the chair of the board. The board shall then make its findings within 30 days of the appeal hearing. The appellant shall not be relieved of his obligations during the appeal process.

(c) If the appellant is dissatisfied with the board's decision, the appellant may then appeal the decision to the county superior court.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 15. JUDICIAL ENFORCEMENT REMEDIES

Sec. 82-110.6. Authority to bring action in courts of Forsyth County.

The county is authorized to bring any action in the courts of Forsyth County necessary to enforce the administrative enforcement remedies set forth in division 14. The county is further authorized to bring any action in the courts of Forsyth County necessary to obtain the judicial enforcement remedies set forth in this division 15.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.7. Injunctive relief.

When the county finds that any user or person has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may petition one or more courts of Forsyth County through the county attorney for the issuance of temporary or permanent injunction, as appropriate. Said temporary or permanent injunction shall, as appropriate, restrain the violation and/or compel the specific performance of the individual wastewater discharge permit, general permit, order, or other applicable requirement. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against any user or person. The Georgia EPD shall have authority to seek judicial relief and may also use administrative penalty authority to enforce these ordinances or any other applicable provision of law when the POTW has sought a relief which the Georgia EPD believes to be insufficient.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.8. Civil penalties and claims for restitution.

(a) Any user or person who has violated, or continues to violate, any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement shall be liable to the county for a civil penalty of no less than $250.00 but not more than $1,000.00 per violation, or in the case of an industrial user, a civil penalty of no less than $250.00 but not more than $1,000.00 per violation, per day. In the case of monthly or other long-term average discharge limit violations, penalties shall accrue for each day during the period of the violation. Notwithstanding the foregoing, civil penalties may be in addition to, but shall not be duplicative of, administrative fines assessed under section 82-110.1, and the county is authorized to bring an action for civil penalties regardless of whether such administrative fines have been assessed.

(b) To the extent otherwise consistent with law, including O.C.G.A. § 15-10-81, the county may recover reasonable attorney's fees, court costs, court recorder fees, and other expenses associated with enforcement activities, including sampling and monitoring expenses, and the cost of any actual damages incurred by the county and other expenses of litigation by appropriate suit at law against the user or person found to have violated this article or the orders, rules, regulations, and permits issued hereunder.

(c) In determining the amount of civil liability, the court shall take into account all relevant circumstances including but not limited to, the extent of harm caused by the violation, the magnitude and duration of the violation, any economic benefit gained through the violation of the user or person, corrective actions by the user or person, the compliance history of the user or person, and any other factor as justice requires.

(d) Filing a suit for civil penalties and/or restitution shall not be a bar against, or a prerequisite for, taking any other action against any user or person.

(e) All ordinance violations inside the county limits will be prosecuted in the courts of Forsyth County.

(f) To the extent violators are not industrial users as contemplated by O.C.G.A.

§ 36-1-20(b), civil penalty fines shall be limited to $1,000.00 per violation.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.9. Criminal prosecution.

(a) Any user or person who willfully or negligently violates any provision of this article, an individual wastewater discharge permit, general permit, or order issued hereunder, or any other pretreatment standard or requirement shall, upon conviction, be guilty of a misdemeanor punishable by a fine of no less than $250.00 but not more than $1,000.00 per violation per day, or imprisonment for not more than 60 days per violation per day, or both.

(b) Any user or person who willfully or negligently introduces any substance into the POTW which causes personal injury or property damage shall, upon conviction, be guilty of a misdemeanor and be subject to a penalty of no less than $250.00 but not more than $1,000.00 per violation per day, or be subject to imprisonment for not more than 60 days per violation per day, or both. This penalty shall be in addition to any other cause of action for personal injury or property damage available under any applicable federal, state or local law.

(c) Any user or person who knowingly makes any false statements, representations, or certifications in any application, record, report, plan, or other documentation filed, or required to be maintained, pursuant to this article, individual wastewater discharge permit, general permit, or order issued hereunder, or who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required under this article shall, upon conviction, be punished by a fine of no less than $250.00 but not more than $1,000.00 per violation, or imprisonment for not more than 60 days, or both.

(d) All ordinance violations inside the county limits will be prosecuted in the courts of Forsyth County.

(e) To the extent violators are not industrial users as contemplated by O.C.G.A.

§ 36-1-20(b), criminal penalty fines shall be limited to $1,000.00 per violation.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 16. SERVICE CHARGES

Sec. 82-110.10. Sewer service charge.

(a) Established. It is hereby determined to be necessary, in order to provide facilities for the protection of the public health, safety, welfare, and to comply with applicable water quality laws and regulations for the protection of the quality of the waters of the state, to fix and collect charges upon all premises or facilities served by the water pollution control facilities of the county.

(b) Determination of amounts. There is hereby charged and assessed to each property, premises or facility served by the water pollution control facilities of the county, or otherwise discharging wastewater, industrial wastes, water or liquids, either directly or indirectly into the water pollution control facilities, a sewer service charge and assessment payable as hereinafter provided, and in the amount determinable as follows:

(1) The sewer service charge shall be based upon the quantity of water used by the premises or facility therein or thereon as measured by a water meter or meters there in use, or as otherwise currently established.

(2) The sewer service charge shall consist of a charge per 1,000 gallons of water consumed, including adjustments thereto, plus the fixed costs. Rates shall be established for each customer class.

(3) Reserved.

(4) Any customer that discharges wastewater that is produced on-site, including without limitation, landfill leachate, shall meter all wastewater at the point of discharge to the sewer collection system, and the sewer service charge will be calculated from that metered flow.

(c) Reserved.

(d) Additional meters. Where it can be shown to the satisfaction of the director that a significant portion of the water used by customers, as measured by the water meter or meters does not enter the water pollution control facilities, then that portion of water shall not be used for billing of the sewer service charge. The director may require or permit the installation of additional meters or other devices as may be deemed necessary to establish that portion which does not enter the system.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.11. Industrial waste surcharges.

(a) Established. All persons discharging industrial wastes into the public sewers shall be charged and assessed a surcharge, in addition to any sewer service charges, if these wastes have a monthly average concentration greater than the following:

(1) A COD content of 500 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b).

(2) A TSS content of 200 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b).

(3) A TKN content of 25 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b).

(4) A total phosphorous concentration of 5 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b).

(5) A biochemical oxygen demand (BOD5) concentration of 250 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b). (This parameter may be used in lieu of COD as determined by the superintendent.)

(6) A fats, oils and grease (FOG) concentration of 100 mg/L as determined by laboratory analysis in accordance with procedures prescribed in subsection (b).

(7) Ammonia nitrogen concentration of 14 mg/L as determined by a laboratory analysis with procedures in accordance with procedures prescribed in subsection (b).

(8) Chloride concentration of 2,025 mg/L as determined by a laboratory analysis with procedures in accordance with procedures prescribed in subsection (b).

The amount of the surcharge, which is hereby charged and assessed against all persons discharging industrial wastewater into the public sewers, shall reflect the cost incurred by the county in handling the excess COD, TSS, TKN, phosphorous, BOD5, FOG, ammonia nitrogen and chloride. This surcharge shall include a proportionate share of charges for maintenance and operation of the water pollution control facilities including depreciation and other incidental expenses. There shall be a surcharge range (as applied to a given pollutant concentration) as set forth in section 82-58(7) of this article.

(b) Formula determining surcharge: When any or all the COD, TSS, TKN, phosphorous, BOD5, FOG, chloride, ammonia nitrogen and pH concentrations of wastewater or waste accepted for admission to the county water pollution control facilities exceed the values of these constituents set forth in subsection (a) hereof, the excess concentrations of any or all, as the case may be, shall be evaluated in terms of these values and be subject to a surcharge on the amount derived in accordance with the following formula:

Amount of surcharge = (COD1 + COD2 + COD3 + COD4 + TSS1 + TSS2 + TSS3 + TSS4 +

TKN1 + TKN2 + TKN3 + TKN4 + PHOS1 + PHOS2 + PHOS3 + PHOS4 + BOD1 + BOD2 +

BOD3 + BOD4 + FOG1 + FOG2 + FOG3 + FOG4 + CL1 + CL2 + CL3 + CL4 + AN1 + AN2 + AN3 + AN4 + pH).

Where:

COD1 = (8.34) x (Flow in MGD) x (Cost A) x (mg/L of COD above 501 mg/L and up to 900 mg/L).

COD2 = (8.34) x (Flow in MGD) x (Cost B) x (mg/L of COD above 900 mg/L and up to 1200 mg/L).

COD3 = (8.34) x (Flow in MGD) x (Cost C) x (mg/L of COD above 1,200 mg/L and up to 1500 mg/L).

COD4 = (8.34) x (Flow in MGD) x (Cost D) x (mg/L of COD above 1,500 mg/L).

TSS1 = (8.34) x (Flow in MGD) x (Cost E) x (mg/L of TSS above 201 mg/L and up to 300 mg/L).

TSS2 = (8.34) x (Flow in MGD) x (Cost F) x (mg/L of TSS above 300 mg/L and up to 400 mg/L).

TSS3 = (8.34) x (Flow in MGD) x (Cost G) x (mg/L of TSS above 400 mg/L and up to 500 mg/L).

TSS4 = (8.34) x (Flow in MGD) x (Cost H) x (mg/L of TSS above 500 mg/L).

TKN1 = (8.34) x (Flow in MGD) x (Cost I) x (mg/L of TKN above 26 mg/L and up to 50 mg/L).

TKN2 = (8.34) x (Flow in MGD) x (Cost J) x (mg/L of TKN above 50 mg/L and up to 75 mg/L).

TKN3 = (8.34) x (Flow in MGD) x (Cost K) x (mg/L of TKN above 75 mg/L and up to 100 mg/L).

TKN4 = (8.34) x (Flow in MGD) x (Cost L) x (mg/L of TKN above 100 mg/L).

PHOS1 = (8.34) x (Flow in MGD) x (Cost M) x (mg/L of PHOS above 7 mg/L and up to 15 mg/L).

PHOS2 = (8.34) x (Flow in MGD) x (Cost N) x (mg/L of PHOS above 15 mg/L and up to 20 mg/L).

PHOS3 = (8.34) x (Flow in MGD) x (Cost O) x (mg/L of PHOS above 20 mg/L and up to 30 mg/L).

PHOS4 = (8.34) x (Flow in MGD) x (Cost P) x (mg/L of PHOS above 30 mg/L).

BOD1 = (8.34) x (Flow in MGD) x (Cost Q) x (mg/L of BOD5 above 251 mg/L and up to 400 mg/L).

BOD2 = (8.34) x (Flow in MGD) x (Cost R) x (mg/L of BOD5 above 400 mg/L and up to 550 mg/L).

BOD3 = (8.34) x (Flow in MGD) x (Cost S) x (mg/L of BOD5 above 550 mg/L and up to 800 mg/L).

BOD4 = (8.34) x (Flow in MGD) x (Cost T) x (mg/L of BOD5 above 800 mg/L) FOG1 = (8.34) x (Flow in MGD) x (Cost U) x (mg/L of FOG above 101 mg/L and up to 125 mg/L).

FOG 2 = (8.34) x (Flow in MGD) x (Cost V) x (mg/L of FOG above 125 mg/L and up to 150 mg/L).

FOG 3 = (8.34) x (Flow in MGD) x (Cost W) x (mg/L of FOG above 150 mg/L and up to 175 mg/L).

FOG 4 = (8.34) x (Flow in MGD) x (Cost X) x (mg/L of FOG above 175 mg/L).

CL1 = (8.34) x (Flow in MGD) x (Cost Y) x (mg/L of CL above 2,026 mg/L and up to 2,050 mg/L).

CL2 = (8.34) x (Flow in MGD) x (Cost Z) x (mg/L of CL above 2,050 mg/L and up to 2,075 mg/L).

CL3 = (8.34) x (Flow in MGD) x (Cost AA) x (mg/L of CL above 2,075 mg/L and up to 2,100 mg/L).

CL4 = (8.34) x (Flow in MGD) x (Cost AB) x (mg/L of CL above 2,100 mg/L).

AN1 = (8.34) x (Flow in MGD) x (Cost AC) x (mg/L of AN above 15 mg/L and up to 22 mg/L).

AN2 = (8.34) x (Flow in MGD) x (Cost AD) x (mg/L of AN above 22 mg/L and up to 31 mg/L).

AN3 = (8.34) x (Flow in MGD) x (Cost AE) x (mg/L of AN above 31 mg/L and up to 40 mg/L).

AN4 = (8.34) x (Flow in MGD) x (Cost AF) x (mg/L of AN above 40 mg/L).

pH = Concentration beyond limit = 10(pH-9) if pH > 9, or 10(6-pH) if pH < 6 Where cost factors are as follows:

A = The annual average cost of removal of one pound of COD at a concentration between 501 and 900 mg/L.

B = The annual average cost of removal of one pound of COD at a concentration between 900 and 1,200 mg/L.

C = The annual average cost of removal of one pound of COD at a concentration between 1,200 and 1,500 mg/L.

D = The annual average cost of removal of one pound of COD at a concentration above 1,500 mg/L.

E = The annual average cost of removal of one pound of TSS at a concentration between 201 and 300 mg/L.

F = The annual average cost of removal of one pound of TSS at a concentration between 300 and 400 mg/L.

G = The annual average cost of removal of one pound of TSS at a concentration between 400 and 500 mg/L.

H = The annual average cost of removal of one pound of TSS at a concentration above 500 mg/L.

I = The annual average cost of removal of one pound of TKN at a concentration between 26 and 50 mg/L.

J = The annual average cost of removal of one pound of TKN at a concentration between 50 and 75 mg/L.

K = The annual average cost of removal of one pound of TKN at a concentration between 75 and 100 mg/L.

L = The annual average cost of removal of one pound of TKN at a concentration above 100 mg/L.

M = The annual average cost of removal of one pound of total phosphorous (P) at a concentration between 7 and 15 mg/L.

N = The annual average cost of removal of one pound of total phosphorous (P) at a concentration between 15 and 20 mg/L.

O = The annual average cost of removal of one pound of total phosphorous (P) at a concentration between 20 and 30 mg/L.

P = The annual average cost of removal of one pound of total phosphorous (P) at a concentration above 30 mg/L.

Q = The annual average cost of removal of one pound of (BOD5) at a concentration between 251 and 400 mg/L.

R = The annual average cost of removal of one pound of (BOD5) at a concentration between 400 and 550 mg/L.

S = The annual average cost of removal of one pound of (BOD5) at a concentration between 550 and 800 mg/L.

T = The annual average cost of removal of one pound of (BOD5) at a concentration above 800 mg/L.

U = The annual average cost of removal of one pound of (FOG) at a concentration between 101 and 125 mg/L.

V = The annual average cost of removal of one pound of (FOG) at a concentration between 125 and 150 mg/L.

W = The annual average cost of removal of one pound of (FOG) at a concentration between 150 and 175 mg/L.

X = The annual average cost of removal of one pound of (FOG) at a concentration above 175 mg/L.

Y = The annual average cost of removal of one pound of (CL) at a concentration between 2,026 and 2,050 mg/L.

Z = The annual average cost of removal of one pound of (CL) at a concentration between 2,050 and 2,075 mg/L.

AA = The annual average cost of removal of one pound of (CL) at a concentration between 2,075 and 2,100 mg/L.

AB = The annual average cost of removal of one pound of (CL) at a concentration above 2,100 mg/L.

AC = The annual average cost of removal of one pound of (AN) at a concentration between 15 and 22 mg/L.

AD = The annual average cost of removal of one pound of (AN) at a concentration between 22 and 31 mg/L.

AE = The annual average cost of removal of one pound of (AN) at a concentration between 31 and 40 mg/L.

AF = The annual average cost of removal of one pound of (AN) at a concentration above 40 mg/L.

pH = Concentration beyond limit x Daily Flow (gpd) x $0.0005 = Recommended Daily Fine

(c) Determination of amounts: The rates of surcharge for each of the aforementioned constituents shall be determined annually by the director in order that the above factors may correctly represent current treatment costs. A schedule of the surcharges shall be determined by the county.

(d) Changing industrial waste surcharge: The industrial waste surcharge cost factors (cost per pound of removal) shall not be increased in any year by more than 20 percent of the charges for the preceding year without written approval of the county.

(e) Schedule of fees, surcharges, and fines: A schedule of fees, surcharges, and fines for the water and wastewater department shall be available at the county administration building.

This schedule shall include but will not be limited to: Waste hauler permit fees, grease hauler permit fees, industrial user permit fees, and wastewater surcharges and fines.

Notwithstanding any other provision contained in this article, nothing shall prohibit the director from assessing administrative fines, or civil or criminal penalties, in addition to the surcharges established herein whenever, in the opinion of the director, such action appears necessary in order for the POTW to achieve or maintain compliance with applicable state or federal standards, or in order for the director to promote the purposes and policies of this article.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.12. Billing procedure.

Industrial wastes surcharges and fines provided for in this article shall be prepared and rendered to the address supplied by the director. The volume of flow used in billing the industrial waste surcharges shall be based upon metered, estimated, or prorated water consumption as shown in the records of meter reading maintained by the county.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.13. Payment of bills.

Sewer service charges and surcharges provided in this article shall be payable at the county administration building or at other authorized locations, at the same time as the water bills for a lot, parcel of land, building, premise or facility are payable. Payments for water shall not be accepted unless payment of any applicable sewer service charge or surcharge is made at the same time.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.14. Annual analysis.

(a) Frequency of analysis. The industrial wastewater of each industrial user subject to the industrial waste surcharge, and discharging into the county sewers shall be subject to periodic inspection by the director, and a determination of character and concentration of the wastewater shall be made annually by the industrial user, or more often, as may be deemed necessary by the director. The director shall perform at least one unannounced inspection and sampling each calendar year.

(b) Sampling and analysis procedures. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR, Part 136 as amended. Composite samples shall be representative of discharge due to normal operations. To determine the characteristics of a representative sample used in the calculation of an annual surcharge, a minimum, three representative composite samples shall be made. Sample results shall be averaged using a flow-weighted average to determine the overall average concentration for use in billing the industrial surcharge. Grab samples (of slug, batch, bypass, accidental or other episodic discharges) taken in accordance with 40 CFR 136 shall be taken to measure such constituents and characteristics as may be required by applicable law or as reasonably required by the director. Analysis of parameters, including but not limited to COD, TSS, TKN, total phosphorus (as P), BOD5, COD, ammonia nitrogen, chloride, pH and priority pollutants (Appendix A to 40 CFR, Part 423-126, as amended) may be performed on grab samples to characterize the discharge. Analytical results from a certified laboratory, of a properly preserved grab sample, may be used to determine surcharges, fines and enforcement actions related to, but not limited to, slug discharges or batch discharges, including analytes that are typically composite sampled. The discharger may request split samples for their own independent analysis by a certified lab.

(c) Reporting requirements. The timely submission of all notices and self-monitoring reports from industrial users as are necessary to assess and assure compliance by industrial users with pretreatment standards and related requirements, or as required in the wastewater discharge permit, including but not limited to the reports required in § 403.12 are the responsibility of the user.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019) Sec. 82-110.15. Permit fees.

The county may establish a fee for wastewater discharge permits. this fee will be collected prior to the issuance or re-issuance of a wastewater discharge permit. These fees will be used to offset the costs of implementing the county's pretreatment program. In addition, a dollar amount per 1,000 gallons of waste discharged to the county's sewer system by waste haulers (including without limitation, septic or port-a-john waste haulers) will also be assessed. This fee will be set by the county and will be used to offset the costs of treatment at the POTW.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 17. COMPLIANCE WITH REGULATORY REQUIREMENTS

Sec. 82-110.16. State and federal.

The provisions of this article shall not be deemed as alleviating compliance with applicable state and federal laws and regulations. Specific user charge and industrial cost recovery requirements, promulgated pursuant to Public Law 92-500, shall be considered as a part of this article upon official adoption. All non-domestic users are required to comply with pretreatment standards as outlined in Title 40 of the Code of Federal Regulation, Part 403, The Act and the Forsyth County Sewer Use Ordinance. Each industrial user is required to develop a compliance schedule for the installation of technology required to meet applicable pretreatment standards and related requirements.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 18. SPECIAL REQUIREMENTS FOR DENTAL PRACTICES

Sec. 82-110.17. Requirements for dental practices.

(a) Adoption of federal regulations. The county adopts and incorporates herein by reference 40 CFR Part 441—Dental Office Point Source Category as amended, which contains amalgam separation and wastewater pretreatment standards and reporting requirements for dental practices.

(b) Compliance with federal regulations required. Any facility where the practice of dentistry is performed that is subject to this article and is regulated under 40 CFR Part 441 shall comply with the following requirements:

(1) Users shall achieve compliance with applicable pretreatment standards for existing and new sources as required by 40 CFR § 441.30 and § 441.40.

(2) Users shall prepare, maintain, and submit to the director their one-time compliance reports as required by 40 CFR § 441.50.

(3) Users shall record, retain and make available for inspection by the director the information specified in 40 CFR § 441.50.

(c) Remedies. The director may enforce this section using any of the remedies permitted under this article. The director may also deem a user that is not in compliance with this section to be a significant industrial user and impose permitting and monitoring requirements applicable to SIUs.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 19. CONFLICT WITH OTHER ORDINANCES

Sec. 82-110.18. Conflict with other ordinances.

(a) All ordinances or parts of ordinances in conflict herewith are hereby repealed.

(b) The invalidity of any section, clause, sentence, or provision of this article shall not affect the validity of any other part of this article.

(c) In the event a wastewater discharge is made to a publicly owned treatment works (POTW) under the jurisdiction of an approved sewer use ordinance for another governing authority, the more restrictive requirement shall prevail. Nothing contained herein shall prevent the county from entering into any multijurisdictional agreement, memorandum of understanding, or similar arrangement that allows the county to enforce the laws, regulations, or ordinances of another governing authority or which allows another governing authority to enforce the laws, regulations, or ordinances of the county.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

DIVISION 20. DISPOSITION AND USE OF MONIES COLLECTED

Sec. 82-110.19. Forsyth County Water and Sewer Fund.

An amount equal to the amount collected by the Water and Sewer Department of Forsyth County pursuant to this article (including without limitation, monies collected from fines, penalties, surcharges, licenses or permits) shall be credited to a special fund hereby created in the county treasury to be known as the Forsyth County Water and Sewer Fund, hereinafter referred to as the fund. The monies in the fund shall be subject to annual appropriation and shall be used solely for the operation of the Water and Sewer Department of Forsyth County (including without limitation, operation and maintenance of POTW, and the director's administration of and enforcement of this article). The monies in the fund shall be invested by the county in the same manner as the monies in the general fund of the county, and all interest earned from the investment of monies in the fund shall be deposited in and remain to the credit of the fund. All unexpended and unencumbered monies remaining in the fund at the close of the fiscal year shall remain in the fund, unless otherwise directed by the Forsyth County Board of Commissioners.

(Ord. No. 114-B, § 1(Exh. A), 12-5-2019)

ARTICLE IV. WATER POLICY

Sec. 82-111. Time limit for tap-ons by individual obtaining rezoning.

Any individual or entity obtaining rezoning within the water and sewerage jurisdiction and service area of the board of commissioners, with a condition that adherence to the county water policy be required, shall tap-on to county water lines if water from the county is available and pay any fees due for such tap on within one year from the date the rezoning is approved. If water is not available from the county within one year after rezoning, such tap-on and payment of fees shall occur not later than one year after county water becomes available to the individual or entity receiving rezoning with the aforementioned condition.

(Ord. No. 58, § 1, 10-24-1988; Policy of 6-23-1986; Res. of 4-27-1987; Res. of 9-12-1988) Sec. 82-112. Dedication of lines.

Any water lines constructed by developers or other persons in accordance with the water policy concerning construction and installation of watermains and service lines adopted by the county on June 23, 1986, as amended, shall deed and/or dedicate such water lines upon completion of construction after acceptance of the quality of such lines by county officials. In addition, the developer shall warrant the quality and viability of such water lines for any and all dysfunctions for one year after dedication of such lines to the county.

(Ord. No. 58, § 2, 10-24-1988; Policy of 6-23-1986; Res. of 4-27-1987; Res. of 9-12-1988) Secs. 82-113—82-140. Reserved.

ARTICLE V. INSTALLATION OF UTILITIES

Sec. 82-141. Notice of intention to utilize right-of-way.

Any utility seeking to condemn or utilize an easement over or on a portion of the public right-of-way which is under the supervision and control of the county, in order to run wires, pipes, cables, any maintenance activity, or any other uses necessary, shall first notify the county department of engineering or its designated agent of the utility's intention to so condemn or utilize. Utilization shall mean any manner of use of the right-of-way, including, but not limited to, cutting of the pavement or boring under the pavement. Such notification shall include the location and description of the right-of-way to be condemned or utilized and the purpose of the condemnation or utilization. In the event of emergency repair service involving utilization of the paved portion of the right-of-way during hours other than normal office hours, the utility shall notify the department of engineering by the next business day.

(Ord. No. 76, § 1, 3-24-1997) Sec. 82-142. Promulgation of standards and specifications.

The county department of engineering is hereby authorized to prepare standard specifications regulating the installation of pipes, wires, poles, lines, etc., on or over a public right-of-way. These specifications shall be known as the utility accommodation standards, policies and procedures manual and are designed to protect and safeguard the welfare of the county and its citizens. A copy of the specifications shall be available for public view during normal business hours at the department of engineering.

(Ord. No. 76, § 2, 3-24-1997) Sec. 82-143. Approval of installation.

As to new installation, no utility shall install any lines, wires, pipes or poles, or otherwise utilize a public right-of-way until after obtaining prior written approval from the county department of engineering, respecting the proposed location of such utilities in accordance with these regulations. The department of engineering shall determine if the installed location and placement of any utility within, along or upon a county right-of-way meets the requirements of this article and the specifications of the county utility manual. The department of engineering shall then issue written approval or disapproval to the utility regarding the installation. Any installation made by any utility in a location other than that specified in this article or the county standards, or the approved permit, shall be removed and reinstalled in the proper location entirely at the expense of the utility. Failure to make proper corrections required by the county department of engineering will result in the withholding of any further installation permits until all corrections have been made and approved.

(Ord. No. 76, § 3, 3-24-1997) Sec. 82-144. Variances.

The county department of engineering is authorized to approve a variance from the requirements of the utility accommodation standards, policies and procedures manual, and/or county standards, if such variance absolutely necessary under the conditions then and there existing and such variance will not create a public hazard or otherwise be detrimental to the best interest of the county and its citizens.

(Ord. No. 76, § 4, 3-24-1997) Sec. 82-145. Liability for costs and expenses.

Any costs or expenses incurred by the county in repairing or replacing any structures, etc., which are not left in original condition by a utility company shall be chargeable to the utility company, including reasonable attorney's fees incurred in the collection of such costs or expenses.

(Ord. No. 76, § 5, 3-24-1997) Sec. 82-146. Utility accommodations in rights-of-way.

(a) Adopted. The 2016 Utility Accommodation Policy and Standards Manual (sometimes referred to as the "manual"), including all references contained therein to codes, rules, regulations, schedules, forms, and appendix items, except Appendix B (Permit Forms and Supporting Documents) promulgated by the State of Georgia Department of Transportation, is adopted by reference and incorporated in this article as if fully set forth herein, subject to all amendments, deletions, and modifications contained in this article. A copy of the Manual shall be maintained at the Forsyth County Engineering Department, the Forsyth County Capital Projects Department, and the Forsyth County Board of Commissioners' office and open for public inspection.

(b) Amendments. The 2016 Utility Accommodation Policy and Standards Manual promulgated by the Georgia Department of Transportation, adopted in section 82-146(a), is amended as follows:

(1) Definitions and term substitutions. The following italicized terms shall be substituted where the context requires with the non-italicized term wherever such italicized term appears in the manual:

Attorney General of Georgia/Attorney General: Forsyth County Attorney or his/her designee.

Commissioner: Forsyth County Engineering Department Director; Forsyth County Capital Projects Department Director.

Department: Forsyth County Engineering Department; Forsyth County Capital Projects Department.

Department office of financial management: Forsyth County Engineering Department Director or his/her designee; Forsyth County Capital Projects Department Director or his/her designee.

Design office head: Forsyth County Engineering Department Director or his/her designee; Forsyth County Capital Projects Department Director or his/her designee.

District construction office: Forsyth County Engineering Department; Forsyth County Capital Projects Department.

District or area engineer: Forsyth County Engineering Department; Forsyth County Capital Projects Department.

District office of environmental services: Forsyth County Engineering Department;

Forsyth County Capital Projects Department.

District utilities office: Forsyth County Engineering Department; Forsyth County Capital Projects Department.

GDOT Project Number: Forsyth County Engineering Department project number;

Forsyth County Capital Projects Department project number.

GDOT Utilities webpages: Forsyth County Engineering Department webpage;

Forsyth County Capital Projects Department webpage.

Highway: Any road that is part of the county road system.

Real property owned by department: Rights-of-way that are part of the county road system and maintained by Forsyth County.

Superior Court: Superior Court of Forsyth County.

State: Forsyth County.

State bridge and structural design engineer: Forsyth County Engineering Department Director or his/her designee; Forsyth County Capital Projects Department Director or his/her designee.

State highway (chief) engineer: Forsyth County Engineering Department Director or his/her designee; Forsyth County Capital Projects Department Director or his/her designee.

State highway system: Forsyth County Road System.

State law department: Forsyth County Attorney or his/her designee.

State utilities engineer: Forsyth County Engineering Department Director or his/her designee; Forsyth County Capital Projects Department Director or his/her designee.

State utilities office: Forsyth County Engineering Department; Forsyth County Capital Projects Department.

Statewide or department's emergency operation number: 911.

Telephone booth shall include any booth or structure, to be used by the public at large, which houses a communications link for local- or long-distance communications, including but not limited to data communication ports, terminals, kiosks, structures, or jacks for connection with local- or long-distance communications.

(2) Administration. The director of the Forsyth County Engineering Department or the director of the Forsyth County Capital Projects Department shall have the authority to administer the 2016 Utility Accommodation Policy and Standards Manual, as amended from time to time by the County, on the county road system and in accordance with any procedures the Engineering Department or the Capital Projects Department may establish thereunder.

(3) Fees. The Forsyth County Board of Commissioners shall be authorized to charge fees in accordance with the 2016 Utility Accommodations Policy and Standards Manual and any other applicable laws that exist now or may be enacted in the future. Fees shall be determined by the director of the Forsyth County Engineering Department or the director of the Forsyth County Capital Projects Department. Any fee schedule shall be posted at the Forsyth County Engineering Department offices of the director or his/her designee or at the Forsyth County Capital Projects Department offices of the director or his/her designee and open for public inspection.

(4) Deleted provisions. The following chapters and sections of the 2016 Utility Accommodation Policy and Standards Manual are deleted in their entirety:

a. Section 2.8.C;

b. Section 2.8.D;

c. Section 3.2.C;

d. Section 4.0.C and all references in the Manual to Overhead/Subsurface Utility Engineering (SUE) investigations or procedures;

e. Section 4.1.A;

f. Section 4.1.B;

g. Section 4.1.C.1;

h. Section 4.1.C.3;

i. Section 4.2.A.2. Case VII;

j. Section 4.2.A.2. Case VIII;

k. Section 5.8.A;

l. Chapter 7.

(5) Amended provisions. The following sections of the 2016 Utility Accommodation Policy and Standards Manual are amended as follows:

a. References to the Georgia Utilities Permitting System (GUPS) are amended to refer to the County's utility permit forms and Utility Coordination Manager where the context requires.

b. Section 2.5.G of the manual is amended by revising the second sentence to read as follows: "Private Lines may only cross the right-of-way with the prior consent of the Engineering Department or the Capital Projects Department and by conforming to all applicable requirements contained in this Manual."

c. Section 3.5.B Paragraph #3 of the manual is amended to read as follows: The County Attorney shall represent and defend the Indemnitees. In the event of litigation, any settlement on behalf of the Indemnitees must be expressly approved by the County Attorney. The Utility and its insurance carrier may retain, but are not obligated to retain, counsel to assist with the defense of the Indemnitees, in which case there will be mutual cooperation between the County Attorney and such counsel.

d. Section 3.5.F of the manual is amended by adding the following sentence to the end of the section: "A Utility may be required to post a bond at the discretion of the Engineering Department or the Capital Projects Department."

e. Section 4.0.A.3 of the manual is amended by deleting the reference to "GUPS Permit Form DOT 8413A" and substituting therefor "Engineering Department permit or Capital Projects Department permit."

f. Section 4.1.C.4 of the manual is amended by deleting the paragraphs titled "Escalation Process Step 2" and "Escalation Process Step 3" in their entireties, and amending the remaining portions to read as follows:

"4.1.C.4 Work Plan Approval - It is the responsibility of the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee to review all Work Plans submitted by the Utility found within a project's limits. If upon review, the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee determines a Work Plan to be unreasonable based upon the required scope of utility adjustment and/or relocation required to accommodate a project, the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee will initiate the following process to resolve such disputes involving the Work Plan whenever they may occur.

After the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee has reviewed and determined that the submitted Work Plan is unreasonable for the proposed utility work in question, the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee will notify the Utility of such opinion through written correspondence. Such written correspondence shall detail the items in question and request the Utility to justify or revise the Work Plan accordingly. The Utility will respond to this letter within 10 business days. The response shall include justification or proposed revisions to comply with the items in question identified by the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee. If the Work Plan dispute cannot be resolved through the efforts described above after 20 business days from the date provided in the Engineering Department's original written correspondence, or the Capital Improvements Department's original written correspondence, the said dispute may be escalated by the Engineering Department director or his/her designee, or by the Capital Projects Department director or his/her designee, or by the Utility to the Engineering Department director or the Capital Projects Department director, and a designated representative of the Utility who has authority to settle the dispute and who is at a higher level of management than the person with direct responsibility for the management of the project. If the parties are unable to resolve the dispute, either may select relief from such other remedies as may be available at law or in equity."

g. Section 4.2.B.1 of the manual is amended to read as follows:

"4.2.B.1 Determination of Eligibility. Whenever a claim for reimbursement is made by a Utility, a written application for such reimbursement shall be submitted by the Utility to the Engineering Department or Capital Projects Department, along with such supporting documentation for such claim as may be required at the discretion of the Engineering Department or Capital Projects Department, which information shall include, but shall not be limited to, the specific facilities for which the claim is made and the date and circumstances under which each facility was installed. The Engineering Department or Capital Projects Department reserves the right to require such additional supporting documentation where the initial documentation submitted does not provide sufficient information to permit a determination to be made. Upon review and verification of the information provided by the Utility, the Engineering Department or Capital Projects Department shall make a determination of eligibility for reimbursement."

h. Section 4.2.B.4 of the manual is amended by adding the following language to the end of the paragraph:

"For above-ground facilities, other factors may be considered by the Engineering Department or Capital Projects Department in determining the allocation and proration of costs to be reimbursed to the Utility (including, but not limited to, the overhang of utility facilities into existing rights-of-way)."

i. Section 4.2.C.5.b of the manual is amended to read as follows:

"Where existing utility facilities were installed under authority of prior utility right of way or easement rights, and such facilities are relocated or adjusted into the limits of the right of way being acquired by the County, then an agreement between the County and Utility shall be executed to outline the Utility's right to reimbursement for utility right of way or easement costs in the event the utility facilities, as relocated or adjusted into County right of way, must be later relocated or adjusted outside County right of way. Operation and maintenance of any utility facilities adjusted or relocated into County right of way will be subject to this Manual in the same manner as new utility facilities installed within County right of way."

j. Section 4.2.F.2 of the manual is deleted in its entirety and the following language inserted in lieu thereof:

"After review of such information, the Engineering Department or the Capital Projects Department will prepare the agreement and coordinate approval and execution. All agreements shall be in writing and executed by the County and the Utility."

k. Section 4.2.F.3 of the manual is amended to read as follows:

"4.2.F.3 Reviews and Approvals. Agreements will be approved and executed by the Chairman of the Board of Commissioners, or as otherwise approved by the Forsyth County Code of Ordinances. The prior concurrence of the Director of the Forsyth County Engineering Department or the Director of the Forsyth County Capital Projects Department and the County Attorney may also be required."

l. Section 4.4.B of the manual is amended by deleting the paragraphs titled "Escalation Process Step 1," "Escalation Process Step 2," and "Escalation Process Step 3" in their entireties and amending the remaining portions to read as follows:

"4.4.B Revised Work Plan Approval - If previously unforeseen utility removal, relocation, or adjustment work is found necessary by the Engineering DepartUTILITIES § 82-146 ment, the Capital Projects Department, the Utility, or the Engineering Department's or Capital Projects Department's Contractor after the letting of a project, the Utility shall provide a Revised Work Plan within 30 calendar days after becoming aware of such additional work or upon receipt of the Engineering Department's or the Capital Projects Department's written notification advising of such additional work. The incorporation of this Revised Work Plan into the overall project schedule is not intended to correct errors and omissions with the originally approved Work Plan submitted to the Engineering Department or Capital Projects Department. If such errors or omissions occur, it will be the Utility's responsibility to adhere to the original Work Plan submitted and approved during the preconstruction phase of the project's development.

However, when it is deemed appropriate for a Revised Work Plan to be submitted, the following procedure shall be followed for its approval:

It is the responsibility of the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee to review all revised Work Plans submitted by the Utility found within a project's limits. If upon review, the Engineering Department or Capital Projects Department determines a Revised Work Plan to be unreasonable based upon the required scope of utility adjustment and/or relocation required to accommodate a project, the Forsyth County Engineering Department or the Forsyth County Capital Projects Department will initiate the same process to resolve such disputes as set forth in Section 4.1.C.4."

m. Section 4.4.C of the manual is amended to read as follows:

"4.4.C. Procedures for Utility Damages or Delay Costs - If the Utility fails to provide a Work Plan or fails to complete the removal, relocation, or adjustment of its facilities in accordance with the Work Plan or Revised Work Plan approved by the Forsyth County Engineering Department or the Forsyth County Capital Projects Department, then the Utility may be liable to the County or its Contractor for delay costs and damages incurred by the County or its Contractor which grow out of the failure of the Utility to carry out and complete its work accordingly. However, the following escalation process shall be utilized by the Forsyth County Engineering Department or the Forsyth County Capital Projects Department, its Contractor, and the Utility to resolve such disputes regarding damages or delays prior to such claims being brought before a court of competent jurisdiction.

Escalation Process Step 1 - It shall be the Contractor's responsibility to coordinate and track each Utility's progress in relation to the Work Plan or Revised Work Plan previously approved by the Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee. Once the Contractor has determined that the Utility's work progress is at least 20% behind the approved Work Plan, the Contractor will notify the Utility and the Forsyth County Engineering Department or Forsyth County Capital Projects Department of such apparent delay through written correspondence. Such written correspondence shall detail the delay in question and request the Utility to submit a proposal on how the Utility plans to rectify such delay and maintain the project's schedule prescribed by the previously approved Work Plan. The Utility will respond to this letter within 10 business days. The response shall include a proposal to cure the delay identified by the Contractor. In some cases, the complexity of the project may require that a utility coordination meeting be held to address the issues identified by the Contractor. If the Utility determines that this is the case, then the Utility's response letter shall include a request to hold a utility coordination meeting with the Contractor and the Forsyth County Engineering Department or Forsyth County Capital Projects Department for utility delay resolution. If the utility delay dispute cannot be resolved through the coordination efforts described above after 20 business days from the date provided in the Contractor's original written correspondence, said dispute may be escalated for further consideration as provided in Escalation Process Step 2 below.

Escalation Process Step 2 - After the Forsyth County Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee has reviewed and determined that the submitted Work Plan is unreasonable for the proposed utility work in question, the Forsyth County Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee will notify the Utility of such determination through written correspondence. Such written correspondence shall detail the items in question and request the Utility to justify or revise the Work Plan accordingly. The Utility will respond to this letter within 10 business days. The response shall include justification or proposed revisions to comply with the items in question identified by the Forsyth County Engineering Department or the Forsyth County Capital Projects Department. If the Work Plan dispute cannot be resolved through the efforts described above after 20 business days from the date provided in the Forsyth County Engineering Department's or the Forsyth County Capital Projects Department's original written correspondence, said dispute may be escalated by the Forsyth County Engineering Department director or his/her designee or the Capital Projects Department director or his/her designee or the Utility to the Engineering Department Director or the Capital Projects Director, and a designated representative of the Utility who has authority to settle the dispute and who is at a higher level of management than the person with direct responsibility for the management of the project. If the parties are unable to resolve the dispute, either party may select relief from such other remedies as may be available at law or in equity. The Utility shall have a period of 45 days from the date of receipt of the Forsyth County Engineering Department's or the Forsyth County Capital Project Department's original written correspondence to either pay the amount of the damages or delay costs to the department or its Contractor or seek relief from this determination by available legal or equitable remedy."

n. Section 5.2.F.2.c. of the manual is amended by adding the following language to the end of the paragraph: "Milling and resurfacing may be required by the Forsyth County Engineering Department or Forsyth County Capital Projects Department."

(Ord. No. 134, § 1(Exh. A), 12-15-2022) Secs. 82-147—82-170. Reserved.

ARTICLE VI. IDENTITY THEFT PREVENTION PROGRAM

Sec. 82-171. Short title.

This article shall be known as the identity theft prevention program.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-172. Purpose.

The purpose of this article is to comply with 16 CFR § 681.2 in order to detect, prevent and mitigate identity theft by identifying and detecting identity theft red flags and by responding to such red flags in a manner that will prevent identity theft.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-173. Definitions.

For purposes of this article, the following definitions apply:

County means Forsyth County, Georgia.

Covered account means: (i) an account that a financial institution or creditor offers or maintains, primarily for personal, family, or household purposes, that involves or is designed to permit multiple payments or transactions, such as a credit card account, mortgage loan, automobile loan, margin account, cell phone account, utility account, checking account, or savings account; and (ii) any other account that the financial institution or creditor offers or maintains for which there is a reasonably foreseeable risk to customers or to the safety and soundness of the financial institution or creditor from identity theft, including financial, operational, compliance, reputation, or litigation risks.

Credit means the right granted by a creditor to a debtor to defer payment of debt or to incur debts and defer its payment or to purchase property or services and defer payment therefore.

Creditor means any person who regularly extends, renews, or continues credit; any person who regularly arranges for the extension, renewal, or continuation of credit; or any assignee of an original creditor who participates in the decision to extend, renew, or continue credit and includes utility companies and telecommunications companies.

Customer means a person who has a covered account with the county.

Identity theft means a fraud committed or attempted using identifying information of another person without authority.

Person means a natural person, a corporation, government or governmental subdivision or agency, trust, estate, partnership, cooperative, or association.

Personal identifying information means a person's credit card account information, debit card information bank account information and drivers' license information and for a natural person includes their social security number, mother's birth name, and date of birth.

Program shall mean the identity theft prevention program implemented by this article.

Red flag means a pattern, practice, or specific activity that indicates the possible existence of identity theft.

Service provider means a person that provides a service directly to the county.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-174. Findings.

(1) The county is a creditor pursuant to 16 CFR § 681.2 due to its provision or maintenance of covered accounts for which payment is made in arrears.

(2) Covered accounts offered to customers for the provision of county services are limited to water/sewer services.

(3) The county is aware of previous suspected instances of potential identity theft related to covered accounts.

(4) The processes of opening a new covered account, restoring an existing covered account, making payments on such accounts have been identified as potential processes in which identity theft could occur.

(5) The county limits access to personal identifying information to those employees responsible for or otherwise involved in opening or restoring covered accounts or accepting payment for use of covered accounts. Beginning no later than January 1, 2010, information provided to such employees will be entered directly into the county's computer system and will not be otherwise recorded.

(6) The county determines that there is a risk of identity theft occurring in the following ways:

(a) Use by an applicant of another person's personal identifying information to establish a new covered account;

(b) Use of a previous customer's personal identifying information by another person in an effort to have service restored in the previous customer's name;

(c) Use of another person's credit card, bank account, or other method of payment by a customer to pay such customer's covered account or accounts;

(d) Use by a customer desiring to restore such customer's covered account of another person's credit card, bank account, or other method of payment.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-175. Process of establishing a covered account.

(1) As a precondition to opening a covered account in the county, county personnel will take reasonable steps including but not limited to the following to obtain and verify the identity of the person opening the account:

(a) Require identifying information such as name, date of birth, residential or business address, principal place of business for a business entity, driver's license or other valid government issued photo identification.

(b) Verify the customer's identity by reviewing documentation provided.

(c) Review documentation showing the existence of a business entity.

(d) Confirm residential service addresses.

(e) Independently contact the customer.

Such information shall be entered directly into the county's computer system and shall not otherwise be recorded.

(2) Each account shall be assigned an account number and may include a personal identification number (PIN) which shall be unique to that account. The county may utilize computer software to randomly generate assigned PINs and to encrypt account numbers and PINs.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-176. Access to covered account information.

(1) Access to customer accounts shall be password protected and shall be limited to authorized county personnel.

(2) Such password(s) shall be changed by the director of commercial services on a regular basis, shall be at least eight characters in length and shall contain letters, numbers and symbols.

(3) Any unauthorized access to or other breach of customer accounts is to be reported immediately to the county manager and the password(s) changed immediately.

(4) Personal identifying information included in customer accounts is considered confidential and any request or demand for such information shall be immediately forwarded to the county manager and the county attorney.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-177. Credit card payments.

(1) In the event that credit card payments that are made over the Internet are processed through a third party service provider, such third party service provider shall certify, in writing, to the county that it has an adequate identity theft prevention program in place that is applicable to such payments.

(2) All credit card payments made over the telephone or the county's website shall be entered directly into the customer's account information in the computer database.

(3) Account statements and receipts for covered accounts shall include only the last four digits of the credit or debit card or the bank account number used for payment of the covered account.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-178. Sources and types of red flags.

All employees responsible for or involved in the process of opening a covered account, restoring a covered account or accepting payment for a covered account shall check for red flags as indicators of possible identity theft and such red flags may include:

(1) Alerts from consumer reporting agencies, fraud detection agencies or service providers. Examples of alerts include but are not limited to:

a. A fraud or active duty alert that is included with a consumer report;

b. A notice of credit freeze in response to a request for a consumer report;

c. A notice of address discrepancy provided by a consumer reporting agency;

d. Indications of a pattern of activity in a consumer report that is inconsistent with the history and usual pattern of activity of an applicant or customer, such as:

i. A recent and significant increase in the volume of inquiries;

ii. An unusual number of recently established credit relationships;

iii. A material change in the use of credit, especially with respect to recently established credit relationships; or

iv. An account that was closed for cause or identified for abuse of account privileges by a financial institution or creditor.

(2) Suspicious documents. Examples of suspicious documents include:

a. Documents provided for identification that appear to be altered or forged;

b. Identification on which the photograph or physical description is inconsistent with the appearance of the applicant or customer;

c. Identification on which the information is inconsistent with information provided by the applicant or customer;

d. Identification on which the information is inconsistent with readily accessible information that is on file with the county, such as a signature card or a recent check; or

e. An application that appears to have been altered or forged, or appears to have been destroyed and reassembled.

(3) Suspicious personal identification, such as a suspicious address change. Examples of suspicious identifying information include:

a. Personal identifying information that is inconsistent with external information sources used by the county. For example:

i. The address does not match any address in any available consumer report;

or ii. The Social Security Number (SSN) has not been issued, or is listed on the Social Security Administration's Death Master File.

b. Personal identifying information provided by the customer is not consistent with other personal identifying information provided by the customer, such as a lack of correlation between the SSN range and date of birth.

c. Personal identifying information or a phone number or address, is associated with known fraudulent applications or activities as indicated by internal or third-party sources used by the county.

d. Other information provided, such as fictitious mailing address, mail drop addresses, jail addresses, invalid phone numbers, pager numbers or answering services, is associated with fraudulent activity.

e. The SSN provided is the same as that submitted by other applicants or customers.

f. The address or telephone number provided is the same as or similar to the account number or telephone number submitted by an unusually large number of applicants or customers.

g. The applicant or customer fails to provide all required personal identifying information on an application or in response to notification that the application is incomplete.

h. Personal identifying information is not consistent with personal identifying information that is on file with the county.

i. The applicant or customer cannot provide authenticating information beyond that which generally would be available from a wallet or consumer report.

(4) Unusual use of or suspicious activity relating to a covered account. Examples of suspicious activity include:

a. Shortly following the notice of a change of address for an account, county receives a request for the addition of authorized users on the account.

b. A new revolving credit account is used in a manner commonly associated with known patterns of fraud. For example, the customer fails to make the first payment or makes an initial payment but no subsequent payments.

c. An account is used in a manner that is not consistent with established patterns of activity on the account. There is, for example:

i. Nonpayment when there is no history of late or missed payments;

ii. A material change in purchasing or spending patterns;

d. An account that has been inactive for a long period of time is used (taking into consideration the type of account, the expected pattern of usage and other relevant factors).

e. Mail sent to the customer is returned repeatedly as undeliverable although transactions continue to be conducted in connection with the customer's account.

f. The county is notified that the customer is not receiving paper account statements.

g. The county is notified of unauthorized charges or transactions in connection with a customer's account.

h. The county is notified by a customer, law enforcement or another person that it has opened a fraudulent account for a person engaged in identity theft.

(5) Notice from customers, law enforcement, victims or other reliable sources regarding possible identity theft or 'phishing' relating to covered accounts

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-179. Prevention and mitigation of identity theft.

(1) In the event that any county employee responsible for or involved in restoring an existing covered account or accepting payment for a covered account becomes aware of red flags indicating possible identity theft with respect to existing covered accounts, such employee shall immediately report such red flags to such employee's immediate supervisor.

If, in his or her discretion, such immediate supervisor deems that identity theft is unlikely or that reliable information is available to reconcile red flags, the employee shall convey this information to the director of commercial services, who may in his or her discretion determine that no further action is necessary. If the director of commercial services in his or her discretion determines that further action is necessary, a county employee shall perform one or more of the following responses, as determined to be appropriate by the director of commercial services:

(a) Contact the customer;

(b) Make the following changes to the account if, after contacting the customer, it is apparent that someone other than the customer has accessed the customer's covered account:

i. change any account numbers, passwords, security codes, or other security devices that permit access to an account; or

ii. close the account;

(c) Cease attempts to collect additional charges from the customer and decline to sell the customer's account to a debt collector in the event that the customer's account has been accessed without authorization and such access has caused additional charges to accrue;

(d) Notify a debt collector within a reasonable time, as determined by the director of commercial services, of the discovery of likely or probable identity theft relating to a customer account that has been sold to such debt collector in the event that a customer's account has been sold to a debt collector prior to the discovery of the likelihood or probability of identity theft relating to such account;

(e) Notify law enforcement, in the event that someone other than the customer has accessed the customer's account causing additional charges to accrue or accessing personal identifying information; or

(f) Take other appropriate action to prevent or mitigate identity theft.

(2) In the event that any county employee responsible for or involved in opening a new covered account becomes aware of red flags indicating possible identity theft with respect to an application for a new account, such employee shall immediately report such red flags to such employee's immediate supervisor. If, in his or her discretion, the immediate supervisor deems that identity theft is unlikely or that reliable information is available to reconcile red flags, the immediate supervisor shall convey this information to the director of commercial services, who may in his or her discretion determine that no further action is necessary. If the director of commercial services in his or her discretion determines that further action is necessary, a county employee shall perform one or more of the following responses, as determined to be appropriate by the director of commercial services:

(a) Request additional identifying information from the applicant;

(b) Deny the application for the new account;

(c) Notify law enforcement of possible identity theft; or

(d) Take other appropriate action to prevent or mitigate identity theft.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-180. Updating the program.

The board of commissioners shall annually review and, as deemed necessary by the board of commissioners, update the identity theft prevention program along with any relevant red flags in order to reflect changes in risks to customers or to the safety and soundness of the county and its covered accounts from identity theft. In so doing, the board of commissioners shall consider the following factors and exercise its discretion in amending the program:

(1) The county's experiences with identity theft;

(2) Updates in methods of identity theft;

(3) Updates in customary methods used to detect, prevent, and mitigate identity theft;

(4) Updates in the types of accounts that the county offers or maintains; and

(5) Updates in service provider arrangements.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-181. Program administration.

The director of commercial services is responsible for oversight of the program and for program implementation. The chief financial officer is responsible for reviewing reports prepared by staff regarding compliance with red flag requirements and with recommending material changes to the program, as necessary in the opinion of the chief financial officer, to address changing identity theft risks and to identify new or discontinued types of covered accounts. Any recommended material changes to the program shall be submitted to the board of commissioners for its consideration.

(1) The director of commercial services will report to the chief financial officer at least annually, on compliance with the red flag requirements. The report will address material matters related to the program and evaluate issues such as:

a. The effectiveness of the policies and procedures of the county in addressing the risk of identity theft in connection with the opening of covered accounts and with respect to existing covered accounts;

b. Service provider arrangements;

c. Significant incidents involving identity theft and management's response; and

d. Recommendations for material changes to the program.

(2) The director of commercial services is responsible for providing training to all employees responsible for or involved in opening a new covered account, restoring an existing covered account or accepting payment for a covered account with respect to the implementation and requirements of the identity theft prevention program. The director of commercial services shall exercise his or her discretion in determining the amount and substance of training necessary.

(Ord. No. 112, § 1, 4-16-2009) Sec. 82-182. Outside service providers.

In the event that the county engages a service provider to perform an activity in connection with one or more covered accounts the director of commercial services shall exercise his or her discretion in reviewing such arrangements in order to ensure, to the best of his or her ability, that the service provider's activities are conducted in accordance with policies and procedures, agreed upon by written contract, that are designed to detect any red flags that may arise in the performance of the service provider's activities and take appropriate steps to prevent or mitigate identity theft.

(Ord. No. 112, § 1, 4-16-2009) Secs. 82-183—82-190. Reserved.

ARTICLE VII. SMALL WIRELESS FACILITIES AND ANTENNAS ORDINANCE

Sec. 82-191. Purpose and compliance.

(a) O.C.G.A. § 32-4-42(6) authorizes the Forsyth County, Georgia (the county) to establish reasonable regulations for the installation, construction, maintenance, renewal, removal, and relocation of pipes, mains, conduits, cables, wires, poles, towers, traffic and other signals, and other equipment, facilities, or appliances in, on, along, over, or under the public roads of the county. Further, 47 U.S.C. § 253(c) provides that the county has authority to manage its public rights-of-way. Finally, the Georgia Streamlining Wireless Facilities and Antennas Act., O.C.G.A. title 36, chapter 66C (the SWFAA), addresses the placement of small wireless facilities in the public rights-of-way of the county.

(b) The county finds it is in the best interest of the county and its residents and businesses to establish requirements, specifications reasonable conditions regarding placement of small wireless facilities, poles in the public rights-of-way. These requirements, specifications and conditions are adopted in order to protect the public health, safety and welfare of the residents and businesses of the county and to reasonably manage and protect the public rights-of-way and its uses in the county.

(c) The objective of this article is to (i) implement the SWFAA and (ii) ensure use of the public rights-of-way is consistent with the design, appearance and other features of nearby land uses, protects the integrity of historic, cultural and scenic resources and does not harm residents' quality of life.

(Ord. No. 132, § 1(Exh. A), 9-5-2019) Sec. 82-192. Definitions.

(a) As used in this article, the following terms have the following meanings:

Antenna means: (i) communications equipment that transmits, receives, or transmits and receives electromagnetic radio frequency signals used in the provision of wireless services or other wireless communications; or (ii) communications equipment similar to equipment described in part (i) used for the transmission, reception, or transmission and reception of surface waves. Such term shall not include television broadcast antennas, antennas designed for amateur radio use, or satellite dishes for residential or household purposes.

Applicable codes means uniform building, fire, safety, electrical, plumbing, or mechanical codes adopted by a recognized national code organization to the extent such codes have been adopted by the State of Georgia or the county or are otherwise applicable in the county.

Applicant means any person that submits an application.

Application means a written request submitted by an applicant to the county for a permit to: (i) collocate a small wireless facility in a right-of-way; or (ii) install, modify, or replace a pole or decorative pole in a right-of-way on which a small wireless facility is or will be collocated.

Authority pole means a pole owned, managed, or operated by or on behalf of the county.

Such term shall not include poles, support structures, electric transmission structures, or equipment of any type owned by an electric supplier.

Collocate or collocation means to install, mount, modify, or replace a small wireless facility on or adjacent to a pole, decorative pole, or support structure.

Communications facility means the set of equipment and network components, including wires and cables and associated equipment and network components, used by a communications service provider to provide communications services.

Communications service provider means a provider of communications services.

Communications services means cable service as defined in 47 U.S.C. § 522(6); telecommunications service as defined in 47 U.S.C. § 153(53); information service as defined in 47 U.S.C. Section 153(24), as each such term existed on January 1, 2019; or wireless services.

Consolidated application means an application for the collocation of multiple small wireless facilities on existing poles or support structures or for the installation, modification, or replacement of multiple poles and the collocation of associated small wireless facilities.

Decorative pole means an authority pole that is specially designed and placed for aesthetic purposes.

Electric supplier means any electric light and power company subject to regulation by the Georgia Public Service Commission, any electric membership corporation furnishing retail service in this state, and any municipality which furnishes such service within this state.

Eligible facilities request means an eligible facilities request as set forth in 47 C.F.R.

§ 1.40001(b)(3), as it existed on January 1, 2019.

FCC means the Federal Communications Commission of the United States.

Fee means a one-time, nonrecurring charge based on time and expense.

Historic district means: (i) any district, site, building, structure, or object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the secretary of the interior of the United States in accordance with Section VI.D.1.a.i-v of the Nationwide Programmatic Agreement codified by 47 C.F.R. Part 1; (ii) any area designated as a historic district under Article 2 of Chapter 10 of Title 44, the Georgia Historic Preservation Act; or (iii) any area designated as a historic district or property by law prior to April 26, 2019.

Law means and includes any and all federal, state, or local laws, statutes, common laws, codes, rules, regulations, orders, or ordinances.

Micro wireless facility means a small wireless facility not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height that has an exterior antenna, if any, no longer than 11 inches.

Permit means a written authorization, in electronic or hard copy format, required to be issued by the county to initiate, continue, or complete the collocation of a small wireless facility or the installation, modification, or replacement of a pole or decorative pole upon which a small wireless facility is collocated.

Person means an individual, corporation, limited liability company, partnership, association, trust, or other entity or organization, including an authority.

Pole means a vertical pole such as a utility, lighting, traffic, or similar pole made of wood, concrete, metal, or other material that is lawfully located or to be located within a right-of-way, including without limitation a replacement pole and an authority pole. Such term shall not include a support structure, decorative pole, or electric transmission structure.

Rate means a recurring charge.

Reconditioning work means the activities associated with substantially painting, reconditioning, improving, or repairing authority poles.

Replace, replacement or replacing means to replace a pole or decorative pole with a new pole or a new decorative pole, similar in design, size, and scale to the existing pole or decorative pole consistent with 47 C.F.R. § 1.40001(b)(7) as it existed on January 1, 2019, in order to address limitations of, or change requirements applicable to, the existing pole to structurally support the collocation of a small wireless facility.

Replacement work means the activities associated with replacing an authority pole.

Right-of-way means, generally, property or any interest therein, whether or not in the form of a strip, which is acquired for or devoted to a public road; provided, however, that such term shall apply only to property or an interest therein that is under the ownership or control of the county and shall not include property or any interest therein acquired for or devoted to an interstate highway or the public rights, structures, sidewalks, facilities, and appurtenances of buildings for public equipment and personnel used for or engaged in administration, construction, or maintenance of public roads or research pertaining thereto or scenic easements and easements of light, air, view and access.

Small wireless facility means radio transceivers; surface wave couplers; antennas; coaxial, fiber optic, or other cabling; power supply; backup batteries; and comparable and associated equipment, regardless of technological configuration, at a fixed location or fixed locations that enable communication or surface wave communication between user equipment and a communications network and that meet both of the following qualifications: (i) each wireless provider's antenna could fit within an enclosure of no more than six cubic feet in volume; and (ii) all other wireless equipment associated with the facility is cumulatively no more than 28 cubic feet in volume, measured based upon the exterior dimensions of height by width by depth of any enclosure that may be used. The following types of associated ancillary equipment are not included in the calculation of the volume of all other wireless equipment associated with any such facility: electric meters; concealment elements; telecommunications demarcation boxes; grounding equipment; power transfer switches; cut-off switches;

and vertical cable runs for connection of power and other services. Such term shall not include a pole, decorative pole, or support structure on, under, or within which the equipment is located or collocated or to which the equipment is attached and shall not include any wireline backhaul facilities or coaxial, fiber optic, or other cabling that is between small wireless facilities, poles, decorative poles, or support structures or that is not otherwise immediately adjacent to or directly associated with a particular antenna.

State means the State of Georgia.

Support structure means a building, billboard, water tank, or any other structure to which a small wireless facility is or may be attached. Such term shall not include a decorative pole, electric transmission structure, or pole.

Wireless infrastructure provider means any person, including a person authorized to provide telecommunications services in this state, that builds, installs, or operates small wireless facilities, poles, decorative poles, or support structures on which small wireless facilities are or are intended to be used for collocation but that is not a wireless services provider.

Wireless provider means a wireless infrastructure provider or a wireless services provider.

Wireless services means any services provided to the public using licensed or unlicensed spectrum, including the use of Wi-Fi, whether at a fixed location or mobile.

Wireless services provider means a person that provides wireless services.

Wireline backhaul facility means an aboveground or underground wireline facility used to transport communications data from a telecommunications demarcation box associated with small wireless facility to a network.

(b) In the event that any federal or state law containing definitions used in this article is amended, the definition in the referenced section, as amended, shall control.

(Ord. No. 132, § 1(Exh. A), 9-5-2019) Sec. 82-193. Permits.

(a) A permit is required to collocate a small wireless facility in the public right-of-way or to install, modify, or replace a pole or a decorative pole in the public right-of-way. A permit is not required to perform the activities described in O.C.G.A. § 36-66C-6(e) or (f).

(b) Any person seeking to collocate a small wireless facility in the public right-of-way or to install, modify, or replace a pole or a decorative pole in the public right-of-way shall submit an application to the Forsyth County Department of Engineering for a permit. Applications are available from the Forsyth County Department of Engineering. Any material change to information contained in an application shall be submitted in writing to the Forsyth County Department of Engineering within 30 days after the events necessitating the change.

(c) Any person who intends to submit an application to the county pursuant to this article shall meet with the Forsyth County Department of Engineering at least 30 days prior to submitting an application for a permit. The purpose of such meeting shall be to inform the county, in good faith, when the applicant expects to commence deployment of small wireless facilities and poles within the county, the number of small wireless facilities and poles it expects to deploy during the 24 months after commencement, and the expected timing of such deployments.

(d) Each application shall be submitted by the applicable wireless provider or its duly authorized representative and shall contain the following:

(1) The applicant's name, address, telephone number, and email address, including emergency contact information for the applicant;

(2) The names, addresses, telephone numbers, and email addresses of all consultants, if any, acting on behalf of the applicant with respect to filing the application;

(3) A general description of the proposed work and the purposes and intent of the proposed facility. The scope and detail of such description shall be appropriate to the nature and character of the physical work to be performed, with special emphasis on those matters likely to be affected or impacted by the physical work proposed;

(4) Detailed construction drawings regarding the proposed use of the right-of-way;

(5) To the extent the proposed facility involves collocation on a pole or support structure, a structural report performed by a duly licensed engineer evidencing that the pole or support structure will structurally support the collocation (or that the pole or support structure may and will be modified to meet structural requirements) in accordance with applicable codes;

(6) For any new aboveground facilities, visual depictions or representations if not included in the construction drawings;

(7) Information indicating the horizontal and approximate vertical location, relative to the boundaries of the right-of-way, of the small wireless facility for which the application is being submitted;

(8) If the application is for the installation of a pole, a certification that complies with O.C.G.A. § 36-66C-6(k);

(9) If the small wireless facility will be collocated on a pole or support structure owned by a third party, a certification that the wireless provider has permission from the owner to collocate on the pole or support structure; and

(10) If the applicant is not a wireless services provider, a certification that a wireless services provider has requested in writing that the applicant collocate the small wireless facilities or install, modify or replace the pole or decorative pole at the requested location.

(e) Each application for a permit shall include the maximum application fees permitted under O.C.G.A. § 36-66C-5(a)(1), (a)(2) and (a)(3). Such maximum application fees shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b).

(f) The Forsyth County Department of Engineering shall review applications for permits according to the timelines and using the procedures identified in O.C.G.A. §§ 36-66C-7 and 36-66C-13.

(g) Applications for permits shall be approved unless the requested collocation of a small wireless facility or the requested installation, modification, or replacement of a pole or decorative pole:

(1) Interferes with the operation of traffic control equipment;

(2) Interferes with sight lines or clear zones for transportation or pedestrians;

(3) Fails to comply with the Americans with Disabilities Act, 42 U.S.C. Section 12101, et seq., or similar laws of general applicability regarding pedestrian access or movement;

(4) Requests that ground-mounted small wireless facility equipment be located more than seven and one-half feet in radial circumference from the base of the pole, decorative pole or support structure to which the small wireless facility antenna would be attached, provided that the county shall not deny the application if a greater distance from the base of the pole, decorative pole or support structure is necessary to avoid interfering with sight lines or clear zones for transportation or pedestrians or to otherwise to protect public safety;

(5) Fails to comply with applicable codes;

(6) Fails to comply with the maximum limitations set forth in section 82-195 of this article of O.C.G.A. § 36-66C-7(h) or (i);

(7) With respect to an application to install a pole or decorative pole, interferes with the widening, repair, reconstruction, or relocation of a public road or highway by an county or the department of transportation that has been advertised for bid and scheduled for completion within six months after the application is filed;

(8) With respect to an application to install a pole or decorative pole, interferes with a public works construction project governed by O.C.G.A. tit. 36, ch. 91 which is advertised for bid and scheduled for completion within six months after the application is filed;

(9) Fails to comply with O.C.G.A. § 36-66C-10, O.C.G.A. § 36-66C-11, or O.C.G.A.

§ 36-66C-12;

(10) Fails to comply with laws of general applicability addressing pedestrian and vehicular traffic and safety requirements; or

(11) Fails to comply with laws of general applicability that address the occupancy or management of the right-of-way and that are not otherwise inconsistent with this article.

(h) For applications for new poles in the public right-of-way in areas zoned for residential use, the Forsyth County Department of Engineering may propose an alternate location in the public right-of-way within 100 feet of the location set forth in the application, and the wireless provider shall use the Forsyth County Department of Engineering proposed alternate location unless the location imposes technical limits or significant additional costs.

The wireless provider shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and it shall provide a written summary of the basis for such determination.

(i) A permit issued under this section 82-193 shall authorize such person to occupy the public right-of-way to: (i) collocate a small wireless facility on or adjacent to a pole or a support structure that does not exceed the limitations set forth in O.C.G.A. § 36-66C-7(h)(3) or on or adjacent to a decorative pole in compliance with O.C.G.A. § 36-66C-12; and (ii) install, modify, or replace a pole or decorative pole for collocation of a small wireless facility that does not exceed the limitations set forth in O.C.G.A. § 36-66C-7(h)(1) and (h)(2).

(j) Upon the issuance of a permit under this article, and on each anniversary of such issuance, every person issued a permit shall submit to the county the maximum annual payments permitted under O.C.G.A. § 36-66C-5(a)(4) and (a)(5); provided, however, that if such person removes its small wireless facilities form the public rights-of-way pursuant to O.C.G.A. § 36-66C-5(e), then such person shall be responsible for the pro rata portion of the annual payment based on the number of days of occupation since the last annual payment.

Upon making such pro rata payment and removal of the small wireless facilities, the person's annual payment obligations under this section shall cease as of the date of the actual removal. The maximum annual payments shall automatically increase on January 1 of each year beginning January 1, 2021, as provided under O.C.G.A. § 36-66C-5(b).

(k) Any person issued a permit shall pay the fees identified in O.C.G.A. § 36-66C-5(a)(6) and (a)(7), as applicable.

(l) The county may revoke a permit issued pursuant to this section 82-193 if the wireless provider or its equipment placed in the public right-of-way under that permit subsequently is not in compliance with any provision of this article or the Georgia Streamlining Wireless Facilities and Antennas Act. Upon revocation, the county may proceed according to subsection (m).

(m) If a wireless provider occupies the public rights-of-way without obtaining a permit required by this section 82-193 or without complying with the SWFAA, then the county may, at the sole discretion of the county, restore the right-of-way, to the extent practicable in the reasonable judgment of the county, to its condition prior to the unpermitted collocation or installation and to charge the responsible wireless provider the reasonable, documented cost of the county in doing so, plus a penalty not to exceed $1,000.00. The county may suspend the ability of the wireless provider to receive any new permits from the county under this section 82-193 until the wireless provider has paid the amount assessed for such restoration costs and the penalty assessed, if any; provided, however, that the county may not suspend such ability of any applicant that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction.

(n) All accepted applications for permits shall be publicly available subject to the limitations identified in O.C.G.A. § 36-66C-6(c).

(o) An applicant may file a consolidated application related to multiple small wireless facilities, poles or decorative poles so long as such consolidated application meets the requirements of O.C.G.A. § 36-66C-13.

(p) Activities authorized under a permit shall be completed within the timelines provided in O.C.G.A. § 36-66C-7(k)(2).

(q) Issuance of a permit authorizes the applicant to: (i) undertake the collocation, installation, modification or replacement approved by the permit and (ii) operate and maintain the small wireless facilities and any associated pole covered by the permit for a period of ten years.

(r) Permits shall be renewed following the expiration of the term identified in subsection

(q) upon the terms and conditions identified in O.C.G.A. § 36-66C-7(k)(2)(B).

(s) If an application for a permit seeks to collocate small wireless facilities on authority poles in the public rights-of-way, then the county shall, within 60 days of receipt of the completed application: (i) provide a good faith estimate for any make-ready work necessary to enable the authority pole to support the proposed facility; or (ii) notify the wireless provider that the wireless provider will be required to perform the make-ready work. Any make-ready work performed by the county shall be completed pursuant to and in accordance with the provisions of O.C.G.A. § 36-66C-7(n).

(Ord. No. 132, § 1(Exh. A), 9-5-2019) Sec. 82-194. Removal; relocation; reconditioning; replacement; abandonment.

(a) A person may remove its small wireless facilities from the public rights of according to the procedures of O.C.G.A. § 36-66C-5(e).

(b) In the event of a removal under subsection (a), the right-of-way shall be, to the extent practicable in the reasonable judgment of the county, restored to its condition prior to the removal. If a person fails to return the right-of-way, to the extent practicable in the reasonable judgment of the county, to its condition prior to the removal within 90 days of the removal, the county may, at the sole discretion of the county, restore the right-of-way to such condition and charge the person the county's reasonable, documented cost of removal and restoration, plus a penalty not to exceed $500.00. The county may suspend the ability of the person to receive any new permits under section 82-193 until the person has paid the amount assessed for such restoration costs and the penalty assessed, if any; provided, however, that the county will not suspend such ability of any person that has deposited the amount in controversy in escrow pending an adjudication of the merits of the dispute by a court of competent jurisdiction.

(c) If, in the reasonable exercise of police powers, the county determines: (i) a pole or support structure unreasonably interferes with the widening, repair, reconstruction, or relocation of a public road or highway, or (ii) relocation of poles, support structures, or small wireless facilities is required as a result of a public project, the wireless provider shall relocate such poles, support structures, or small wireless facilities pursuant to and in accordance with the provisions of O.C.G.A. § 36-66C-7(l). If the wireless provider fails to relocate a pole, support structure or small wireless facility or fails to provide a written good faith estimate of the time needed to relocate the pole, support structure or small wireless within the time period prescribed in O.C.G.A. § 36-66C-7(l), the county make take the actions authorized by O.C.G.A. § 36-66C-7(o), in addition to any other powers under applicable law.

(d) The county shall recondition and replace authority poles consistent with the provisions of O.C.G.A. § 36-66C-7(m). Wireless providers shall accommodate and cooperate with reconditioning and replacement consistent with the provisions of O.C.G.A. § 36-66C7(m).

(e) A wireless provider must notify the county of its decision to abandon any small wireless facility, support structure or pole pursuant to and in accordance with the provisions of O.C.G.A. § 36-66C-7(p)(1). The wireless provider shall perform all acts and duties identified in O.C.G.A. § 36-66C-7(p) regarding abandonment. The county may take all actions and exercise all powers authorized under O.C.G.A. § 36-66C-7(p) upon abandonment, in addition to any other powers under applicable law.

(Ord. No. 132, § 1(Exh. A), 9-5-2019) Sec. 82-195. Standards.

(a) Small wireless facilities and new, modified, or replacement poles to be used for collocation of small wireless facilities may be placed in the public right-of-way as a permitted use: (i) upon a receipt of a permit under section 82-193; (ii) subject to applicable codes; and (iii) so long as such small wireless facilities and new, modified, or replacement poles to be used for collocation of small wireless facilities comply with the appropriate provisions of O.C.G.A. § 36-66C-7(h).

(1) New, modified, or replacement poles installed in the right-of-way in a historic district and in an area zoned primarily for residential use shall not exceed 50 feet above ground level.

(2) Each new, modified, or replacement pole installed in the right-of-way that is not in a historic district or in an area zoned primarily for residential use shall not exceed the greater of:

a. Fifty feet above ground level; or

b. Ten feet greater in height above ground level than the tallest existing pole in the same public right-of-way in place as of January 1, 2019, and located within 500 feet of the new proposed pole;

(3) New small wireless facilities in the public right-of-way and collocated on an existing pole or support structure shall not exceed more than ten feet above the existing pole or support structure.

(4) New small wireless facilities in the public right-of-way collocated on a new or replacement pole under subsection (a)(1) or subsection (a)(2) may not extend above the top of such poles.

(b) Unless it is determined that another design is less intrusive, or placement is required under applicable law, small wireless facilities shall be concealed as follows:

(1) Antennas located at the top of poles and support structures shall be incorporated into the pole or support structure, or placed within shrouds of a size such that the antenna appears to be part of the pole or support structure.

(2) Antennas placed elsewhere on a pole or support structure shall be integrated into the pole or support structure, or be designed and placed to minimize visual impacts.

(3) Radio units or equipment cabinets holding radio units and mounted on a pole shall be placed as high as possible, located to avoid interfering with, or creating any hazard to, any other use of the public rights-of-way, and located on one side of the pole. Unless the radio units or equipment cabinets can be concealed by appropriate traffic signage, radio units or equipment cabinets mounted below the communications space on poles shall be designed so that the largest dimension is vertical, and the width is such that the radio units or equipment cabinets are minimally visible from the opposite side of the pole on which they are placed.

(4) Wiring and cabling shall be neat and concealed within or flush to the pole or support structure, ensuring concealment of these components to the greatest extent possible.

(c) Notwithstanding any provision of this article to the contrary, an applicant may collocate a small wireless facility within a historic district, and may place or replace a pole within a historic district, only upon satisfaction of the following: (i) issuance of a permit under section 82-193 and (ii) compliance with applicable codes.

(d) Notwithstanding any provision of this article to the contrary, an applicant may collocate a small wireless facility on a decorative pole, or may replace a decorative pole with a new decorative pole, in the event the existing decorative pole will not structurally support the attachment, only upon satisfaction of the following: (i) issuance of a permit under section 82-193 and (ii) compliance with applicable codes.

(Ord. No. 132, § 1(Exh. A), 9-5-2019) Chapters 83—85 Chapter 86

VEGETATION*

ARTICLE I. IN GENERAL

Secs. 86-1—86-30. Reserved.

ARTICLE II. TREE PROTECTION AND REPLACEMENT*

DIVISION 1. GENERALLY

Sec. 86-31. Purpose.

The intent of this article is to provide a uniform standard for the protection and replacement of trees on all real property that requires the issuance of a land disturbance permit, as referenced in the Forsyth County Unified Development Code, within the unincorporated areas of Forsyth County.

The county recognizes the importance of trees, which sustain and enhance quality of life, health and economic development of the community. Tree conservation and planting enhancement contributes positive impacts toward stormwater runoff, environmental health, air quality and property values as well as offering protection for environmentally sensitive areas.

(Ord. No. 98-E, § 1.0, 5-6-2021) Sec. 86-32. Short title.

This enactment may be cited as the "Forsyth County Tree Protection and Replacement Ordinance."

(Ord. No. 98-E, § 1.1, 5-6-2021) Sec. 86-33. Definitions.

The following words and terms, when used in this article, shall have the meanings as described in this section, unless the context indicates otherwise:

Agriculture: The commercial cultivation or growth from or on the land of horticultural, floricultural, forestry, dairy, livestock, poultry, and apiarian products. Included within the definition of "Agriculture" shall be the importation, storage, or distribution in bulk, unpackaged form of raw materials directly to persons engaged in agriculture. "Raw materials" for purposes of this definition shall include organic materials such as straw, hay, animal feeds, sawdust, mulches, and like items. "Raw materials" shall also include inorganic dolomitic lime. "Raw materials" shall not include farm equipment, building materials, chemicals, fertilizer, manure not produced on the premises, packaged materials not produced on the premises, materials distributed for resale not produced on the premises, or materials not expended in the production of the above listed products.

Arborist: A professional certified by the International Society of Arboriculture who possesses the technical competence through experience and related training to provide for or supervise the management of trees and other woody plants in the residential, commercial, and public landscape

Basal area: The cross-sectional area of all trees on a given area measured 4.5 feet above the ground. In American forest practice, it is expressed in square feet for an acre. Example:

An acre of land with a basal area of 120 would have 120 square feet of cross-sectional trunk area (3.14 X r2 where r is equal to the diameter of the tree).

Boundary tree: A tree located along a property line with any portion of its trunk crossing the property line.

Buffer: An undisturbed naturally-existing area, a landscape area or combination of both designed for screening and protection around the perimeter of a parcel or water body.

(a) State waters buffer is defined as an area along the course of any state waters required by federal, state or local statute or ordinance, to be maintained in an undisturbed and natural condition.

(b) Zoning buffer is defined as a natural and/or landscaped open space required by the Forsyth County Unified Development Code for buffering incompatible land uses to achieve a visual barrier between the use on the lot and adjacent uses.

Caliper: A forestry standard of tree trunk measurement for understory or replacement trees. Caliper will be measured at ground level for trees having a four-inch caliper or less.

Clearcut: A silvicultural system in which all merchantable trees are harvested over a specified area in one operation.

Clearing: The removal of vegetation from a property, whether by cutting or other means.

Commercial zoning district: For the purposes of this ordinance the following zoning districts are defined as commercial: NS, UV, HB, CBD, HC, BP, O&I, OR, and OCMS.

Additionally, any zoning district created after the adoption of this ordinance will be classified as a "Residential Zoning District," "Commercial Zoning District," "Industrial Zoning District," or "Mixed Use Zoning District" by the director of the department of planning and community development, depending on the characteristics of the new zoning district.

Common area: Area(s) within a development or subdivision, not part of an individual lot, designed and intended for beautification, recreation and/or the preservation of natural features.

County arborist: A staff position within the department of planning and community development with the primary responsibilities of administration and enforcement of the tree protection and replacement ordinance.

Critical root zone: The minimum area beneath a tree that must be left undisturbed in order to preserve sufficient root mass to give a tree a reasonable chance of survival. The critical root zone (CRZ) is a circle centered on the tree's trunk with a radius equal in feet to

1.3 times the number of inches of the tree's diameter at breast height.

Example: A tree with a diameter of 20 inches would have a CRZ radius of 26 feet.

Density factor: A unit of measure used to prescribe the calculated required tree coverage on a site.

Department of planning and community development: Forsyth County Department of Planning and Community Development, or successor department, by whatever title designated.

Disturbed area: Land area subject to any land-disturbing activity.

Diameter breast height (DBH): The standard measure of tree size, is the diameter of a tree trunk measured in inches at a height of four and one-half feet above the ground. If a tree splits into multiple trunks below four and one-half feet, then the trunk is measured at its most narrow point beneath the split.

Director: The manager of the department of planning and community development, or his successor to his duties, by whatever title designated, or his designee.

Dripline: A line on the ground established by a vertical plane extending from a tree's outermost branch tips down to the ground; i.e., the line enclosing the area directly beneath the tree's crown from which rainfall would drip.

Grading: The placement, removal, or movement of earth by use of mechanical equipment on a property. This includes stripping, cutting, filling, stock piling, or any combination thereof, and shall include the land itself in its cut or filled condition.

Growing season: A period of not less than 12 months during which there are at least three contiguous months of dormancy followed by a spring leafing.

Hardwood tree: Any tree that is not coniferous (not cone bearing or a needle leaf evergreen).

Hazard trees: Any tree or tree part that poses a risk of danger or injury upon failure or fracture for damage or injury. Generally recognized as a 0 (no hazard) to 9 (high hazard) score with 0 to 3 points assigned for failure potential, size of part, and target rating.

Reference the book, Evaluation of Hazard Trees in Urban Areas, Nelda P. Matheny and James R. Clark, International Society of Arboriculture, 1991.

Industrial zoning district: For the purposes of this ordinance the following zoning districts are defined as industrial: M1, M2, and MINE. Additionally, any zoning district created after the adoption of this ordinance will be classified as a "Residential Zoning District," "Commercial Zoning District," "Industrial Zoning District," or "Mixed Use Zoning District" by the director of the department of planning and community development, depending on the characteristics of the new zoning district.

Land disturbance permit: The authorization necessary to begin a land-disturbing activity under the provisions of the Unified Development Code.

Land-disturbing activity: Any grading, scraping, excavating, or filling of land; clearing of vegetation; and any construction, rebuilding, or alteration of a structure. Land-disturbing activity shall not include activities such as ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions or minor modifications to a single family dwelling, and the cutting of firewood for personal use.

Landmark and historic tree: Any tree or group of trees which the Georgia Tree Council has included on the Georgia Landmark and Historic Tree Register based on their importance in national, state or local history.

Lot: A portion or parcel of land separated from other portions or parcels by description (such as on a subdivision plat of record or a survey map or plat) or described by metes and bounds, and intended for use, transfer of ownership, or for building development. The word "Lot" shall not include any portion of a dedicated right-of-way. For purposes of calculating lot sizes, a lot shall also exclude any areas reserved for easements upon which, by the nature thereof, construction is prohibited, i.e., easements for ingress and egress to other lots or properties, major power line transmission easements, etc. For purposes of calculating Lot sizes, "lot" shall also not include strips of property, with widths less than the minimum lot width of the particular zoning district, intended to provide access to a given lot or parcel;

provided, however, land less than the minimum required lot width may be considered as part of the square footage lot size calculation in those instances where lot lines are radial to a curved street or cul-de-sac on a major or minor subdivision plat approved by the department of planning and community development.

Mixed use zoning district: For the purposes of this article the following zoning districts are defined as mixed use: PUD and MPD. Additionally, any zoning district created after the adoption of this article will be classified as a "Residential Zoning District," "Commercial Zoning District," "Industrial Zoning District," or "Mixed Use Zoning District" by the director of the department of planning and community development, depending on the characteristics of the new zoning district.

Naturalistic planting: A freely intermingled tree planting in groupings that avoid monoculture in tree species and size. Void of repeating planting patterns throughout larger grouping.

Overstory tree: Those trees that compose the top layer or canopy of vegetation and will generally reach a mature height of 40 feet or more.

Parking bay, double: The clear space containing two rows of parking stalls.

Parking bay, single: The clear space containing one row of parking stalls.

Person: A natural human being, estate, association, firm, partnership, corporation, or other legal entity.

Replacement tree: A new tree planted on a site to meet minimum site density factor requirements.

Residential zoning district: For the purposes of this article the following zoning districts are defined as residential: R1R, CR1, R1, R2R, OSR, R2, R3, R4, RES1, RES2, CR2, RES3, RES4, RES6, LR, A1, and AG-RES. Additionally, any zoning district created after the adoption of this ordinance will be classified as a "Residential Zoning District," "Commercial Zoning District," "Industrial Zoning District," or "Mixed Use Zoning District" by the director of the department of planning and community development, depending on the characteristics of the new zoning district.

Significant tree: Any landmark and historic tree, specimen tree; or any tree deemed by the county arborist, a registered forester or a registered landscape architect to be of a rare or unusual species.

Site: Any lot or parcel of land, or a combination of contiguous lots or parcels of land, where grading, building, construction, or alteration is performed or permitted.

Site density factor: The minimum number of tree density units per acre, including recompense for significant trees, that must be achieved on a property after development.

Softwood tree: Any coniferous (cone bearing or needle leaf evergreen) tree.

Specimen tree or stand: Any tree or grouping of trees which has been determined, by the county arborist, to be of high value because of its species, size, age, or other professional criteria. Not all the trees within a specimen tree stand must be the size of specimen trees for the stand to qualify.

Tree: Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity normally attaining a trunk diameter greater than three inches at any point and a height of over ten feet.

Tree density unit: A credit assigned to a tree, based on the diameter of the tree, in accordance with tables contained in this article.

Tree diameter: The widest cross-sectional dimension of a tree trunk measured at diameter breast height (DBH) or at a point below DBH for new trees or multi-trunked species, but in no case less than six inches from the ground.

Tree grouping: A community of ten or more existing trees with one continuous dripline, as determined by the landscape architect, arborist and/or county arborist to merit special consideration as an ecological feature based upon species composition, condition, age, and structure.

Tree protection and/or replacement plan (TP/RP): A plan that identifies tree protection areas, existing trees to be retained and proposed trees to be planted on a site to meet minimum requirements, as well as methods of tree protection to be undertaken on the site and other pertinent information.

Tree protection area: Any portion on a site wherein are located existing trees that are proposed to be retained in order to comply with the requirements of this article or any other existing trees proposed to be retained due to zoning conditions or requirements from other ordinances.

Tree save area: Any portion of a site wherein are located existing trees that are proposed to be retained in order to comply with the requirements of this article. The tree save area shall include no less than the total area defined by the critical root zone (CRZ) of a tree or a group of trees, collectively.

Understory tree: A tree that, under normal forest conditions, may grow to maturity beneath overstory trees and will generally reach a mature height of at least ten feet but less than 40 feet.

(Ord. No. 98-E, § 1.2, 5-6-2021) Sec. 86-34. Scope.

The terms and provisions of this article shall apply to all real property being within the unincorporated areas of Forsyth County.

(Ord. No. 98-E, § 1.3, 5-6-2021) Sec. 86-35. Severability and conflicts.

(a) If any provision of this article is found by a court of competent jurisdiction to be invalid or unconstitutional, or if the application is found to be invalid or unconstitutional, such as invalidity or unconstitutionality shall not affect other provisions or applications of this article which can be given effect without the invalid or unconstitutional provision or application.

(b) All laws, resolutions, or ordinances or parts thereof that conflict with the provisions of this article are repealed, including the repeal of the heretofore-existing Ordinance 81 and any amendments thereto.

(Ord. No. 98-E, § 1.4, 5-6-2021) Secs. 86-36—86-50. Reserved.

DIVISION 2. APPLICABILITY AND PERMITTING

Sec. 86-51. Exemptions.

The following activities are specifically exempted from this Ordinance:

(1) Land clearing or clearing and grubbing activities for bona fide agricultural purposes permitted in agricultural zoning districts.

(2) Construction of single family detached residential dwellings that are not part of a major subdivision as defined by the Forsyth County Unified Development Code.

(3) Any addition, alteration, improvement or minor remodeling of an existing residence or construction of structures accessory to an existing residence.

(4) Tree removal by an existing, single-family homeowner.

(5) The construction of telecommunication towers (cell towers).

(6) Removing trees from nurseries and botanical gardens, which are being grown for retail or wholesale sale.

(7) Growing orchards of trees in active commercial operation for bona fide agricultural purposes only.

(8) Public utility companies and government agencies conducting operation on public and utility rights-of-way and easements or on sites for electric power substations and similar facilities which operations are for the purpose of assuring uninterrupted utility and governmental services and unobstructed passage on public streets.

(9) Removal of dead, diseased or infested trees upon receiving written confirmation from the Georgia Forestry Commission or Arborist.

(10) Unzoned tracts of property as described in O.C.G.A. § 12-6-24(e)(4)(B).

(11) Timber harvesting as provided in O.C.G.A. § 12-6-24(e).

(12) Including but not limited to lakes and detention ponds, and drainage easements, unless planted as part of the stormwater system.

(13) Removal of trees for county trails and greenways on public easements.

(Ord. No. 98-E, § 2.1, 5-6-2021) Sec. 86-52. Zoning applications.

All zoning applications shall include a sworn statement that the property has not been clearcut within three years prior to the zoning application and shall state that the property will not be clear cut prior to a decision by the board of commissioners on the zoning. Any property which has been clear cut within three years prior to the date of the zoning application, shall not be eligible for rezoning for a period of three years from the date said property was clear cut.

A pre-submittal meeting with the county arborist shall be required prior to the submission of any application requiring inclusion of a site plan and approval by the board of commissioners (including but not limited to applications for rezoning, sketch plat approval, and zoning condition amendment) for any project involving a residential use on property of at least ten acres, excluding projects to be located in a mixed use zoning district. A completed specimen tree survey and site plan for the project shall be provided to the county arborist prior to scheduling the pre-submittal meeting with reasonably sufficient time to allow the county arborist to review the plan before the meeting.

Submitted site plans that accompany residential proposals as noted above shall include a table that contains square footage calculations for the total site area, the existing tree canopy coverage and the estimated post-development tree canopy coverage. Site plans must show the proposed disturbed area, required buffers, any existing easements, and wetland areas as well as proposed tree save areas to satisfy the requirements below and to count towards the required site density factor in accordance with section 86-61.

The county arborist in consultation with the applicant shall identify significant trees, based on the locations provided by the specimen tree survey, when required, to be preserved within required tree groupings.

Tree groupings shall be required in accordance with the following:

(1) Property located or proposed to be located in residential zoning districts shall designate a minimum of ten percent of the site acreage in square feet for the retention of tree groupings.

(2) Property located or proposed to be located in commercial, mixed use and industrial zoning districts shall designate a minimum of eight percent of the site acreage in square feet for the retention of tree groupings. This area must be designated on the site plan at the time of application submittal, but the application does not have to include a specimen tree survey.

(3) For sites that do not have substantial, existing tree coverage, such as pastures or sparsely vegetated areas that have few existing trees, the estimated tree replacement area in square feet necessary to accommodate the replacement trees needed to satisfy the required site density factor in section 86-61 shall be indicated on the site plan. Any tree replacement for tree grouping areas shall reflect a naturalistic planting scheme.

Site plans for residential uses that are submitted for board of commissioner approval shall reflect the preservation of specific significant trees as determined through consultation with the county arborist within identified tree groupings that meet the requirements of this article.

(Ord. No. 98-E, § 2.2, 5-6-2021) Sec. 86-53. Permit procedures.

(a) All applications for a land disturbance permit shall require submission and approval of a tree protection and/or replacement plan as defined in this article.

(b) Tree protection and/or replacement plans shall be prepared by a registered landscape architect, urban forester, or arborist in accordance with the specifications for such plans contained herein. The performance of professional services in the preparation of plans required herein shall comply with Georgia Law governing the practice of the applicable profession. When the plantingg of replacement trees is not required to meet the site density factor, licensed professionals (e.g. architects, engineers, surveyors etc.) may be authorized by the county arborist to prepare the tree protection and/or replacement plan, provided that they demonstrate, to the satisfaction of the county arborist, competency and knowledge in the principles and practices of arboriculture.

(c) All tree protection and/or replacement plans and related documents shall be reviewed by the department of planning and community development for conformance to the provisions of these regulations. The permit process shall be identical to that described in the UDC, but will require approval and sign-off of the tree protection and/or replacement plan.

(d) After the submission of the plan, the county arborist will perform a site walk. The tree protection and/or replacement plan shall provide sufficient information and detail to clearly demonstrate that all applicable requirements and standards of this article will be fully satisfied.

(e) Significant trees shall be tagged in the field with numerical identification corresponding to the survey, inventory, and tree protection and/or replacement plan analysis until project receives final approval for as-built or final plat application as referenced in the Forsyth County Unified Development Code.

(f) The tree protection and/or replacement plan shall be shown on a copy of a site plan, as appropriate to the proposed development, drawn to the same scale as the other plan documents prepared for a land disturbance permit application on the property, and shall cover the same area.

(1) A tree survey and inventory showing all significant trees, and tree groupings, within the property line with an indication of DBH, species, and whether they are to be retained or removed.

(2) All tree protection areas.

(3) Approximate location of all specimen trees or tree groupings.

(4) Exact location of all specimen trees when their protection is questionable or might result in a change of site design.

(5) Those specimen trees to be removed and reason for removal.

(6) Property line and limits of disturbed area.

(7) Existing and proposed location of underground utilities or easements.

(8) All existing utilities and those to be installed, proposed site grading, approximate location of all existing and proposed structures, driveways and curb cuts, and utility easements shall be shown and identified.

(9) Proposed grades shall be shown on the plans including labeling for slopes greater than ten percent at two-foot contours, along with identification of all environmentally sensitive areas and required site and natural buffers.

(10) Methods of tree protection for all tree protection areas, including but not limited to tree fencing, erosion control, retaining walls, tunneling for utilities, aeration systems, transplanting, staking, signage, etc.

(11) Staging areas for parking, material storage, concrete washout, debris burn and burial holes where these areas might negatively impact protected trees.

(12) Demonstration of compliance with the required site density factor including existing trees or groupings of trees used in the density calculation.

(13) A planting schedule showing the type (common and botanical names), size and quantity of trees to be planted, and any special planting notes.

(14) The locations of all trees to be planted on the site to meet density requirements.

(15) A note indicating the type of irrigation to be used.

(16) Additional information as required by the county arborist on a case by case basis to show compliance with this article.

(g) The following notes shall be shown on the tree protection and/or replacement plans:

TREE PROTECTION NOTES:

TREE PROTECTION FENCING MUST BE INSTALLED AND INSPECTED PRIOR TO OR CONCURRENT WITH ANY CLEARING, GRUBBING OR GRADING. CALL THE DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT FOR AN INSPECTION.

TREE PROTECTION SHALL BE ENFORCED ACCORDING TO THE FORSYTH COUNTY

TREE PRESERVATION AND REPLACEMENT ORDINANCE.

THE DENSITY REQUIREMENTS SHOWN ON THE TREE PROTECTION AND/OR

REPLACEMENT PLAN MUST BE VERIFIED PRIOR TO THE ISSUANCE OF THE

CERTIFICATE OF OCCUPANCY OR ACCEPTANCE OF THE FINAL PLAT. CALL THE

DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT FOR AN INSPECTION.

WITH THE EXCEPTION OF SINGLE FAMILY RESIDENTIAL DEVELOPMENTS,

MAINTENANCE INSPECTION FOR TREES WILL BE PERFORMED AFTER ONE FULL

GROWING SEASON FROM THE DATE OF THE FINAL SITE INSPECTION. PROJECT

OWNERS AT THE TIME OF THE MAINTENANCE INSPECTION ARE RESPONSIBLE

FOR SCHEDULING THIS INSPECTION.

TREE DENSITY REQUIREMENTS SHOWN ON THE TREE PROTECTION AND/OR

REPLACEMENT PLAN MUST BE VERIFIED PRIOR TO THE ISSUANCE OF THE

CERTIFICATE OF OCCUPANCY OR ACCEPTANCE OF THE PROJECT. CALL THE

DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT FOR AN INSPECTION.

WITH THE EXCEPTION OF SINGLE FAMILY RESIDENTIAL DEVELOPMENTS,

MAINTENANCE INSPECTION FOR TREES WILL BE PERFORMED AFTER ONE FULL

GROWING SEASON FROM THE DATE OF THE FINAL SITE INSPECTION. PROJECT

OWNERS AT THE TIME OF THE MAINTENANCE INSPECTION ARE RESPONSIBLE

FOR SCHEDULING THIS INSPECTION.

ALL PLANT MATERIALS ARE TO CONFORM TO THE AMERICAN STANDARD FOR

NURSERY STOCK, LATEST EDITION, AMERICAN ASSOCIATION OF NURSERYMEN.

(Ord. No. 98-E, § 2.3, 5-6-2021) Sec. 86-54. Permit review procedures.

The department of planning and community development administers the Forsyth County Tree Protection and Replacement Ordinance. The county arborist is the primary tree plan reviewer and is responsible for making professional judgments regarding any arboricultural principles or practices related to the implementation of this article.

(a) Pre-submittal conference. Developers and design professionals are encouraged to meet with the county arborist and/or other department of planning and community development professional staff prior to submitting a tree protection and/or replacement plan. The county arborist is available for field inspections of site conditions prior to submittal to give advice as to the relative value of trees, and to assist in the tree protection and/or replacement plan development process as it relates to preserving trees. Information can also be disseminated about how to prepare a tree protection and/or replacement plan.

(b) Land disturbance permit. Tree protection and/or replacement plans shall be submitted with other permit drawings as part of the plan approval and/or land disturbance permit process as required in the Unified Development Code. The department of planning and community development shall review these plans for conformance with the tree protection and replacement ordinance in the manner specified in the Unified Development Code.

(c) Clearing, grading and development activities shall conform in all respects with the approved tree preservation and/or tree replacement Plan. If any revisions to the plans occur that affect the clearing and grading limits, changes must be reflected in a subsequently submitted permit application and shown on a revised and approved tree preservation and/or tree replacement plan prior to the commencement of changed activities on site.

(d) A post development tree survey shall be submitted and approved prior to issuance of a final plat or as-built for residential uses located on property of at least ten acres excluding mixed use zoning districts.

(Ord. No. 98-E, § 2.4, 5-6-2021) Sec. 86-55. Tree protection and/or replacement plan standards.

The following section establishes standards by which plans and field conditions are to be evaluated to determine compliance with the Forsyth County Tree Protection and Replacement Ordinance.

(a) Protection of existing trees. If trees are existing on the site, the required density (see section 86-61) should be met with those trees. If this cannot be done, replacement trees are required. A tree protection and/or replacement plan must be a part of the approved land disturbance plan (refer to section 86-56 for specific requirements of a tree protection and/or replacement plan).

When a choice is available as to which existing trees to save, significant trees, even isolated individual trees, should be given preference over other trees. Nonsignificant trees, however, should be saved in stands rather than as individual trees scattered over a site.

(b) Tree protection and grading. Site work allowed pursuant to an approved land disturbance permit shall be coordinated to protect significant trees and tree groupings. Efforts shall be taken to minimize changes to natural grade to preserve existing trees by avoiding impacts to the established CRZ.

(c) Tree inventories and surveys. All trees that are to be counted toward meeting density requirements must be inventoried. Significant trees must be shown on the tree protection and/or replacement plan with an indication whether they are to be retained or removed. Approximate locations are acceptable.

(d) Plan review standards.

(1) All tree save areas must be delineated on the tree protection and/or replacement plan along with a designation whether protection during construction is to be active or passive as set forth in section 34-81(a).

(2) The method used to inventory the trees must be indicated on the plans.

(3) All buffers must be identified on the tree protection and/or replacement plan.

(Ord. No. 98-E, § 2.5, 5-6-2021) Sec. 86-56. Tree replacement standards.

The following section establishes standards by which tree protection and/or replacement plans and field conditions are to be evaluated to determine compliance with the Forsyth County Tree Protection and Replacement Ordinance.

Tree protection and/or replacement plans shall be prepared with appropriate consideration given to the function of trees in the landscape. Every effort should be made to maximize the environmental benefit of the plant material.

Trees selected for planting must be free from injury, pests, disease, nutritional disorders or root defects, and must be of good vigor in order to assure a reasonable expectation of survivability.

(a) Criteria for replacement trees.

(1) Spacing and the potential size of species chosen shall be compatible with spatial limitations of the site.

(2) The species must be ecologically compatible with the specifically intended growing site.

(3) Trees must be replaced with at least 60 percent overstory species.

(4) The tree must be compatible in extent of crown and root systems at maturity with nearby utilities.

(5) Where trees must be added to achieve the SDF, pines may not comprise more than 40 percent of the required units. Where existing pines already comprise more than 40 percent of the required units, no more pines may be credited toward the required units. This limitation applies to replacement planting only;

existing pines may comprise 100 percent of the existing density factor.

(6) No more than 40 percent of the replacement trees can be composed of any one genus.

(7) In order for replacement trees to qualify toward the density credits, overstory trees shall be a minimum caliper of two inches and 12 feet in height. All understory trees shall be a minimum caliper of two inches and eight feet in height.

(b) Species. Species selected as replacement trees must be quality species and must be ecologically compatible with the intended-growing Site.

Ornamental and columnar form trees are acceptable for use in meeting density requirements only with prior approval from the county arborist and only for the replacement of understory trees.

(c) Minimum root zones. In order to provide sufficient growing area for planted trees, the following minimum criteria must be observed for replacement trees:

Large trees: 400 sq. ft. of pervious root zone minimum.

Small trees: 100 sq. ft. of pervious root zone minimum.

(Ord. No. 98-E, § 2.6, 5-6-2021) Sec. 86-57. Significant trees.

Some trees on a site warrant special consideration and encouragement for protection.

These trees are referred to as significant trees. Significant trees are composed of specimen, landmark and historic tree, or any tree deemed by the county arborist, a registered forester or a registered landscape architect to be of a rare or unusual species. Criteria for determining specimen, historic, and landmark trees can be found below:

Size Criteria for Specimen Trees.

SPECIMEN TREES SIZE CRITERIA

Overstory Hardwood Trees 18-inch DBH Pine, Poplar and Sweetgum Trees 25-inch DBH Understory/Small Trees 8-inch DBH To obtain credit as a significant tree, significant trees are to be protected in their natural state, free from damage. In order to encourage the protection of significant trees and the incorporation of these trees into the design of projects, additional density credit will be given for significant trees that are successfully saved. Credit for any significant tree saved will be four times the assigned unit value shown in Table A, section 86-61 "Trees to Remain on Site (Existing)."

Significant trees that need to be removed require a plan or written documentation indicating the reason for removal to be submitted to the department of planning and community development prior to the removal. Significant trees removed with prior approval from the department of planning and community development must be replaced at the rate of one unit for each unit awarded it in Table A, section 86-61, in addition to the minimum site density factor in recompense for their removal. Significant trees must be replaced by species with similar characteristics. For commercial and industrial zoning districts, significant tree recompence will not exceed 30.0 units/acre.

(a) Condition criteria for specimen trees. The county arborist will determine if a tree qualifies as a specimen tree using the following criteria:

(1) All specimen trees are to have a sound trunk, with less than 20 percent radial trunk dieback.

(2) No more than one major and several minor dead limbs (hardwoods only).

(3) No major insect or pathological problems.

(4) Life expectancy of 15+ years for hardwoods, 8+ years for pines.

(5) Smaller trees can be considered specimen trees if rare or of unusual quality, species or historical significance.

(6) Specimen tree stands as defined in section 86-33.

(Ord. No. 98-E, § 2.7, 5-6-2021) Sec. 86-58. Removal of significant trees.

If a specimen, historic or landmark tree is damaged or removed without prior approval by the county arborist, recompense or penalty will be required or imposed as follows:

(a) Any specimen tree that is removed without the appropriate review and approval of the county arborist must be replaced by trees with a total density unit value equal to four times the unit value of the tree removed with a minimum of three-inch caliper trees.

(b) If a historic or landmark tree is damaged or removed without prior approval of the county arborist, the department of planning and community development will require replacement by trees with a total density equal to eight times the unit value of the tree removed.

(c) In the event the county arborist determines a specimen, historic or landmark tree is a hazard to property, power lines, or people the tree may be removed without recompense or penalty.

(Ord. No. 98-E, § 2.8, 5-6-2021) Sec. 86-59. Special requirements.

The following classifications will be required to comply with these special requirements in addition to the standard requirements of this article.

(a) Residential zoning district.

(1) The site density factor for development in residential zoning districts shall be met by preserving or replacing trees in common areas, rear and exterior setbacks, and other areas that are not to be disturbed during house construction.

(2) Each detached single-family residential lot shall contain a minimum of two trees, at least one of which must be located in the front yard. Corner lots shall contain a minimum of three trees with at least one tree located in each yard abutting the streets. The required trees must be a minimum of two-inch caliper size and be an overstory hardwood species. Where planting space is limited or an overstory tree would not be compatible with the intended growing site, the use of understory species may be approved on a case by case basis as determined by the county arborist. Existing or replacement trees may be used to satisfy this requirement. The trees may be counted toward the required site density factor for the project.

(3) Common areas in new, major subdivisions and future phases of existing, major subdivisions shall preserve or provide 15 overstory trees per acre. Preserved healthy overstory trees over 16-inch dbh can count for three newly planted overstory trees, as approved by the county arborist.

(b) Commercial and industrial zoning districts subdivisions. Subdivisions in commercial and industrial zoning districts require the site density factor to be shown on the as built. At the time of site development, each lot must submit a tree protection and/or replacement plan indicating compliance with the tree protection and replacement ordinance. Specimen tree liability shall be assessed against the entire development on a prorated per lot basis.

(c) Protection of boundary trees and trees on adjoining properties. In order to protect boundary trees and trees on adjoining property, the tree protection and/or replacement plan shall show all trees within 25 feet of the property line that are eight inches dbh and greater, along with the critical root zone (CRZ) of each such tree. The limits of disturbance on the subject property shall be adjusted so that there is no land disturbance, other than the minimum necessary for utility installation and maintenance, within the CRZ of each such street. In lieu of identifying each such tree, the area of protection may be identified along the property line where trees exist on the adjoining property. The maximum area of protection is 25 feet from the property line. Notwithstanding the area of protection requirements of this subsection, the area of protection described herein is not required along the internal lot lines of a multi-parcel development approved under a single zoning application located in a commercial or industrial zoning district. In the event of a conflict between this section and any other language in the Code of Forsyth County, Georgia, including the Unified Development Code, that would otherwise allow land-disturbing activity prohibited by this section, this section shall prevail.

(Ord. No. 98-E, § 2.9, 5-6-2021; Ord. No. 98-F, § 1(Exh. A), 3-3-2022) Sec. 86-60. Location of trees within a development other than single family development.

Forsyth County has given priority to the retention and placement of trees in frontage planting strips and parking lot planting islands. Trees retained or placed in these areas may be used to meet the site density factor for a project. However, if the site density factor is met with trees saved or planted in other areas, the tree location guidelines outlined below must still be performed with additional tree plantings.

(a) Frontage planting strips. Planting strips shall meet the minimum depth requirements as indicated in the following table. Trees equivalent to at least one tree density unit (see section 86-61) for every 75 linear feet of length shall be saved or planted in such strips (trees may be planted in groups rather than in a single line).

Any trees placed between the right-of-way line or utility easement and the construction area (the buildings, accessory uses, or parking area) may be considered to be in the planting strips. (See Appendix A, Detail 1 - Frontage Planting Strips) Zoning District

Depth of Strip Adjoining Street right-of-way or easement (feet) Multi Family Residential 20 Commercial 10 Industrial 10

(b) Landscape islands. Landscape islands shall be provided within parking areas (but not within vehicle storage, maneuvering, or display areas) as follows:

(1) Landscape islands shall be located at the end of every parking bay and at every 150 linear feet of continuous parking space. Measuring from the trunk, the tree must be a minimum of six feet from the back of the curb. No portion of an island less than three feet in width may be counted in the area. Landscape islands for single parking bays shall contain a minimum of 200 square feet. Landscape islands for double parking bays shall require a minimum of two 200-square-foot islands or one continuous landscape island of 400 square feet.

(2) Landscape islands shall be located in such a manner as to divide and break up the parking area. A planting area, which intrudes upon or is located wholly within a generally rectangular area that is (a) devoted to parking and (b) between a building and a lot line or between two buildings will generally serve this purpose.

(3) At least one overstory tree shall be planted in every landscape island.

(4) Method of irrigation shall be indicated on the tree protection and/or replacement plan.

(Ord. No. 98-E, § 2.10, 5-6-2021) Sec. 86-61. Tree density requirements.

The site density factor shall be calculated using the total acreage from disturbed areas.

Replacement trees should be distributed throughout the development and not located in only one area.

The quantity of total existing and replacement trees on a site must be sufficient so as to produce a total site density factor of no less than:

(1) Disturbed acreage multiplied by 20 tree density units for single-family residential zoned property.

(2) Disturbed acreage multiplied by 15 tree density units for commercial, mixed use, industrial and all other non-single-family zoned property.

The density may be achieved by counting existing trees to be preserved, planting new trees, or some combination of the two as represented by the following formula:

Site Density Factor (SDF) = Exiting Density Factor (EDF) + Replacement Density Factor

(RDF)

Site Density Factor (SDF): The SDF is calculated by multiplying the disturbed area by the multiplier established in subsections (1) and (2) above based on the zoning of the property and adding any required significant tree recompense.

Existing Density Factor (EDF): The EDF is calculated by converting the diameter of individual trees to remain on the site to tree density units. The density factor conversion table for existing trees is shown in Table A below, "Trees Remaining on Site (Existing)."

Replacement Density Factor (RDF): The RDF is calculated by subtracting the EDF from the SDF. The tree density unit conversion table for replacement (new) trees is shown in Table B below, "Replacement Tree Table".

Trees within buffers. Existing significant trees located within a required zoning buffer area may be included in the existing density factor if the entire CRZ is protected. However, non-significant trees, or significant trees that are not fully protected, may not be counted toward the existing density factor. Existing trees (excluding significant trees located within required zoning buffers) to be retained in order to meet buffer requirements as required in the Unified Development Code will not be considered in the existing density factor.

Replacement trees in required buffer areas may count towards the replacement density factor only under the following circumstances:

(a) Buffer (zoning or state waters) does not have existing tree cover or is sparsely vegetated with trees prior to land disturbance; or

(b) Tree replacement is required by zoning condition(s) that necessitate buffer (zoning or state waters) disturbance for tree installation.

In either circumstance noted above, buffers would remain undisturbed except for replacement tree installation or any disturbance required to comply with a condition of zoning.

EXAMPLE:

1. A commercial site with 7.5 acres of disturbed area and no significant trees removed would result in a site density factor of 112.5 tree density units, calculated as follows:

7.5 acres × 15 tree density units = 112.5 SDF

2. A total of 13 trees will remain on the 7.5-acre site. The tree count is as follows:

7 - 12" diameter pines 3 - 14" diameter pines 3 - 18" diameter oaks

3. Converting diameters (DBH) to tree density units, the EDF is determined below (see Table A):

DBH Units No. of Trees Total 12" 2.4 x 7 16.8 14" 3.3 x 3 9.9 **18" 5.4 x 3 64.8

EDF 91.5

**See division 2, section 86-62, significant trees for explanation of specimen tree credits.

4. The RDF is calculated by subtracting the EDF from the SDF.

RDF = 112.5 - 91.5 = 21

5. A total of 21 replacement tree density units are required.

Table A: Trees to Remain on Site (Existing) Conversion from tree diameter in inches to tree density units for trees remaining on site.

Caliper/Dia. Units 2—4 0.3 5—7 0.9 8—9 1.5 10 1.8 11 2.1 12 2.4 13 2.7 14 3.3 15 3.6 16 4.2 17 4.8 18 5.4 19 6 20 6.6 21 7.2 22 7.8 23 8.7 24 9.3 25 10.2 26 11.1 27 12 28 12.9 29 13.8 Caliper/Dia. Units 30 14.7 31 15.6 32 16.8 33 17.7 34 18.9 35 20.1 36 21.3 37 22.5 38 23.7 39 24.9 40 26.1 41 27.6 42 28.8 43 30.3 44 31.8 45 33 46 34.5 47 36 48 37.8 49 39.3 50 40.8 Table B: Replacement Tree Table Conversion from tree diameter in inches to tree density units for proposed new trees.

Caliper/Dia. Units 2 .5 3 .6 4 .7 5 .9 6 1.0 7 1.2 8 1.3 9 1.5 10 1.7 11 1.9 12 2.1 13 2.3 14 2.5 Note: For the purpose of this article, tree diameters are measured at diameter breast height (DBH) or caliper is measured at ground level for trees having a four-inch caliper or less.

Seven-gallon, or larger, container-grown pine trees will be given a replacement credit of 0.4 units each.

Tree relocation: Replacement units will be granted to trees relocated on site. Tree relocation is subject to approval of the county arborist.

(Ord. No. 98-E, § 2.11, 5-6-2021) Sec. 86-62. Exclusions from tree density acreage.

(a) Areas within public utility easements which contain petroleum, gas, electric transmission easements or major sanitary sewer mains (eight inches or greater), and water mains (16 inches or greater) shall be excluded from the total acreage of the property when calculating the required tree density provided that no proposed improvements (building, parking lots, roadways) are within the easement.

(b) Public athletic field and trails shall be excluded from the disturbed area of the property when calculating the required site density factor calculations.

(c) Building footprint aggregates greater than 30,000 square feet in size that are located in industrial zoning districts shall be excluded from site density factor calculations.

(Ord. No. 98-E, § 2.12, 5-6-2021; Ord. No. 98-F, § 1(Exh. A), 3-3-2022) Sec. 86-63. Additional credits.

(a) Additional tree density units will be granted under the following:

(1) Existing trees to be preserved on slopes greater than ten percent will receive an additional bonus credit of 50 percent of the unit amount as defined in this division.

(2) In major subdivisions, tree groupings connected with a continuous drip line will receive an additional bonus credit of 50 percent of the earned credit when such tree groupings are not located within or adjacent to an identified buffer.

(b) If excess existing density factor (EDF) units remain above and beyond the required site density factor (SDF), these excess units may be applied toward required specimen tree replacement units.

(Ord. No. 98-E, § 2.13, 5-6-2021) Sec. 86-64. Alternative compliance.

Where the minimum density requirements cannot be fully met, due to site conditions, the applicant must have the approval of the director, to contribute to the Tree Replacement Fund of Forsyth County. Such contributions will be used for the sole purpose of planting trees on public property. Contributions to the tree replacement fund must be paid in full prior to the issuance of any permit.

The tree replacement fund is to act as an "emergency relief valve" and is to be utilized at the county's discretion. When it has been determined the required site density factor cannot be met with residual or planted trees, a contribution equal to $750.00 per unit for each unit short of the requirement must be paid into the tree replacement fund by the developer.

For commercial or industrial zoning districts, the applicant may count significant tree replacement unit credit for trees to be planted in the subject property's side or rear buffer, if required as a condition of zoning. The applicant may also request to plant trees within the public right of way or on public property within one mile of the subject property; this method of offsite planting compliance may be allowed at the county's discretion based upon the feasibility of plant material installation on public property within the distance specified above. If off-site planting as described in this section is approved, an indemnification agreement must be executed requiring on-going maintenance of the landscaped area by the applicant and all subsequent owners of the subject property.

(Ord. No. 98-E, § 2.14, 5-6-2021) Sec. 86-65. Maintenance period for development in commercial, mixed use and industrial zoning districts.

Trees used to meet the density requirements, shall be maintained for one full growing season after the date of final inspection. After one full growing season a maintenance inspection will be performed by the county arborist to determine if the project is still in compliance with the tree protection and replacement ordinance. Any trees planted to meet the required site density requirement, which are dead or near death must be replaced. Trees protected to meet the required site density which are dead or near death at the time of the maintenance inspection must be replaced if there is evidence that the demise of such trees was due to an act or omission that caused the tree to deteriorate.

Any trees required to be replaced by this inspection must be planted within 30 days of receipt of notification by the current owner(s). New tree plantings may be postponed for up to six months by posting a performance security (see section 86-101). Failure to plant new trees in accordance with these provisions will constitute a violation of this article and will subject the property owner to civil penalties as set forth in this article.

(Ord. No. 98-E, § 2.15, 5-6-2021) Secs. 86-66—86-80. Reserved.

DIVISION 3. METHODS/TECHNICAL STANDARDS

Sec. 86-81. Construction standards for tree protection devices.

Tree protection devices are necessary to eliminate activities detrimental to trees including but not limited to:

(1) Soil compaction in the critical root zone from heavy equipment, vehicular or excessive pedestrian traffic, or storage of equipment or materials;

(2) Root disturbance due to cuts, fills or trenching;

(3) Wounds to exposed roots, trunks or limbs;

(4) Other activities such as chemical storage, cement truck cleaning, fire, etc.

(a) Location and types of tree protection devices. Tree protection devices are to be installed as shown on the tree protection and/or replacement plan or otherwise completely surrounding the critical root zone of all trees to be preserved. Active protection is required where tree save areas are located in proximity to construction activity. Passive protection may be used in more remote locations and in all tree protection areas not designated as tree save areas as determined by the county arborist. Once tree protection areas are established and approved, any changes are subject to department of planning and community development review.

(b) Materials.

(1) Active tree protection shall consist of chain link, orange laminated plastic, wooden post, rail fencing or other equivalent restraining material (See Detail 3—Active Tree Protection).

(2) Passive protection shall consist of heavy mill plastic flagging of a bright color or equivalent signage on a continuous, durable restraint sufficient to delineate the bounds of any tree protection or save areas (See Detail 2—Passive Tree Protection).

(c) Sequence of installation and removal. All tree protection devices shall be installed prior to any land-disturbing activity. The department of planning and community development will inspect the installation of tree protection devices. It shall be the sole responsibility of the property owner and/or developer to ensure that all tree protection devices remain in functioning condition throughout all phases of development. In the event passive tree protection is not kept in functioning condition, active tree protection may be required throughout the project.

(d) Other specifications.

(1) Where clearing has been approved, trees shall be removed in a manner that does not adversely impact the trees to be preserved. Avoid felling trees into tree protection areas or disturbing roots inside the tree protection areas.

(2) All erosion and sedimentation control measures shall be installed so that sediment will not accumulate within the tree protection areas.

(3) All tree protection areas shall be designated as such with "tree protection area" signs posted visibly on all sides of the fenced-in area. These signs are intended to inform subcontractors of the tree protection process. Signs requesting subcontractor cooperation and compliance with the tree protection standards are recommended for site entrances.

(Ord. No. 98-E, § 3.1, 5-6-2021) Sec. 86-82. Standards for transplanting.

Standards for transplanting shall be in keeping with those established in the International Society of Arboriculture publication, "Tree and Shrub Transplanting Manual" or similar publication. Reference the American Association of Nurserymen publication "American Standard for Nursery Stock" (ANSI Z60,l) for plant material quality specifications.

Reference the "Manual for Woody Landscape Plants" (Michael A. Dirr) or similar publication for information on tree species site requirements.

(a) Tree planting standards.

(1) Always pick a tree up by the container or root ball, never by the trunk.

(2) The hole should be a minimum of one and one-half times the width of the root ball with sloped sides.

(3) The depth of the hole should be no deeper than the height between the bottom of the root ball and the trunk flare.

(4) Once the tree is placed in the hole, the burlap and wire basket must be removed a minimum of 12 inches from the top of the root ball.

(5) Backfill soil should not be amended.

(6) Stake only if necessary.

(Ord. No. 98-E, § 3.2, 5-6-2021) Sec. 86-83. Standards for pruning.

All pruning shall be done in accordance with ANSI A300 (part 1) "Standards for tree care operations - Pruning". Tree topping is not allowed. Crown reduction pruning must be used instead.

(Ord. No. 98-E, § 3.3, 5-6-2021) Sec. 86-84. Standards for tree placement and maintenance.

Proper tree placement and appropriate maintenance are critical components to the establishment and maintenance of healthy trees. The following requirements must be met with respect to plantings conducted pursuant to the requirements of this Ordinance in order to enhance longevity of installed trees as they mature in the landscape so that they may continue to provide environmental and visual benefits.

(a) In order to provide adequate growing area and soil volume for planted trees, the following minimum criteria must be observed unless trees are to be located within parking lot landscape islands or as otherwise approved by the county arborist to improve the viability of the planted trees:

(1) Minimum open soil surface area with average soil depths greater than or equal to three feet:

Overstory trees: 400 square feet.

Understory trees: 100 square feet.

(2) Minimum setbacks from exterior of trunk to buildings:

Overstory trees: 20 feet.

Understory trees: 10 feet.

(3) Minimum setbacks from exterior of trunk to sidewalks, driveways, and other impervious surfaces:

Overstory trees: 8 feet.

Understory trees: 4 feet.

(b) In some situations, certain conditions or constraints, such as but not limited to existing or proposed utilities, infrastructure, streams, wetlands or other environmental factors, may limit the ability of a site to support the minimum number of required trees. The county arborist may approve and/or require alternative planting locations or other means of compliance for fulfilling the planting requirement for any tree required by the tree ordinance, UDC, or other development regulations. Such decisions shall be based on established principles and practices of arboriculture and with consideration to maximizing the tree's health and contribution to the landscape and environment in order to fulfill the purpose and intent of this article.

(c) Plant trees in locations where limbs will not impede access for delivery or emergency vehicles.

(d) Street trees should be pruned to provide at least eight feet of vertical clearance under branches to avoid hazards created by low branches. Prune tree regularly to maintain pedestrian and vehicular clearances and reduce the potential for damage or vandalism.

(e) Use a variety of species to reduce susceptibility to disease.

(f) Consider the use of pervious pavements and soil systems such as silva cells or structural soil to increase soil volumes and moisture penetration

(g) Consider the installation of root barriers along curbs, sidewalks, and tree wells to reduce potential damage to the pavement.

(h) Where possible, locate trees such that conflicts with utilities are minimized, including both underground utilities and overhead power lines.

(i) Consider providing irrigation or methods to provide regular watering to tree planting areas during the plant establishment period to ensure the survival of new trees and improve overall tree health and longevity.

(Ord. No. 98-E, § 3.4, 5-6-2021) Secs. 86-85—86-100. Reserved.

DIVISION 4. ENFORCEMENT PROCEDURES

Sec. 86-101. Performance security.

When planting stock availability is low or weather conditions are not appropriate for planting new trees, the project owner may postpone planting for up to six months, provided that performance security is posted with Forsyth County in accordance with the following criteria:

(a) Security shall be in an approved form submitted to the department of planning and community development with appropriate documentation of stock availability and weather conditions.

(b) Security shall be in an amount equal to 150 percent of the cost of materials, installation, and guarantee, as demonstrated by a signed contract between the owner and a landscape contractor and approval by department of planning and community development.

An inspection shall be made by the department of planning and community development of all tree plantings to assure compliance with plan requirements prior to release of the performance security. Forsyth County will use the performance security at the time of expiration if the planting requirements have not been fulfilled, or if the owner has not requested an extension. Funds received from the performance security will be used to bring the project into compliance. One six-month extension is permitted with documented justification. Any inspections performed after the final inspection (for project release) are subject to re-inspection fee schedules, which shall be maintained on file at the department of planning and community development.

(Ord. No. 98-E, § 4.1, 5-6-2021) Sec. 86-102. Inspection.

The county arborist may periodically inspect the project during the course thereof and shall make a final inspection following the completion of work. Applicants shall cooperate with the department of planning and community development in making such inspections.

The department of planning and community development shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for the purpose of entering at reasonable times upon any property, public or private, for the purpose of investigating and inspecting the sites of any land-disturbing activities.

No person shall refuse entry or access to any authorized county employee who request entry for the purpose of inspection, and who presents appropriate credentials, nor shall any Person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.

Prior to any land-disturbing activity, department of planning and community development must inspect all tree protection devices for compliance with the tree protection and/or replacement plan. Failure to adhere to tree protection and/or replacement plan will subject the project to enforcement procedures found in this article.

Prior to the issuance of a certificate of occupancy, final plat, or other forms of county acceptance, the department of planning and community development shall inspect for compliance with all tree protection and/or replacement ordinance requirements. Any disturbances in tree save areas or deficiencies in the required site density factor will be cited at this time. tree save area deficiencies must be corrected with new tree plantings prior to project release.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:forsyth-county/code/whole@2025-09-18-cdbef3e6e4

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.