Ir al contenido
Georgia Commons
Menú

Grady County · Código de ordenanzas

Part VII - ON-SITE SEWAGE MANAGEMENT SYSTEMS—GENERAL PROVISIONS (REF

Part VII. ON-SITE SEWAGE MANAGEMENT SYSTEMS—GENERAL PROVISIONS (REF

Sobre este texto

  • As published by Municode, current through 2025-02-18
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

290-5-26).

7.01. DHR Chapter 290-5-26 and the Manual for On-Site Sewage Management Systems, defined therein are hereby adopted by reference in their entirety by the Grady County Board of Health, except as noted in [subsection] 7.02 below.

7.02. Minimum Lot Size. Shall conform with the current Manual as of 4-6-1999 or subsequent changes which would require larger lot sizes, excepting that the exclusions in Section M - I.D. and its successors shall be employed when on-site conditions warrant.

7.03. Minimum width of lots at the location of the absorption field shall be one hundred feet (100 feet) for lots with public water and one hundred fifty feet (150 feet) for lots not served by public water.

7.04. On-Site Sewage Management Systems may be utilized for any building or facility not excluded by the Departments current Manual or Memorandum of Understanding between applicable/authorized governing agencies.

7.05. A complete replacement area must be provided for On-Site Sewage Management System replacement, repair, addition or modification. Space reserved for repair, replacement, addition or modification of sewage systems may not be used for building, paving, parking or any other use that would render it unacceptable for its intended purpose.

7.06. Permits must be obtained from the Health Department (Board of Health) in accord with provisions of the Rules and Regulations, Chapter 290-5-26, and On-Site Sewage Management Systems Manual prior to development.

7.07. All On-Site Sewage Systems installed in Grady County must be inspected by and approved by the County Health Department Representative prior to applying final cover and/or use.

7.08. It is the responsibility of the property owner to properly maintain the sewage system in accordance with the Rules and Regulations and recommended guidelines of the Manual.

7.09. Repairs, replacements, additions or modifications to existing systems must be permitted and inspected.

7.10. In conjunction with a repair permit being issued, the septic tank must have been pumped, inspected and found to be acceptable in size and conditions.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:grady-county/code/part-vii@2025-02-18-a6f9d713f0

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Grady County Code of Ordinances, Part VII. ON-SITE SEWAGE MANAGEMENT SYSTEMS—GENERAL PROVISIONS (REF | Georgia Commons