Gwinnett County · Código de ordenanzas
Gwinnett County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-04-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 9 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
contaminated natural waters such as from wells, springs, streams, rivers, bays, harbors, seas, irrigation to canals or systems, etc.; oils, gases, glycerin, paraffins, caustic and acid solutions and other liquid and gaseous fluids used industrially, for other processes, or for firefighting purposes.
Non-potable water means a water supply which has not been approved for human consumption by the
EPD.
Plumbing hazard means an internal or plumbing type cross connection in a customer's potable water system that may be either a pollution or a contamination type hazard. This includes, but is not limited to, cross connections to toilets, sinks, lavatories, wash trays
and lawn sprinkling systems. Plumbing type cross connections can be located in many types of structures, including homes, apartment houses, hotels, and commercial or industrial establishments. Such a connection, if permitted to exist, must be properly protected by an appropriate type of backflow prevention assembly.
Pollution or polluted means the presence of any foreign substance (organic, inorganic or biological) in water which tends to degrade the water's quality so as to constitute a hazard or to impair the usefulness or quality of the water to a degree which does not create an actual hazard to the public health, but which adversely and unreasonably affects such water's domestic use.
Pollution hazard means an actual or potential threat to the physical properties of the water system or to the potability of the public or the customer's potable water system but which would not constitute a health hazard or a system hazard, as defined herein. The maximum degree of intensity of pollution to which the potable water system could be degraded under this definition would cause a nuisance or be aesthetically objectionable or could cause minor damage to the system or its appurtenances.
Potable water means any public potable water supply that has been investigated and approved by the EPD. The system must be operating under a valid
health permit issued by the EPD. In determining what constitutes an approved water supply, the EPD has final judgment as to its safety and potability.
Premises/parcel means any location where there is a water service connection.
Reduced pressure principle backflow prevention assembly means an assembly containing two independently acting approved check valves together with a hydraulically operating, mechanically independent pressure differential relief valve located between the check valves and at the same time below the first check valve.
The unit shall include properly located resilient seated test cocks and tightly closing resilient seated shutoff valves at each end of the assembly. This assembly is designed to protect against a non-health (i.e., pollutant) or a health hazard (i.e., contaminant). This device shall be permitted to be installed where subject to
continuous pressure conditions.
System hazard means an actual or potential threat of severe danger to the physical properties of the public or the customer's potable water system or of a pollution or contamination that would have a protracted effect on the quality of the potable water in the system.
Used water means any water supplied by the county from a public potable water system to a customer's water system after it has passed through the service connection and is no longer under the control of the county water system.
Water purveyor means a supplier of water, including the department, but also includes property owners supplying water for their own use.
Water service connection means the terminal end of a service connection from the public potable water system, (i.e., where the county may lose jurisdiction and sanitary control of the water at its point of delivery to the customer's water system). If a water meter is installed at the end of the service connection, then the water service connection shall mean the downstream end of the water meter. The county's responsibility stops at the terminal end of the water service connections from fire hydrants and all other temporary or emergency water service connections from the county's
potable water system.
(Code 1994, § 114-78; Ord. No. CCC-2010, 9-21-2010) Sec. 106-68. Water system.
This division shall apply to all water delivery facilities that provide potable water to the public for consumption. It is recognized that the county owns some of these facilities and that the customer may own other
of these facilities. The county's system shall consist of all those facilities of the water system used for production, treatment, storage, and delivery of water (including the water meter), to the water service connection at the private premises/parcel. The customer's system shall
include those parts of the facilities beyond the termination of the county's system that are used in conveying potable water delivered by the department to customers (including any required backflow prevention devices used in conjunction therewith).
(Code 1994, § 114-79; Ord. No. CCC-2010, 9-21-2010) Sec. 106-69. Backflow prevention required.
(a) The department shall not allow, install or maintain any water service connection to the county's potable water system to any premises/parcel unless the county's potable water system is protected from potential backflow and cross connection as required by the laws
of the state, the rules of the state environmental protection division, the state plumbing code and this division. An approved backflow prevention assembly shall be installed on each service line to a customer's system
immediately downstream of the water meter or as close as physically feasible to the water meter. No backflow prevention assembly other than as specified in this section shall be allowed, installed or maintained without the express written approval of the director.
(b) If, in the judgment of the director, an approved backflow prevention assembly is required at either the customer's water service connection or within the customer's private water system for the safety of the county's system, the director shall give written notice to said customer to install such an approved backflow prevention assembly(s) at a specific location(s) on his premises. The director's judgment shall be based on the rules and on all policies that the county may adopt to implement this division.
(c) Within 30 days after receipt of written notice from the director that backflow prevention assemblies are required, a customer shall have such approved protection or assemblies installed and tested by a certified backflow prevention assembly tester at the customer's
sole expense.
(d) In all cases, a backflow prevention assembly shall be installed before the first branch line leading off the service line wherever the following conditions exist:
(1) In the case of premises having an auxiliary water supply which is not or may not be of safe/potable bacteriological or chemical quality and which is not acceptable as an additional source by the department, the public water system shall be protected against
backflow from the premises by installing an approved air gap or an approved reduced pressure principle backflow prevention assembly in the service line commensurate with the degree of hazard as determined by the department.
(2) In the case of premises on which any industrial fluids or any other objectionable substances are handled in such a fashion as to create an actual or potential hazard to the county's potable water system, the county's potable water system shall be protected against backflow
from the premises/parcel by installing an approved backflow prevention assembly in the service line commensurate with the degree of
hazard as determined by the department. This shall include the handling of process waters and waters originating from the county's potable water system which may have been subject to deterioration in quality.
(3) In the case of any premises/parcel having internal cross connections that cannot be permanently corrected or protected against, or intricate plumbing and piping arrangements or where entry to all portions of the premises is
not readily accessible for inspection purposes, making it impracticable or impossible to ascertain whether or not dangerous cross connections exist, the county's potable water system shall be protected against backflow from the
premises/parcel by installing an approved reduced pressure principle backflow prevention assembly in the service line.
(4) In the case of any premises/parcel where there is pollution or polluted water that would be objectionable but not hazardous to health, if introduced into the county's potable water system, the county's potable water system shall be protected by an approved reduced pressure
principle backflow prevention assembly.
(5) In the case of any premises/parcel where there is any contamination which is handled in such a fashion as to create an actual or potential hazard to the county's potable water system, the county's potable water system shall be protected by an approved air gap or an approved reduced pressure principle backflow prevention assembly. Examples of premises where these conditions will exist include sewage treatment plants, sewage pumping stations, chemical manufacturing plants, hospitals, mortuaries and plating plants, etc.
(6) In the case of any premises/parcel where there are actual or potential unprotected cross connections, the county's potable water system shall be protected by an approved reduced
pressure principle backflow prevention assembly at the water service connection.
(7) In the case of any premises/parcel where, because of security requirements or other prohibitions or restrictions, it is impossible or impractical to make a complete in-plant cross connection survey, the county's potable water
system shall be protected against backflow from the premises by either an approved air gap or an approved reduced pressure principle backflow prevention assembly on each water service connection to the premises/parcel.
(8) Reduced pressure principal backflow prevention assemblies shall not be installed in any location subject to possible flooding.
(Code 1994, § 114-80; Ord. No. CCC-2010, 9-21-2010) Sec. 106-70. Authority to discontinue service.
The director may discontinue domestic water service to any premises/parcel when a backflow prevention assembly required by this division is not installed, tested or maintained. The director may also discontinue domestic water service for failure, refusal, or inability on the part of the customer to install, have tested or
maintained said assembly, or for removal or bypass of said assembly or if an unprotected cross connection exists on the premises. The director shall not allow domestic water service to be restored until such conditions or defects are corrected.
(Code 1994, § 114-81; Ord. No. CCC-2010, 9-21-2010) Sec. 106-71. Inspection of customer's system.
The director shall have the right at any reasonable time to enter the customer's premises/parcel and to inspect the piping system or systems thereof for cross connections and for compliance with this division and the county's backflow prevention policy, unless conditions exist as described in section 106-69(d)(7). The customer's system shall be open for inspection at all
reasonable times to authorized representatives of the department to determine whether unprotected cross connections or other structural or sanitary hazards, including violations of this division, exist. When such a condition becomes known, the department shall deny or immediately discontinue service to the premises/ parcel by providing for a physical break in the service line until the customer has corrected the condition(s) in conformance with the state statutes, regulations and codes relating to plumbing and water supplies and the regulations adopted pursuant thereto.
(Code 1994, § 114-82; Ord. No. CCC-2010, 9-21-2010) Sec. 106-72. Department approval required.
Any backflow prevention assembly required herein shall be a make, model and size approved by the department. The EPD and the department have approved the following testing laboratory to test and approve backflow
prevention assemblies:
Foundation for Cross Connection Control and Hydraulic Research University of Southern California KAP-200 University Park MC-2531 Los Angeles, California 90089-2531 (Code 1994, § 114-83; Ord. No. CCC-2010, 9-21-2010) Sec. 106-73. Field test, repair and replacement required.
(a) It shall be the duty of the customer at any premises/parcel where backflow prevention assemblies are installed to have a field test performed by a certified backflow prevention assembly tester upon installation and at least once per year thereafter.
(b) The customer may request the department to perform any required test or may, at its sole expense, contract for such tests with a certified backflow prevention assembly tester approved by the department.
(c) In those instances where the director deems the hazard to be great enough, he may require field tests at more frequent intervals.
(d) All tests required pursuant to this section shall be at the expense of the customer and shall be performed by the department at the customer's request or by a certified backflow prevention assembly tester approved by the department.
(e) When the department performs required tests at the customer's request, it may charge the customer a backflow administrative fee on the customer's water bill in an amount not greater than the cost of performing such tests.
(f) The customer shall have the right to hire a certified backflow prevention assembly tester approved by the department to perform additional such tests at its
sole expense, but shall not be entitled to a refund of the backflow administrative fee.
(g) The director shall see that these tests are made in a timely manner.
(h) The customer shall repair, overhaul or replace defective assemblies at their expense.
(i) Records of such tests, repairs and overhauls shall be kept and made available to the director upon request.
(j) The director will require that any prevention assemblies that fail the field test are repaired or replaced within 30 days.
(Code 1994, § 114-84; Ord. No. CCC-2010, 9-21-2010) Sec. 106-74. Existing approved assemblies may remain.
(a) Backflow prevention assemblies that do not meet the requirements of this division but which were approved by the testing laboratory identified in section 106-72 and were installed before or on the effective date
of the ordinance from which this division is derived may, in the discretion of the director, remain so long as the director is assured that said assemblies will satisfactorily protect the county's potable water system. The customer shall be required to establish to the director's
satisfaction that any such backflow prevention assembly has been properly maintained. The customer may request the director to test an existing approved backflow
prevention assembly at the customer's sole expense.
(b) The inspection and testing requirements established in sections 106-71 and 106-73 shall apply to any such backflow prevention assemblies. Whenever the
existing device is moved from the present location or requires more than the minimum maintenance or when the director finds that the maintenance constitutes a hazard to public health, the unit shall be replaced by an approved backflow prevention assembly meeting the requirements of this division.
(Code 1994, § 114-85; Ord. No. CCC-2010, 9-21-2010) Sec. 106-75. Authority to implement.
The director is authorized to make all necessary and reasonable rules and policies with respect to the enforcement of this division, including, but not limited to, the authority to establish and revise all administrative, labor and material charges for services rendered and commodities provided in accordance with this division.
All such rules and policies shall be consistent with the provisions of this division and shall be effective 30 days after being filed with the department.
(Code 1994, § 114-86; Ord. No. CCC-2010, 9-21-2010) Sec. 106-76. Authority to install, test and maintain backflow.
If a customer refuses to install or repair such backflow prevention devices as may be required by this division, the director shall either discontinue water service to the customer's premises/parcel or, in lieu of discontinuing water service, the director is authorized to install or repair such devices and to bill said customer for the costs incurred by the department in such installation or repair. If a customer refuses to install backflow preventers as required by this division, the director shall give said customer 90 days written notice that the department will install approved backflow prevention devices and bill the customer for the costs incurred or discontinue said customer's water service.
(Code 1994, § 114-87; Ord. No. CCC-2010, 9-21-2010) Secs. 106-77—106-95. Reserved.
ARTICLE III. SEWER SERVICE
DIVISION 1. GENERALLY
Sec. 106-96. Use of public sewers and maintenance of private sewer lines.
(a) Unlawful waste placement. It shall be unlawful for any person to place, deposit or permit to be deposited in any unsanitary manner on public or private property within the county or in any area under the
jurisdiction of the county any human or animal excrement, garbage, or other objectionable waste. It shall be unlawful to discharge to any natural outlet within the
county, or in any area under the jurisdiction of the county, any sewage or other polluted waters, except where suitable treatment has been provided in accordance with subsequent provisions of this chapter. Except as hereinafter provided, it shall be unlawful to construct or maintain any privy, vault, septic tank,
cesspool or other facility intended or used for the disposal of sewage.
(b) Other requirements. The owner of each house, building or property used for human occupancy, employment, recreation or other purposes, abutting on any street, alley or right-of-way in which there is now
located or may in the future be located a public sanitary sewer of the county, is hereby required at his expense to install suitable toilet facilities therein, and to connect the facilities directly into the county wastewater system in accordance with county regulations within 90 days after date of official notice to do so, provided that a public sewer is within 200 feet of an inhabitable structure on the owner's property.
(1) The director may grant temporary written exceptions to this requirement, if the county health department concurs in writing.
(2) The county planning and development department may preclude connection to the POTW in certain zones of the county, regardless of a
property's proximity to sewer, based upon unified plan criteria and policies.
(c) Maintenance of private sewers. All sewer users, including all residential sewer users, are required to maintain building sewers and other private sewer lines and laterals in good condition. Such private sewers shall be maintained to prevent infiltration and inflow of surface water and/or groundwater. Failure to so maintain building sewers and other private sewer lines may result in enforcement, including, but not limited to, cease and desist orders and administrative fines of up to $1,000.00 per day.
(d) Permanent easement restrictions.Permanent easements for sewer facilities are for the county to install, inspect, observe, measure, sample, repair, protect, maintain and operate any portion of the sewer facilities lying within such easement. It is essential that access to
the easement not be obstructed. Although the property owner owns the underlying fee simple title to the land within the easement area subject to the easement rights, all construction, digging, grubbing, clearing, filling, or other earth moving or construction activities by the owner in the permanent easement area are prohibited without prior permission from the DWR director or his representative. Permanent structures shall not be permitted within the easement or easement setback. In addition, nonstructural improvements on easements such as walkways and landscaping are subject to removal at the owner's risk. The county shall not be responsible for replacing anything within the easement
that must be removed to access, install, inspect, observe, measure, sample, repair, protect, maintain and operate the facilities.
(Code 1994, § 114-88; Ord. No. SWR-2010-001, 11-16- 2010) Sec. 106-97. Private wastewater disposal.
(a) Sewer not available. Where a public sanitary sewer is not available under the provisions of section 106-96(b), the building sewer shall be connected to a private individual on-site sewage disposal system complying with the provisions of this section.
(b) Approval by environmental health department.
Before an individual on-site sewage disposal system is installed, the owner must first obtain approval from the county health department or other agency having legal jurisdiction.
(c) Communal on-site sewage disposal prohibited. Privately financed wastewater disposal plants or septic tanks serving more than one residence or more than
one property are prohibited. If a property does not use an individual on-site sewage disposal system, it must be connected to a sewer leading to the POTW.
(d) Septic tank leach fields. The type, capacity, location, and layout of individual on-site sewage disposal systems shall comply with the requirements of all local
state and federal agencies, including, but not limited to, stream buffer setbacks. All septic tank and leach field systems or individual on-site alternative systems must have the approval of the county health department. No septic tank system shall be permitted to discharge to any natural outlet or receiving stream.
(e) Maintenance of individual disposal systems, septic tanks, and leach fields. The owner of a private wastewater disposal facility and/or a septic tank leach field system shall operate and maintain the private wastewater disposal facility in a sanitary manner at all times at no expense to the county and in such manner that a
nuisance is not created. The county may by resolution require septic tank pumping on a specified interval for parts or all of the unincorporated area.
(f) Public sewer connection. At the written instruction of the county health department or by the director, a connection to the public sewer shall be made within
90 days at the property owner's expense, and the individual on-site disposal system abandoned according to health department requirements. Failure to connect to
public sewer within the allotted time may result in a termination of water service.
(g) Public sewer availability. At such time as a public sewer becomes available to a property served by a private wastewater disposal system, as provided in subsection (f) of this section, a direct connection shall be made to the public sewer within 90 days in compliance
with this article, and any septic tanks, cesspools, and similar private wastewater disposal facilities shall be cleaned of sludge and filled with suitable material.
(h) Safety. All excavations and operation areas for privately financed wastewater disposal systems shall be adequately guarded with barricades and lights so as to protect the public from hazard.
(Code 1994, § 114-89; Ord. No. SWR-2010-001, 11-16- 2010) Sec. 106-98. Sewer construction standards.
(a) General. All extensions of the sewer system shall be designed and built in accordance with current DWR standards. The standards shall be those stated in the latest edition of "Sanitary Sewer Installation Regulations and Specifications for Gwinnett County" (DWRSSS), which is available at DWR and at the
department of planning and development. No installation of pipe or other materials for sewer extensions shall be allowed until the required information is received and the design is approved by the county. Inspection and acceptance procedures shall be specified in these standards.
(b) Prohibitions. No building sewers shall be connected to a sanitary sewer until as-built drawings are received and until the extension has been inspected,
tested, and accepted in writing for county operation and maintenance. Flow from sewer extensions into the existing sanitary sewer system is prohibited until asbuilt drawings are received and until the extension has been inspected, tested, and accepted in writing for
county operation and maintenance. Groundwater, rainwater, mud, gravel, and debris shall be kept out of the sanitary sewer system at all times, including during
construction.
(c) Other regulations. Design and construction of sanitary sewer extension shall comply with all local, state, and federal rules and regulations pertaining to sewer installation, including, but not limited to, rules and regulations for safety, erosion and sediment control, stream buffer protection, wetlands, and water quality standards.
(d) Authority. The board of commissioners hereby approves the existing sanitary sewer installation regulations and specifications for the county adopted by the director of the department of water resources on December 14, 2010, but no further proposed regulations and specifications enacted after that date. The director
of the department of water resources shall deliver a certified copy of the existing sanitary sewer installation regulations and specifications for the county hereby adopted to the county clerk for recording in the county's minutes. The director of the department of water resources may recommend future revisions to the sanitary sewer installation regulations and specifications for the county. All such recommendations shall be
presented to the county water and sewerage authority for review and recommendation prior to submission to the board of commissioners for final action. The board of commissioners shall take action to approve, amend, or deny the recommendation. Any such revision shall specify its effective date.
(e) Enforcement. Failure to comply with the provisions of this section may result in enforcement and fines as described in this article.
(Code 1994, § 114-90; Ord. No. SWR-2010-001, 11-16- 2010; Ord. No. GCID 2014-1154, 11-4-2014) Secs. 106-99—106-124. Reserved.
DIVISION 2. PRETREATMENT*
Sec. 106-125. General provisions and definitions.
(a) Purpose and policy.
(1) This division sets forth uniform requirements for users of the county's publicly owned treatment works (POTW) and enables the county to comply with all applicable state and federal
laws, including the Clean Water Act (33 USC 1251 et seq.), the General Pretreatment Regulations (40 CFR Part 403), and the Rules of Georgia Department of Natural Resources
(Rule 391-3-6-.08). This division shall apply to all users of the POTW. This division authorizes the issuance of individual wastewater discharge permits or general permits; provides for monitoring, compliance, and enforcement
activities; establishes administrative review procedures; requires user reporting; and provides for the setting of fees for the equitable distribution of costs resulting from the program established herein.
(2) The objectives of this division are to:
a. Prevent the introduction of pollutants into the POTW that will interfere with its operation;
b. Prevent the introduction of pollutants into the POTW that will pass through the POTW, inadequately treated, into receiving waters, or otherwise be incompatible with the POTW;
c. Protect both POTW personnel, who may be affected by wastewater and sludge in the course of their employment, and the general public;
d. Promote reuse and recycling of treated industrial wastewater and sludge from the POTW;
e. Provide for fees for the equitable distribution of the cost of operation, maintenance, administration, and improvement of the POTW and the industrial pretreatment program;
f. Enable the county to comply with its national pollutant discharge elimination system permit conditions, sludge use and disposal requirements, and any other federal or state laws to which the POTW is subject; and
g. Aid in preventing the introduction and accumulation of fats, oils and grease into the POTW, which will or tend to cause or contribute to sanitary sewer blockages and obstructions. Food service establishments and other industrial or commercial establishments generating wastewater containing fats, oils and grease are subject to this division. This division regulates such users by requiring that grease interceptors and other approved strategies be installed, implemented, and maintained in accordance with the provisions hereof.
(b) Administration. Except as otherwise provided herein, the director of water resources (director) shall administer, implement, and enforce the provisions of this division. Any powers granted to or duties imposed upon the director may be delegated by the director to a duly authorized county department of water resources employee.
(c) Applicability. This division shall apply to all persons located inside or outside the sewer service area who are users of the POTW, including jurisdictions
served by agreement with the county.
(d) Common abbreviations. The following abbreviations, when used in this division, shall have the designated meanings:
BOD5—Biochemical oxygen demand.
BMP—Best management practice.
BMR—Baseline monitoring report.
CFR—Code of Federal Regulations.
CIU—Categorical industrial users.
DWR—County department of water resources.
DWRSSS—County department of water resources sanitary sewer standards.
EPA—U.S. Environmental Protection Agency.
EPD—State environmental protection division.
FOG—Fats, oils and grease.
gpd—Gallons per day.
IU—Industrial user.
mg/l—Milligrams per liter.
NOV—Notice of violation.
NPDES—National pollutant discharge elimination system.
O&M—Operations and maintenance.
O.C.G.A.—The Official Code of Georgia Annotated.
POTW—Publicly owned treatment works.
RCRA—Resource Conservation and Recovery Act.
SIU—Significant industrial user.
SNC—Significant noncompliance.
TKN—Total Kjeldahl Nitrogen TSS—Total suspended solids.
USC—United States Code.
(e) Definitions. The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:
Act or Federal Act means the Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 USC 1251 et seq.
Ammonia nitrogen (NH3 -N) means a colorless gaseous alkaline compound of nitrogen and hydrogen that is soluble in water, measured as nitrogen.
Approval authority means the environmental protection division of the state department of natural resources, or EPD.
Authorized or duly authorized representative of the user.
(1) If the user is a corporation:
a. The president, secretary, treasurer, or a vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or
b. The manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility, including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long-term environmental compliance with environmental laws and
regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate
information for individual wastewater discharge permit or general permit requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) If the user is a partnership or sole proprietorship: a general partner or proprietor, respectively.
(3) If the user is a federal, state, or local governmental facility: a director or highest official appointed or designated to oversee the operation and performance of the activities of the government facility, or their designee.
(4) The individuals described in subsections (1) through (3) of this definition may designate a duly authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the
overall operation of the facility from which the discharge originates or having overall responsibility for environmental matters for the company, and the written authorization is submitted to the director.
Best management practices (BMPs) means schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to meet the general sewer use requirements listed in Sec.
106-126 of this division. BMPs include treatment requirements, operating procedures, and practices to control plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw materials storage.
Biochemical oxygen demand (BOD5) means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedures
for five days at 20 degrees centigrade.
Building sewer means a privately owned and maintained sewer conveying wastewater from the premises of the user to the POTW.
Bypass means the intentional diversion of waste streams from any portion of a user's treatment facility.
Categorical industrial user (CIU) means an industrial user subject to a categorical pretreatment standard or categorical standard. All CIUs are hereby classified as SIUs.
Categorical pretreatment standard or categorical standard means any regulation containing pollutant discharge limits promulgated by EPA in accordance with sections 307(b) and (c) of the Act (33 USC 1317) that
apply to a specific category of users and that appear in 40 CFR Chapter I, Subchapter N, Parts 405—471.
Chemical oxygen demand (COD) means a measure of the oxygen required to oxidize all compounds, both organic and inorganic, in water.
Daily maximum means the arithmetic average of all effluent samples for a pollutant collected during a 24- hour period.
Daily maximum limit means the maximum allowable discharge limit of a pollutant during a 24-hour period. Where daily maximum limits are expressed in
units of mass, the daily discharge is the total mass discharged over the course of the 24-hour period.Where daily maximum limits are expressed in terms of a concentration, the daily discharge is the arithmetic or the flow-weighted average measurement of the pollutant
concentration derived from all measurements taken during that 24-hour period.
Director of water resources or director means the person designated by the county to supervise the operation of the POTW, and who is charged with certain duties and responsibilities by this division. The term
"director of water resources" also means a duly authorized representative of the director of water resources.
Environmental protection agency (EPA) means the U.S. Environmental Protection Agency or, where appropriate, the regional water management division director, the regional administrator, or other duly authorized official of said agency.
Existing source means any source of discharge that is not a new source.
Fats, oils and grease (FOG) means polar fats, oils and grease as determined using EPA method 1664A specified at 40 CFR 136.3. Polar FOG concentration is the difference in HEM and SGT-HEM results analyzed by method 1664A.
Food service establishment means establishments for the preparation or serving of meals, lunches, short orders, sandwiches, frozen desserts, or other edible products. The term "food service establishment" includes, but is not limited to, restaurants; coffee shops; cafeterias; short order cafes; luncheonettes; taverns; lunch rooms; places manufacturing, wholesaling, or retailing
sandwiches, salads or other fast foods; soda fountains;
institutions, both public and private; food carts; itinerant restaurants; industrial cafeterias; catering establishments; food vending machines and vehicles and operations connected therewith; and similar facilities by whatever name called.
Grab sample means a sample that is taken from a waste stream without regard to the flow in the waste stream and over a period of time not to exceed 15 minutes.
Grease trap means a device in which the grease content of non-sanitary sewage is intercepted and congealed, and from which grease is removed for proper disposal. The terms "grease trap" and "grease interceptor" shall be interchangeable.
Gwinnett County or county means the County of Gwinnett, Georgia, the Gwinnett County Board of Commissioners and/or their designee acting on their behalf.
Holding tank waste means any waste or wastewater from holding tanks such as vessels, chemical toilets, campers, trailers, septic tanks, and vacuum pump trucks used to store, treat or transport waste or wastewater.
Indirect discharge or discharge means the introduction of pollutants into the POTW from any nondomestic source.
Industrial user (IU) means a source of indirect discharge.
Instantaneous limit means the maximum concentration of a pollutant allowed to be discharged at any time, determined from the analysis of any discrete or
composite sample collected, independent of the industrial flow rate and the duration of the sampling event.
Interference means a discharge that, alone or in conjunction with a discharge or discharges from other sources, inhibits or disrupts the POTW, its treatment processes or operations or its sludge processes, use or disposal; and, therefore, is a cause of a violation of any requirement of the county's NPDES permit or of the prevention of sewage sludge use or disposal in compliance with any of the following statutory/regulatory provisions or permits issued thereunder, or any more
stringent state or local regulations: section 405 of the Act; the Solid Waste Disposal Act, including title II commonly referred to as the Resource Conservation and Recovery Act (RCRA); any State regulations contained in any state sludge management plan prepared pursuant to subtitle D of the Solid Waste Disposal Act;
the Clean Air Act; the Toxic Substances Control Act;
and the Marine Protection, Research, and Sanctuaries Act.
Limitation or limit means any restriction or prohibition established under the Federal Act, the State Act, or pursuant to this division on quantities, rates, and
concentrations, or a combination thereof, of chemical, physical, biological, or other constituents which are discharged from users into the POTW and then into the waters of the state, including, but not limited to, schedules of compliance.
Local limit means specific discharge limits or BMPs developed and enforced by the director upon industrial or commercial facilities to meet the general sewer use requirements listed in Sec. 106-126 of this division and the Rules of the Georgia Department of Natural Resources.
Metered water means the amount of all sources of water, including wells, used by the sewer customer.
Monthly average means the sum of all daily measurements taken during a calendar month divided by the number of daily measurements taken during that month.
Monthly average calculations shall include the values of all samples taken during the month, whether sampled and analyzed by the user or sampled and analyzed by DWR employee.
Monthly average limit means the highest allowable average of daily measurements taken over a calendar month, calculated as the sum of all daily measurements taken during a calendar month divided by the number of daily measurements taken during that month. For concentration-based limitations, the monthly average shall be the average of all daily concentrations during a calendar month. For mass-based limitations, the monthly average shall be the average of all daily concentrations multiplied by the monthly average flow for that month and the appropriate conversion factor.
New source.
(1) Any building, structure, facility, or installation from which there is (or may be) a discharge of pollutants, the construction of which commenced after the publication of proposed pretreatment standards under section 307(c) of the Act that will be applicable to such source if
such standards are thereafter promulgated in accordance with that section, provided that:
a. The building, structure, facility, or installation is constructed at a site at which no other source is located;
b. The building, structure, facility, or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source;
or
c. The production or wastewater generating processes of the building, structure, facility, or installation are substantially
independent of an existing source at the same site. In determining whether these are substantially independent, factors such as the extent to which the new facility is integrated with the existing plant, and the extent to which the new facility
is engaged in the same general type of activity as the existing source, should be considered.
(2) Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility, or installation meeting the criteria of subsection (1)b or c of this definition, but otherwise alters, replaces, or adds to existing process or production equipment.
(3) Construction of a new source as defined under this subsection has commenced if the owner or operator has:
a. Begun, or caused to begin, as part of a continuous on-site construction program, either of the following actions: any placement, assembly, or installation of facilities or equipment; or significant site preparation work, including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or
equipment; or
b. Entered into a binding contractual obligation for the purchase of facilities or equipment which are intended to be used
in its operation within a reasonable time.
Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation
under this subsection.
Non-significant industrial user. A non-significant IU is one which does not meet the definition of a significant industrial user. Non-significant IUs may be issued an individual wastewater discharge permit or a general
permit at the director's sole discretion.
Noncontact cooling water means water used for cooling that does not come into direct contact with any raw material, intermediate product, waste product, or finished product.
Pass throughmeans a discharge which exits the POTW into waters of the United States in quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the county's NPDES
permit, including an increase in the magnitude or duration of a violation.
Permit or pretreatment permit means any permit issued by the director to regulate the discharge of pollutants from any user into the POTW and thence to the waters of the state. Permits may be individual wastewater discharge permits or general permits.
Person means any individual, partnership, copartnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or
any other legal entity; or their legal representatives, agents, or assigns. This definition includes all federal, state, and local governmental entities.
pH means a measure of the acidity or alkalinity of a solution, expressed in standard units.
Pollutant means dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage sludge, munitions, medical wastes, chemical wastes,
biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, municipal, agricultural and industrial wastes, and certain characteristics of wastewater (including, but not limited to, pH, temperature, TSS, turbidity, color, NH3 -N,
TKN, BOD5
, COD, toxicity, or odor).
Pretreatment means the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater prior to, or in lieu of, introducing such pollutants into
the POTW. This reduction or alteration can be obtained by physical, chemical, or biological processes;
by process changes; or by other means, except by dilution as prohibited by Sec. 106-126(f) of this division and 40 CFR 403.6(d). Appropriate pretreatment technology includes control equipment, such as equalization tanks or facilities, for protection against surges or slug loadings that might interfere with or otherwise be
incompatible with the POTW. However, where wastewater from a regulated process is mixed in an equalization facility with unregulated wastewater or with wastewater from another regulated process, the effluent from the equalization facility shall meet an adjusted pretreatment limit calculated in accordance with 40 CFR 403.6(e).
Pretreatment requirements means any substantive or procedural requirement related to pretreatment imposed on a user, other than a pretreatment standard.
Pretreatment standards or standards means prohibited discharge standards, categorical pretreatment standards, and local limits.
Prohibited discharge standards or prohibited discharges means absolute prohibitions against the discharge of certain substances.
Publicly owned treatment works (POTW) means a treatment works, as defined by section 212 of the Act (33 USC 1292), which is owned by the county. This definition includes any devices or systems used in the collection, storage, treatment, recycling, and reclamation of sewage or industrial wastes of a liquid nature, and any conveyances which convey wastewater to a
treatment plant. The term "publicly owned treatment works" also means the county, as defined in section 502(4) of the Act, which has jurisdiction over the indirect discharges to, and the discharges from, the POTW.
Septage means waste removed from septic tanks, portable toilets, or chemical toilets.
Septic tank waste means any sewage from holding tanks such as vessels, chemical toilets, campers, trailers, and septic tanks.
Sewage means human excrement and gray water.
Gray water includes household showers, dishwashing operations, etc.
Sewer meter means device approved by the director for the purpose of establishing the quantity of wastewater discharged by a user.
Significant industrial user (SIU). A significant industrial user is:
(1) An IU subject to categorical pretreatment standards (a CIU), including IUs regulated under 40 CFR 403.6 and 40 CFR Chapter I,
Subchapter N; or
(2) An IU that:
a. Discharges an average of 25,000 gpd or more of process wastewater to the POTW (excluding sanitary, noncontact cooling, and boiler blowdown wastewater);
b. Contributes a process waste stream which makes up five percent or more of the average dry weather hydraulic or organic capacity of the POTW treatment plant;
or
c. Is designated as such by the director on the basis that it has a reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement.
Significant noncompliance (SNC). Significant noncompliance for an IU means that its violation meets one or more of the following criteria:
(1) Chronic violations of wastewater discharge limits, defined here as those in which 66 percent or more of all of the measurements taken for the same pollutant parameter during a
six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits, as defined in this division;
(2) Technical review criteria (TRC) violations, defined here as those in which 33 percent or more of all of the measurements taken for the same
pollutant parameter during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement, including instantaneous limits, as defined in
this division, and the applicable TRC. The TRCs are 1.4 for BOD, TSS, FOG, NH3 -N, TKN, Phosphorus and 1.2 for all other pollutants except pH;
(3) Any other violation of a pretreatment standard or requirement as defined in this division (daily maximum, long-term average, instantaneous limit, or narrative standard) that the director determines has caused, alone or in
combination with other discharges, interference or pass through (including endangering the health of POTW personnel or the general
public);
(4) Any discharge of a pollutant that has caused imminent endangerment to public health, safety, welfare, or to the environment, or has resulted in the director's exercise of its emergency authority to halt or prevent such a discharge;
(5) Failure to meet, within 90 days after the schedule date, a compliance schedule milestone contained in an individual wastewater discharge permit or a general permit or enforcement
order for starting construction, completing construction or attaining final compliance;
(6) Failure to provide, within 45 days after the due date, required reports such as baseline monitoring reports, 90-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules;
(7) Failure to accurately report noncompliance;
or
(8) Any other violations or group of violations, which may include a violation of BMPs, which the director determines will adversely affect POTW operations or violate applicableNPDES permit effluent limitations and requirements.
Slug load or slug discharge means any discharge at a flow rate or concentration, which could cause a violation of the general sewer use requirements listed in Sec.
106-126 of this division. A slug discharge is any discharge of a non-routine, episodic nature, including, but not limited to, an accidental spill or a non-customary
batch discharge, which has a reasonable potential to cause interference or pass through, or in any other way violate applicable state and federal laws, rules, regulations, local limits, or NPDES permit conditions.
State Act means the Georgia Water Quality Control Act (O.C.G.A. § 12-5-20 et seq.).
Stormwater means any flow occurring during or following any form of natural precipitation, and resulting from such precipitation, including snowmelt. Total Kjeldahl Nitrogen (TKN) means the total concentration of organic nitrogen and ammonia nitrogen (NH3 -
N).
Total suspended solids or suspended solids (TSS) means the total suspended matter that floats on the surface of, or is suspended in, water, wastewater, or other liquid, and that is removable by laboratory filtering.
User means a source of indirect discharge.
Wastewater means liquid and water-carried industrial wastes and sewage from residential dwellings, commercial buildings, industrial and manufacturing facilities, and institutions, whether treated or untreated, which are contributed to the POTW.
Wastewater treatment plant ortreatment plant means that portion of the POTW which is designed to provide treatment of municipal sewage and industrial waste.
Zero discharge permit means a permit issued to an IU, which may include CIUs, and which prohibits the discharge of industrial process wastewater to the POTW.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-126. General sewer use requirements.
(a) Prohibited discharge standards.
(1) General prohibitions. No user shall introduce or cause to be introduced into the POTW any pollutant or wastewater which causes pass through or interference. These general prohibitions apply to all users of the POTW whether or not they are subject to categorical pretreatment standards or any other national, state, or local pretreatment standards or requirements.
(2) Specific prohibitions.
a. No user shall introduce or cause to be introduced into the POTW the following pollutants, substances, or wastewater:
1. Pollutants which create a fire or explosive hazard in the POTW, including, but not limited to, waste streams with a closed-cup flashpoint of less than 140 degrees Fahrenheit (60 degrees centigrade) using the test methods specified at
40 CFR 261.21;
2. Wastewater having a pH less than
5.0 or more than 12.5, or otherwise causing corrosive structural damage to the POTW or equipment;
3. Solid or viscous substances in amounts which will cause obstruc- tion of the flow in the POTW resulting in interference, but in no case solids greater than three inches in any dimension;
4. Pollutants, including oxygen-demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration which, either singly or by interaction with other pollutants, will cause interference with the POTW or which could interfere with wastewater conveyance;
5. Wastewater having a temperature greater than 140 degrees Fahrenheit (60 degrees centigrade), or which will inhibit biological activity in the treatment plant resulting in interference, but in no case wastewater which causes the temperature at the introduction into the treatment plant to exceed 104 degrees Fahrenheit (40 degrees centigrade);
6. Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin, in amounts that will cause interference or pass through;
7. Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity
that may cause acute worker health and safety problems;
8. Trucked or hauled pollutants, except at discharge points designated by the director;
9. Noxious or malodorous liquids, gases, solids, or other wastewater which, either singly or by interaction with other wastes, are sufficient to create a public nuisance or a hazard to life, or to prevent entry
into the sewers for maintenance or repair;
10. Wastewater containing any radioactive wastes or isotopes except in compliance with applicable state or federal regulations;
11. Stormwater, surface water, groundwater, roof runoff, subsurface drainage, swimming pool drainage, condensate, unless specifically authorized by the director;
12. Sludges, screenings, or other residues from the pretreatment of industrial wastes;
13. Wastewater causing, alone or in conjunction with other sources, the treatment plant's effluent to fail a toxicity test;
14. Detergents, surface-active agents, or other substances which might cause excessive foaming in the
POTW;
15. FOG in concentrations greater than 150 mg/l in any instantaneous sample;
16. Wastewater causing two readings on an explosion hazard meter at the point of discharge into the POTW, or at any point in the POTW, of more than five percent or any single reading over ten percent of the lower explosive limit of the meter;
b. Pollutants, substances, or wastewater prohibited by this section shall not be processed or stored in such a manner that they could be discharged to the POTW.
(b) National categorical pretreatment standards. Users shall comply with the categorical pretreatment standards as specified in 40 CFR 403.6 and 40 CFR Chapter I, Subchapter N, Parts 405-471.
(1) When the limits in a categorical pretreatment standard are expressed only in terms of mass of pollutant per unit of production, the director may convert the limits to equivalent limitations expressed either as mass of pollutant discharged per day or effluent concentration
for purposes of calculating effluent limitations applicable to individual IUs.
(2) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the director shall impose an alternate limit in accordance with 40 CFR 403.6(e).
(c) State pretreatment standards. Users shall comply with the State Act and all applicable regulations promulgated therefrom.
(d) Local limits.
(1) The director is authorized to establish local limits pursuant to 40 CFR 403.5(c). The director may impose mass limitations in addition to, or in lieu of, concentration-based limitations, as defined below. These local limits apply at the point of discharge to the POTW. All concentrations for metals are listed in their
total recoverable form. Quantification of the listed constituents shall follow EPA-approved standard analytical methods.
(2) The following pollutant limits are established to protect against pass through and interference. No person shall discharge wastewater containing in excess of the following:
a. Daily maximum limits for monthly average flows greater than 10,000 gpd.
b. Monthly average limits for monthly average flows equal to or less than 10,000 gpd.
c. Instantaneous maximum limits when samples for the pollutant shall be obtained using grab collection techniques.
_________________________________________________________________________________________________ Pollutant
Daily Maximum Limits for Monthly Average Flows Greater than 10,000 gpd Monthly Average Limits for Monthly Average Flows Equal to or Less than 10,000 gpd Arsenic 0.43 mg/l 0.0357 pounds/day Cadmium 0.11 mg/l 0.0092 pounds/day Chromium 2.77 mg/l 0.2310 pounds/day Copper 3.38 mg/l 0.2819 pounds/day Lead 0.60 mg/l 0.0500 pounds/day Mercury * 0 mg/l 0 pounds/day Nickel 2.80 mg/l 0.2333 pounds/day Selenium 4.19 mg/l 0.3496 pounds/day Silver 0.43 mg/l 0.0359 pounds/day Zinc 2.61 mg/l 0.2177 pounds/day Five-Day Biochemical Oxygen Demand (BOD5 ) 2,700 mg/l 225 pounds/day Total Suspended Solids (TSS) 3,000 mg/l 250 pounds/day Ammonia Nitrogen (NH3 -N) 200 mg/l 17 pounds/day Total Kjeldahl Nitrogen (TKN) 320 mg/l 27 pounds/day Phosphorus, Total 60 mg/l 5 pounds/day Instantaneous Maximum Limits Cyanide 0.83 mg/l Fats, Oils and Grease (FOG) 150 mg/l pH 5.0 - 12.5 s.u.
Temperature 140 deg F Total Toxic Organics (TTO) 2.13 mg/l
* Mercury is a prohibited discharge.
_________________________________________________________________________________________________
c. The director may develop BMPs in individual wastewater discharge permits or in general permits to implement the general sewer use requirements listed in Sec.
106-126 of this division.
(e) County's right of revision. The county reserves the right to establish, by ordinance or in individual wastewater discharge permits or in general permits, more stringent standards or requirements on discharges to the POTW consistent with the purpose of this division.
(f) Dilution. No user shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with a discharge limitation unless expressly authorized by an applicable pretreatment standard or requirement. The director
may impose mass limitations on users who are using dilution to meet applicable pretreatment standards or requirements, or in other cases when the imposition of mass limitations is appropriate.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-127. Pretreatment of wastewater.
(a) Pretreatment facilities. Users shall provide wastewater treatment as necessary to comply with this division and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibited
discharge standards within the time limitations specified by EPA, the state, or the director, whichever is more stringent. Any facilities necessary for compliance
shall be provided, operated, and maintained in working order, at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the director for review, and shall be acceptable to the director before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary
to produce a discharge acceptable to the director under the provisions of this division.
(b) Degree of pretreatment required. All pollutants discharged from an IU to the POTW shall receive such pretreatment or corrective action so as to ensure compliance with the terms and conditions of the issued pretreatment permit and with the following whenever
applicable:
(1) Limitations, prohibitions, and pretreatment standards and requirements promulgated by the EPA pursuant to section 307 of the Act and as described in subparagraph 391-3- 6.08(3)(a)2 of the Rules of Georgia Department of Natural Resources.
(2) Until such time as such limitations, prohibitions, and pretreatment standards and requirements are formally promulgated pursuant to section 307 of the Act, DWR may apply such
limitations, prohibitions, and pretreatment standards and requirements necessary to achieve the purpose of said section of the Federal Act. Such limitations, prohibitions, and pretreatment standards and requirements shall be based upon an assessment of technology and processes, to wit:
a. For existing IUs, limitations, prohibitions, and pretreatment standards and requirements may be based upon application of the best demonstrated control technology currently available;
b. For lUs whose construction commences after the effective date of the ordinance from which this division is derived, limitations, prohibitions, and pretreatment standards and requirements which reflect the greatest degree of effluent reduction which DWR determines to be achievable through the application of best demonstrated control technology currently available, or changes in processes or operating methods or other alternatives, including, where practical, a standard permitting no discharge of pollutants.
(3) Notwithstanding the above, more stringent pretreatment may be required as deemed necessary by DWR to comply with the following:
a. Any other existing federal laws or regulations;
b. Any applicable state water quality standards, NPDES permit effluent limitations and requirements, general sewer use requirements as specified in Sec. 106-
126 of this division, dilution prohibition as specified in Sec. 106-126(f) of this division and 40 CFR 403.6(d), pretreatment standards and requirements, or schedules of compliance;
c. Prohibition of interference or pass through.
(4) Prohibit the discharge of toxic pollutants in toxic amounts which interfere with, pass through, prevent the use or disposal of sewage sludge, or otherwise impede operation of the
POTW.
(c) Additional pretreatment measures.
(1) Whenever deemed necessary, the director may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and such other conditions as may be necessary to protect the POTW and determine the user's compliance
with the requirements of this division.
(2) The director may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable
storage and flow-control facility to ensure equalization of flow. An individual wastewater discharge permit may be issued solely for flow equalization.
(3) FOG and sand interceptors shall be provided when, in the opinion of the director, they are necessary for the proper handling of wastewater containing excessive amounts of FOG or sand; except that such interceptors shall not be
required for residential users. All interception units shall be of a type and capacity approved by the director, shall comply with division 3 of this article, and shall be so located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired by the user at the user's expense.
(4) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter.
(d) Accidental discharge and slug discharge control plans. The director shall evaluate whether each IU needs an accidental discharge/slug discharge control plan or other action to control slug discharges. The director may require any user to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control slug discharges.
Alternatively, the director may develop such a plan for any user. An accidental discharge/slug discharge control plan shall address, at a minimum, the following:
(1) Description of discharge practices, including nonroutine batch discharges;
(2) Description of stored chemicals;
(3) Procedures for immediately notifying the director of any accidental or slug discharge, as required by Sec. 106-130(f) of this division;
and
(4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/ormeasures and equipment for emergency response.
(e) Hauled wastewater.
(1) Septage. Septic tank waste or septage may be introduced into the POTW only at locations designated by the director, and at such times as are established by the director.
a. All persons owning or operating septage pump trucks shall not discharge, directly or indirectly, wastewater into the POTW unless such person shall first have applied for and received a mobile discharge operation (MDO) permit from DWR.
1. Each septage hauler is required to comply with "Rules forMobile Discharge Operators in Gwinnett County," which is available from
DWR.
2. Septage haulers shall not discharge into the POTW any septage which originated outside of the boundaries of the county. Anyone found guilty of discharging septage waste which originated outside of the county into the POTW shall be subject to an administrative fine not exceeding $1,000.00.
b. The director shall designate the locations and times where septage pump truck contents may be discharged, and may
refuse to accept any septic tank waste when it appears to the director that the waste could interfere with the effective operation of the POTW. Further, it shall be the responsibility of the septage hauler to prove to the wastewater treatment plant operator the source and contents of the load prior to dumping. The director may collect samples of each hauled load to ensure compliance with applicable standards. Anyone found guilty of discharging into the POTW at a location not approved for dumping shall be subject to
an administrative fine not exceeding $1,000.00 for each incident.
c. Septage shall not violate the general sewer use requirements listed in Sec. 106-126 of this division, with the following exception: hauled septage approved for direct disposal to the POTW is not required to
meet the local limits for BOD5
, TSS,
NH3 -N, TKN, Phosphorus, and FOG.
(2) Hauled industrial waste. The director may require haulers of industrial waste to obtain individual wastewater discharge permits or general permits. The director may require generators of hauled industrial waste to obtain individual wastewater discharge permits or general permits. At the director's sole discretion, the
director also may prohibit the disposal of any hauled industrial waste.
a. Bonds for hauled industrial waste. The director may require haulers or generators of hauled waste to post bonds in an amount set by the director.
b. Approved sites for discharge of hauled industrial waste.Industrial waste haulers may discharge loads only at locations designated by the director. No load may be discharged without prior consent of the director.
c. Hauled industrial waste sampling and right to refuse. The director may collect samples of each hauled load to ensure compliance with applicable standards. The director may require the industrial waste
hauler to provide a waste analysis of any load prior to discharge and may refuse acceptance, at the director's sole discretion, based upon analytical results or upon POTW loading or capacity.
d. Hauled industrial waste manifests.Industrial waste haulers shall provide a wastetracking form for every load. This form shall include, at a minimum, the name
and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste.
The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes. The disposal of RCRA
waste at the POTW is prohibited unless expressly permitted by the director in writing in advance of such disposal.
e. Local limitations.The discharge of hauled industrial waste approved for direct disposal at a POTW is subject to all other requirements of this division, with the
exception of local limits for BOD5
, TSS,
NH3 -N, TKN, Phosphorus, and FOG.
f. Fees and charges. Hauled industrial waste may be subject to high-strength surcharges in addition to fees for receipt and treatment of hauled waste.
(3) In the event this section is in conflict with Rule 391-3-6-.24 (Regulation of Commercial Waste Originators, Pumpers, Transporters, Processors, and Disposal Facilities) of the Rules of the Georgia Department of Natural Resources,
the more stringent requirement shall prevail.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-128. Individual wastewater discharge permits and general permits.
(a) Permitting tiers.
(1) SIUs. The director shall issue an individual wastewater discharge permit to all SIUs. SIUs are not eligible for a general permit.
(2) Non-significant IUs. The director may issue either an individual wastewater discharge permit or a general permit to non-significant IUs or to commercial users, at the director's discretion. The director may at his sole discretion replace a person's general permit with an individual wastewater discharge permit, or replace an individual wastewater discharge permit held
by a non-significant IU with a general permit.
(b) Wastewater analysis. When requested by the director, a user shall submit information on the nature and characteristics of its wastewater within 30 days of
the request. All analyses shall be performed using EPAapproved standard methods. The director is authorized to prepare a form for this purpose and may periodically
require users to update this information.
(c) Individual wastewater discharge permit and general permit requirement.
(1) No SIU shall discharge wastewater into the POTW without first obtaining an individual wastewater discharge permit from the director, except that a SIU that has filed a timely application may continue to discharge for the
time period specified therein.
(2) General permits may only be issued by the director if in conformity with the Rules of Georgia Department of Natural Resources.
General permits shall only apply to nonsignificant IUs.
(3) The director may require other users to obtain individual wastewater discharge permits or general permits as necessary to carry out the purposes of this division.
(4) Any violation of the terms and conditions of an individual wastewater discharge permit or a general permit shall be deemed a violation of this division and subjects the wastewater discharge permittee to the sanctions set out herein.
Obtaining an individual wastewater discharge permit or a general permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law.
(d) Individual wastewater discharge and general permitting-existing connections. Any user required to obtain an individual wastewater discharge permit or a general permit who was discharging wastewater into
the POTW without a permit prior to the effective date of this ordinance from which this division is derived and who wishes to continue such discharges in the future, shall, within 90 days after said date, apply to the director for an individual wastewater discharge permit or a general permit, and shall not cause or allow discharges to the POTW to continue after 90 days of the effective date this ordinance from which this division is
derived except in accordance with an individual wastewater discharge permit or a general permit issued by the director.
(e) Individual wastewater discharge and general permitting—new connections. Any user required to obtain an individual wastewater discharge permit or a general
permit who proposes to begin or recommence discharging into the POTW shall obtain such permit prior to the beginning or recommencing of such discharge. An
application for this individual wastewater discharge permit or general permit shall be filed at least 60 days prior to the date upon which any discharge will begin or recommence.
(f) Individual wastewater discharge and general permit application contents.
(1) All users required to obtain either an individual wastewater discharge permit or a general permit shall submit a permit application. Users that are eligible may request a general permit. The director may require users to submit all or some of the following information as
part of a permit application:
a. Identifying information.
1. The name and address of the facility, including the name of the operator and owner.
2. Contact information, description of activities, facilities, and plant production processes on the premises.
b. Environmental permits. A list of any environmental control permits held by or for the facility.
c. Description of operations.
1. A complete and accurate description of the nature, average rate of production (including each product produced by type, amount, pro- cesses, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes;
2. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the
POTW;
3. Number and type of employees, hours of operation, and proposed or actual hours of operation;
4. Type and amount of raw materials processed (average and maximum per day);
5. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size,location, and elevation, and all points of discharge.
d. Time and duration of discharges.
e. The location for monitoring all wastes covered by the permit.
f. Safety data sheets for all chemicals used in the process and/or pretreatment.
g. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process
streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e).
h. Measurement of pollutants.
1. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources.
2. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the pretreatment standard or by the director, of regulated pollutants in the discharge
from each regulated process.
3. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported.
4. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Sec. 106-130(j) of this division.Where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required
by the director or the applicable standards to determine compliance with the standard.
5. Sampling shall be performed in accordance with procedures set out Sec. 106-130(k) of this division.
i. For CIUs, the application for a permit shall contain information for a baseline monitoring report as specified in Sec.
106-130(a) of this division.
j. Any other information as may be deemed necessary by the director to evaluate the permit application.
k. Engineering reports, plans, specifications, and other materials submitted to DWR in support of a pretreatment permit application shall be prepared by or under the direct supervision or review
of, and bear the seal of, a professional engineer competent in the field of sewage and industrial waste treatment.
(2) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. DWR's permit-issuance schedule shall begin when the application is complete.
(g) Wastewater discharge permitting-general permits.
(1) At the discretion of the director, the director may use general permits to control non-signifUTILITIES § 106-128 icant IU discharges to the POTW. General permits shall not be available to a SIU. All facilities covered by a general permit shall:
a. Involve the same or substantially similar types of operations;
b. Discharge the same types of wastes;
c. Require the same effluent limitations;
d. Require the same or similar monitoring;
and
e. In the opinion of the director, are more appropriately controlled under a general permit than under individual wastewater discharge permits.
(2) To be covered by the general permit, the user shall file a written request for coverage that identifies its contact information, production processes, the types of wastes generated, the location for monitoring all wastes covered by the general permit, and any other information the director deems appropriate. Notwithstanding the foregoing provisions, the director may issue general permits to users without an initial permit application.
(3) The director will retain a copy of the general permit, documentation to support the POTW's determination that a specific user meets the general permit criteria and applicable state regulations, and a copy of the user's written request for coverage for three years after the expiration of the general permit.
(h) Application signatories and certifications.
(1) All wastewater discharge permit applications, user reports, and certification statements shall be signed by an authorized representative of the user and contain the certification statement specified in this division.
(2) If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for
the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section shall be submitted to the director prior to, or together with, any reports to be signed by an authorized representative.
(i) Individual wastewater discharge and general permit decisions. The director will evaluate the data furnished by the user and may require additional information. Within 45 days of receipt of a complete permit application, the director will determine whether or not
to issue an individual wastewater discharge permit or a general permit. The director may deny any application for an individual wastewater discharge permit or a general permit.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-129. Individual wastewater discharge and general permit issuance.
(a) Individual wastewater discharge and general permit duration. An individual wastewater discharge permit or a general permit shall be issued for a specified time period, not to exceed five years from the effective
date of the permit. An individual wastewater discharge permit or a general permit may be issued for a period less than five years, at the discretion of the director.
Each individual wastewater discharge permit or a general permit will indicate a specific date upon which it will expire.
(b) Individual wastewater discharge permit and general permit contents. An individual wastewater discharge permit or a general permit shall include such conditions as are deemed reasonably necessary by the
director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect
against damage to the POTW.
(1) Individual permit contents.Individual wastewater discharge permits shall contain the following items:
a. A statement that indicates the wastewater discharge permit issuance date, expiration date, and effective date;
b. A statement that the wastewater discharge permit is nontransferable without prior notification to DWR, and provisions for furnishing the new owner or operator with a copy of the existing
wastewater discharge permit;
c. Effluent limits, including BMPs, as specified in Sec. 106-126 of this division;
d. Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants (or BMP)
to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. Sampling
and analysis requirements may include pollutants not otherwise identified by categorical pretreatment standards or local limits;
e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such
schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law;
f. Requirements to control slug discharge, if determined by the director to be necessary;
g. Conditions and limits to ensure that concentration and mass limits requirements under 40 CFR 403.6(c)(1)—(9), dilution
prohibition requirements under 40 CFR 403.6(d), and combined waste stream formula requirements under 40 CFR 403.6(e)(1)—(4) are complied with.
h. DWR's right of entry, inspection, and sampling, at any time;
i. Provisions for zero discharge of process wastewater where appropriate.
(2) General permit contents. General permits shall contain the following:
a. A statement that indicates the wastewater discharge permit issuance date, expiration date, and effective date;
b. A statement that the wastewater discharge permit is nontransferable without prior notification to DWR, and provisions for furnishing the new owner or operator with a copy of the existing
wastewater discharge permit;
c. Effluent limits, including BMPs, as specified in Sec. 106-126 of this division;
d. Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants (or BMP)
to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. Sampling
and analysis requirements may include pollutants not otherwise identified by categorical pretreatment standards or local limits;
e. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such
schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law;
f. Requirements to control slug discharge, if determined by the director to be necessary;
g. Conditions and limits to ensure that concentration and mass limits requirements under 40 CFR 403.6(c)(1)—(9), and dilution prohibition requirements under 40 CFR 403.6(d) are complied with; and
h. DWR's right of entry, inspection, and sampling, at any time.
(3) Optional contents for individual wastewater discharge permits or general permits. Individual wastewater discharge permits or general permits may contain, but need not be limited to, the following conditions:
a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;
b. Requirements for the installation and continuous functioning of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants
into the treatment works;
c. Requirements for the development and implementation of spill control plans, BMPs, or other special conditions, including management practices necesUTILITIES § 106-129 sary to adequately prevent accidental,
unanticipated, or nonroutine discharges;
d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the
POTW;
e. Requirements to monitor pollutants for which limitations have not been established in the permit, or requirements to monitor pollutants of concern for which
local limitations have not been specified by this division;
f. Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices;
g. A statement that compliance with the individual wastewater discharge permit or the general permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those
which become effective during the term of the individual wastewater discharge permit or the general permit; and
h. Other conditions as deemed appropriate by the director to ensure compliance with this division, and state and federal laws, rules, and regulations.
(c) Permit modification.
(1) The director may modify an individual wastewater discharge permit for good cause, including, but not limited to, the following reasons:
a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements;
b. To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since
the time of the individual wastewater discharge permit issuance;
c. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
d. Information indicating that the permitted discharge poses a threat to the POTW, DWR personnel, or the receiving waters;
e. Violation of any terms or conditions of the individual wastewater discharge permit;
f. Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any
required reporting;
g. Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13;
h. To correct typographical or other errors in the individual wastewater discharge permit; or
i. To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance
with this division.
(2) The director may modify a general permit for good cause, including, but not limited to, the following reasons:
a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements;
b. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
c. To correct typographical or other errors in the individual wastewater discharge permit; or
d. To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance
with this division.
(d) Individual wastewater discharge permit and general permit transfer.
(1) Individual wastewater discharge permits or general permits may be transferred to a new owner or operator only if the permittee gives at least
30 days advance notice to the director and the director approves the individual wastewater discharge permit or the general permit cover- age transfer. The notice to the director shall include a written certification by the new owner or operator which:
a. States that the new owner and/or operator have no immediate intent to change the facility's operations and processes;
b. Identifies the specific date on which the transfer is to occur; and
c. Acknowledges full responsibility for complying with the existing individual wastewater discharge permit or general permit.
(2) Failure to provide advance notice of a transfer renders the individual wastewater discharge permit or coverage under the general permit void as of the date of facility transfer.
(e) Individual wastewater discharge permit and general permit revocation. The director may revoke an individual wastewater discharge permit or a general
permit for good cause, including, but not limited to, any of the following reasons:
(1) Failure to notify the director of significant changes to the wastewater prior to the changed discharge;
(2) Failure to provide prior notification to the director of changed conditions in accordance with this division;
(3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application;
(4) Falsifying self-monitoring reports and certification statements;
(5) Tampering with monitoring equipment or meters;
(6) Refusing to allow the director timely access to the facility premises and records;
(7) Failure to meet effluent limitations;
(8) Failure to pay fines;
(9) Failure to pay sewer charges or surcharges;
(10) Failure to meet compliance schedules;
(11) Failure to complete a wastewater survey or the wastewater discharge permit application;
(12) Failure to provide advance notice of the transfer of business ownership of a permitted facility;
(13) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or the general permit or this
division.
(14) Individual wastewater discharge permits or general permits shall be voidable upon cessation of operations or transfer of business ownership. All individual wastewater discharge permits or general permits issued to a user are void upon the issuance of a new individual
wastewater discharge permit or a general permit to that user.
(f) Individual wastewater discharge permit and general permit reissuance. An IU with an expiring individual wastewater discharge permit or general permit shall apply for individual wastewater discharge permit or
general permit reissuance by submitting a complete permit application a minimum of 90 days prior to the expiration of the industrial user's existing individual wastewater discharge permit or general permit.
(g) Regulation of waste received from other jurisdictions.
(1) If a municipality, other county, or user located within another municipality or county, contributes wastewater to the POTW, the director shall enter into an intergovernmental agreement with the contributing municipality or county.
(2) Prior to entering into an agreement required by subsection (g)(1) of this section, the director shall request the following information from the contributing municipality or county:
a. A description of the quality and volume of wastewater discharged to the POTW by the contributing municipality or county;
b. An inventory of all users located within the contributing municipality or county that are discharging to the POTW; and
c. Such other information as the director may deem necessary.
(3) An intergovernmental agreement, as required by subsection (g)(1) of this section, shall contain the following conditions:
a. A requirement for the contributing municipality or county to adopt a sewer use ordinance which is at least as stringent as
this division and its local limits, including required BMPs. The requirement shall specify that such ordinance and limits
shall be revised as necessary to reflect changes made to this division and its local limits;
b. A requirement for the contributing municipality or county to submit a revised user inventory on at least an annual basis;
c. A provision specifying which pretreatment implementation activities, including individual wastewater discharge permit issuance, inspection and sampling, and enforcement, will be conducted by
the contributing municipality or county;
which of these activities will be conducted by the director; and which of these activities will be conducted jointly
by the contributing municipality or county and the director;
d. A requirement for the contributing municipality or county to provide the director with access to all information that the contributing municipality or county
obtains as part of its pretreatment activities;
e. Limits on the nature, quality, and volume of the contributing municipality's or county's wastewater at the point where
it discharges to the POTW;
f. Requirements for monitoring the contributing municipality's or county's discharge;
g. A provision ensuring the director access to the facilities of users located within the contributing municipality's or county's jurisdictional boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the
director; and
h. A provision specifying remedies available for breach of the terms of the intergovernmental agreement.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-130. Reporting requirements.
(a) Baseline monitoring reports (BMRs).
(1) Within either 180 days after the effective date of a categorical pretreatment standard, or 180 days after the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing IUs subject to such categorical pretreatment standards and currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the information listed in subsection (a)(2) of this section. At least 90 days prior to commencement of their discharge, new sources, and sources
that become CIUs subsequent to the promulgation of an applicable categorical pretreatment standard, shall submit to the director a report which contains the information listed in
subsection (a)(2) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical pretreatment standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
(2) Users described above shall submit the information set forth below.
a. Generally. All information required in Sec. 106-128(f)(1)a-g of this division or which is otherwise required by 40 CFR 403.12(b)(1)—(7).
b. Measurement of pollutants.
1. The user shall provide the information required in Sec. 106-128(f)(1)h of this division.
2. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection.
3. Samples should be taken immediately downstream from pretreat- ment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance
with 40 CFR 403.6(e) this adjusted limit along with supporting data shall be submitted to DWR.
4. Sampling and analysis shall be performed in accordance with the sample collection and analytical requirements specified by this division.
5. The director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for
industrial pretreatment measures.
6. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW.
c. Compliance certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional O&M and/or additional pretreatment is required to meet the pretreatment standards and requirements.
d. Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the
shortest schedule by which the user will provide such additional pretreatment and/or O&M shall be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section shall meet the requirements set out in this division.
e. Signature and report certification. All BMRs shall be certified and signed by an authorized representative as required by this division.
(b) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by this section or other relevant provisions of this division:
(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards
(such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operations);
(2) No increment referred to above shall exceed nine months;
(3) The user shall submit a progress report to the director no later than 14 days following each date in the schedule and the final date of compliance, including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and
(4) In no event shall more than nine months elapse between such progress reports to the director.
(c) Reports on compliance with categorical pretreatment standard deadlines. Within 90 days following the date for final compliance with applicable categorical
pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the director a report containing the information described
in Secs. 106-128(f)(1)g and h and subsection (a)(2)b of this section. For users subject to equivalent mass or concentration limits established in accordance with the procedures specified in this division, this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include
the user's actual production during the appropriate sampling period. All compliance reports shall be signed and certified by an authorized representative in accordance with this division. All sampling will be conducted in conformance with the sample collection requirements specified by this division.
(d) Periodic compliance reports. All individual permittees are required to submit periodic compliance reports even if they have been designated a nonsignificant IU.
(1) Except as otherwise specified on individual wastewater discharge permits, all SIUs shall submit monthly reports indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards, and the measured or estimated average and maximum daily flows for the reporting period.
In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user shall submit
documentation required by the director or the pretreatment standard necessary to determine the compliance status of the user.
(2) All non-significant IUs with individual wastewater discharge permits or general permits shall submit reports at the frequency set on the
permit, but not less than twice per year, indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and/or the permit, and the measured or estimated monthly average daily
flows for the reporting period.
(3) All periodic compliance reports shall be signed and certified by an authorized representative in accordance with this division.
(4) All wastewater samples taken by the user shall be representative of the user's discharge.Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all
times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample
results are unrepresentative of its discharge.
(5) If a user subject to the reporting requirement in this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the director, using
the procedures prescribed herein under sample collection, the results of this monitoring shall be included in the report.
(e) Reports of changed conditions. Each user shall notify the director of any significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 30 days before the change.
(1) The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application.
(2) The director may issue an individual wastewater discharge permit or a general permit or modify an existing wastewater discharge permit or a general permit in response to changed conditions or anticipated changed conditions.
(f) Reports of potential problems.
(1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a slug discharge or slug load, that might cause potential problems for
the POTW, the user shall immediately telephone and notify the director of the incident.
This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.
(2) Within five days following such discharge, the user shall, unless waived by the director, submit a detailed written report describing the cause(s) of the discharge and the measures to
be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this division.
(3) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection (f)(1) of this section. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure.
(4) SIUs are required to notify the director immediately of any changes at its facility affecting the potential for a slug discharge.
(g) Reports from unpermitted users. All users not required to obtain an individual wastewater discharge permit or general permit shall provide appropriate reports to the director as the director may require.
(h) Notice of violation by the user/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user shall notify the director within 24 hours of becoming aware of the violation.
The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 days after becoming aware of the violation; such resampling shall be in addition to routine sampling as required by the permit.
(i) Notification of the discharge of hazardous waste.
The discharge to the POTW of waste which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261 is prohibited unless expressly permitted
by the director in writing in advance of such discharge.
The director reserves the right to refuse acceptance of any waste, including hazardous waste.
(1) If such an exception is granted by the director, the user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities, in writing, of any discharge into the POTW of a
substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more
than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the
hazardous constituents contained in the wastes;
an estimation of the mass and concentration of such constituents in the waste stream discharged during that calendar month; and an estimation of the mass of constituents in the
waste stream expected to be discharged during the following 12 months. All notifications shall take place no later than 180 days after the discharge commences. Any notification under this subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions shall be submitted in accordance with this division.
The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of subsections (a), (c) and (d) of this section.
(2) If such an exception is granted by the director, dischargers may be exempt from the requirements of subsection (i)(1) of this section during a calendar month in which they discharge no more than 15 kilograms of hazardous
wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR
261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification.
(3) If such an exception is granted by the director, in the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the
user shall notify the director, the EPA RegionalWasteManagementWaste Division DiUTILITIES § 106-130 rector, and state hazardous waste authorities
of the discharge of such substance within 90 days of the effective date of such regulations.
(4) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.
(5) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this division, a permit
issued thereunder, or any applicable federal or state law.
(j) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the 40 CFR Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using
validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the director or other parties approved by EPA.
(k) Sample collection. Samples collected to satisfy reporting requirements shall be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period.
(1) Except as indicated in subsections (k)(2) and
(3) of this section, the user shall collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab
sampling is authorized by the director. Where time-proportional composite sampling or grab sampling is authorized by DWR, the samples shall be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be
composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease,
the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as
documented in approved EPA methodologies may be authorized by DWR, as appropriate.
In addition, individual grab samples may be required to show compliance with instantaneous limits.
(2) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds shall be obtained using grab collection techniques.
(3) For sampling required in support of baseline monitoring and 90-day compliance reports required in subsections (a) and (c) of this section per 40 CFR 403.12(b) and (d), a minimum of
four grab samples shall be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds for facilities for
which historical sampling data do not exist;
for facilities for which historical sampling data are available, the director may authorize a lower minimum. For the periodic compliance reports required by subsection (d) of this section and per 40 CFR 403.12(e) and (h), the IU is
required to collect the number of grab samples necessary to assess and assure compliance by with applicable pretreatment standards and requirements.
(l) Date of receipt of reports. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United
States Postal Service, the date of receipt of the report shall govern.
(m) Recordkeeping. Users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this division, any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with BMPs.
Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates the analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such
analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or DWR, or where the user has been specifically notified of a longer retention
period by the director.
(n) Certification statement. The following certification statement is required to be signed and submitted by users submitting any of the following documents:
wastewater discharge permit applications; BMRs; reports on compliance with the categorical pretreatment standard; and periodic compliance reports. The following certification statement shall be signed by an authorized representative as defined in this division:
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly
gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-131. Compliance monitoring.
(a) Right of entry; inspection and sampling. The director shall have the right to enter the premises of any user to determine whether the user is complying with
all requirements of this division and any individual wastewater discharge permit or general permit or order issued hereunder. Users shall allow the director ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.
(1) Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its
security guards so that, upon presentation of suitable identification, the director shall be permitted to enter without delay for the purposes of performing specific responsibilities.
(2) The director shall have the right to set up on the user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations.
(3) The director may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper
operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated annually to ensure their accuracy.
(4) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the director and shall not be replaced. The costs of clearing such access shall be borne by the user.
(5) Unreasonable delays in allowing the director access to the user's premises shall be a violation of this division.
(b) Sampling manhole. The location of the monitoring facility shall provide ample room in or near the monitoring facility to allow convenient and accurate
sampling and preparation of samples and analysis and, whether constructed on public or private property, the monitoring facilities shall be provided in accordance with the director's requirements and all applicable DWR construction standards and specifications, and such facilities shall be constructed and maintained in such manner so as to enable the director to perform independent monitoring activities. In addition, SIUs shall comply with the following requirements:
(1) All existing source and new source SIUs shall provide a sampling manhole for accurate sampling and measurement of industrial wastewater. A large sampling manhole shall be provided, at the SIUs expense, on its building sewers conveying industrial wastewater. A large
sampling manhole or sampling chamber shall be located outside the plant. If inside the plant fence, there shall be a gate near the sampling manhole with a key furnished to DWR personnel and which allows access from public rightsof-way or easement. In certain sampling manholes, where noxious fumes may accumulate, DWR may require a fume exhaust system to
protect the life and health of DWR employees who may be required to enter the sampling manhole. The fume exhaust system should extract the fumes from the bottom of the manhole and provide not less than one air change per minute. The sampling manhole shall include a 120V single phase electrical outlet at or near the installation.
(2) For new source SIUs, each sampling manhole shall contain a properly installed flow monitoring device such as a parshall flume, palmerbowlus flume, or other similar device approved by the DWR. Plans of the proposed sampling manhole and monitoring device shall
be prepared by a registered Professional Engineer and submitted to the DWR for review and approval. The director may require the
industrial user to install additional equipment necessary to measure, record, and totalize flow.
This equipment shall be maintained at all times in a safe and proper operating condition. Devices used to measure wastewater flow shall be calibrated periodically, but not less frequently
than annually, to ensure their accuracies. Records of this calibration shall be kept for a period of three years and submitted to DWR
upon request.
(c) Search warrants. If the director has been refused access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation of this division, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of DWR designed to verify compliance with this division or any permit or order issued hereunder, or to protect the overall public health, safety, welfare, or the environment of the community, the director may seek issuance of a search warrant from a court of competent jurisdiction.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-132. Confidential information.
Information and data on a user obtained from reports, surveys, wastewater discharge permit applications, individual wastewater discharge permits, general permits, and monitoring programs, and from the director's inspection and sampling activities, shall be available to the public without restriction, unless the user specifically requests, and is able to demonstrate to the
satisfaction of the director, that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets under applicable state law. Any such request shall be asserted at the time of submission of the information or data. When requested and demonstrated by the user furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon
request to governmental agencies for uses related to the NPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other effluent data, as defined at 40 CFR 2.302, shall not be recognized as confidential information and shall be available to the public without restriction.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-133. Publication of users in significant noncompliance.
The director shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the users which, at any time during the previous 12 months, were in significant noncompliance (SNC) with applicable pretreatment standards and requirements. The term "SNC" shall be applicable to all SIUs, or any other IU that violates subsection (3), (4) or (8) of
this section, and shall have the meaning ascribed to it in Sec. 106-125 of this division.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-134. Administrative enforcement remedies.
(a) Notification of violation.When the director finds that a user has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may serve upon that user a written notice of violation. Within 14 days of the receipt of such notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereof, to include specific required actions, shall be submitted by the user to the director. Submission of
such a plan in no way relieves the user of liability for any violations occurring before or after receipt of the notice of violation. Nothing in this section shall limit the authority of the director to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation.
(b) Consent orders. The director may enter into consent orders, assurances of compliance, or other similar documents establishing an agreement with any user
responsible for noncompliance. Such documents shall include specific action to be taken by the user to correct the noncompliance within a time period specified by the document. Such documents shall have the same force and effect as administrative orders issued in accordance with this division and shall be judicially enforceable.
(c) Show cause hearing. The director may order a user which has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, to appear before the director and show cause why the proposed enforcement action should not
be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that the user show cause why the proposed
enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least 14 days prior to the hearing. Such notice may be served on any authorized representative of the user. A show cause hearing shall not be a bar against, or prerequisite for, taking any other action against the user.
(d) Compliance orders. When the director finds that a user has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may issue an order to the user responsible for the discharge directing that the user
come into compliance within a specified time. If the user does not come into compliance within the time provided, sewer service may be discontinued unless adequate treatment facilities, devices, or other related appurtenances areinstalled and properly operated. Compliance orders also may contain other requirements to address the noncompliance, including additional selfmonitoring and management practices designed to minimize the amount of pollutants discharged to the sewer.
A compliance order may not extend the deadline for compliance established for a pretreatment standard or requirement, nor does a compliance order relieve the user of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any
other action against the user.
(e) Cease and desist orders. When the director finds that a user has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, or that the user's past violations are likely to recur, the director may issue an order to the user directing it to cease and desist all such violations and directing the user to:
(1) Immediately comply with all requirements; and
(2) Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. Issuance of a cease and desist order shall not be a bar against, or a prerequisite for,
taking any other action against the user.
(f) Administrative fines.
(1) When the director finds that a user has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment
standard or requirement, the director may fine such user in an amount not to exceed $1,000.00.
Such fines shall be assessed on a per-violation, per-day basis. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation.
(2) Unpaid charges, fines, and penalties shall, after 30 calendar days, be assessed an additional penalty of ten percent of the unpaid balance,
and interest shall accrue thereafter at a rate of ten percent per month. A lien against the user's property shall be sought for unpaid charges, fines, and penalties.
(3) Users desiring to dispute such fines shall file a written request for the director to reconsider the fine along with full payment of the fine amount within 14 days of being notified of the fine. Where a request has merit, the director may convene an administrative hearing on the matter. In the event the user's appeal is successful, the payment, together with any interest accruing thereto, shall be returned to the user.
The director may add the costs of preparing administrative enforcement actions, such as notices and orders, to the fine.
(4) Issuance of an administrative fine shall not be a bar against, or a prerequisite for, taking any other action against the user.
(g) Emergency suspensions.
(1) The director may immediately suspend a user's discharge, after informal notice to the user, whenever such suspension is necessary to stop an actual or threatened discharge, which reasonably appears to present, or cause an imminent or substantial endangerment to the health, safety, or welfare of persons. The director may
also immediately suspend a user's discharge, after notice and opportunity to respond, that threatens to interfere with the operation of the POTW, or which presents, or may present, an endangerment to the environment.
a. Any user notified of a suspension of its discharge shall immediately stop or eliminate its contribution. In the event of a user's failure to immediately comply voluntarily with the suspension order, the director may take such steps as deemed
necessary, including immediate severance of the sewer connection, to prevent or minimize damage to the POTW, its
receiving stream, or endangerment to any individuals. The director may allow the user to recommence its discharge when the user has demonstrated to the satisfaction of the director that the period of endangerment has passed, unless termination proceedings are initiated against the user.
b. A user that is responsible, in whole or in part, for any discharge presenting imminent endangerment shall submit a detailed written statement, describing the causes of the harmful contribution and
the measures taken to prevent any future occurrence, to the director prior to the date of any show cause or termination hearing.
(2) Nothing in this section shall be interpreted as requiring a hearing prior to any emergency suspension under this section.
(h) Termination of discharge.
(1) In addition to the provisions in all other sections of this division, any user who violates the following conditions is subject to discharge
termination:
a. Violation of individual wastewater discharge permit or general permit conditions;
b. Failure to accurately report the wastewater constituents and characteristics of its discharge;
c. Failure to report significant changes in operations or wastewater volume, constituents, and characteristics prior to discharge;
d. Refusal of reasonable access to the user's premises for the purpose of inspection, monitoring, or sampling; or
e. Violation of the pretreatment standards.
(2) Such user will be notified of the proposed termination of its discharge and be offered an opportunity to show cause why the proposed action should not be taken. Exercise of this option by the director shall not be a bar to, or a prerequisite for, taking any other action against the user.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-135. Judicial enforcement remedies.
(a) Injunctive relief. When the director finds that a user has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may petition the appropriate court through the county's attorney for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the individual wastewater discharge permit or general permit, order, or other requirement imposed by this division on activities of the user. The director may also seek such other action as is appropriate for legal and/or
equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a user.
(b) Civil penalties.
(1) A user who has violated, or continues to violate, any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other
pretreatment standard or requirement shall be liable to the director for a maximum civil penalty of $1,000.00 per violation, per day. In the case of a monthly or other long-term average
discharge limit, penalties shall accrue for each day during the period of the violation.
(2) The director may recover reasonable attorneys' fees, court costs, and other expenses associated with enforcement activities, including sampling and monitoring expenses, and the
cost of any actual damages incurred by the county and DWR.
(3) In determining the amount of civil liability, the court shall take into account all relevant circumstances, including, but not limited to, the extent of harm caused by the violation, the magnitude and duration of the violation, any economic benefit gained through the user's violation, corrective actions by the user, the compliance history of the user, and any other factor as justice requires.
(4) Filing a suit for civil penalties shall not be a bar against, or a prerequisite for, taking any other action against a user.
(c) Criminal prosecution.
(1) A user who willfully or negligently violates any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement shall, upon conviction, be guilty of a misdemeanor, punishable by a fine of not more than $1,000.00 per violation, per day, or imprisonment for not
more than 60 days, or both.
(2) A user who willfully or negligently introduces any substance into the POTW which causes personal injury or property damage shall, upon conviction, be guilty of a misdemeanor and be subject to a penalty of at least $1,000.00, or be subject to imprisonment for not more than 60 days, or both. This penalty shall be in addition to any other cause of action for personal injury or property damage available under state law.
(3) A user who knowingly makes any false statements, representations, or certifications in any application, record, report, plan, or other documentation filed, or required to be maintained, pursuant to this division, individual wastewater discharge permit or general permit, or order issued hereunder, or who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required under this division shall, upon conviction, be punished by a fine of not more than $1,000.00 per violation, per day, or imprisonment for not more than 60 days, or both.
(4) In the event of a second conviction, a user shall be punished by a fine of not more than $1,000.00 per violation, per day, or imprisonment for not more than 60 days, or both.
(d) Remedies nonexclusive. The remedies provided for in this division are not exclusive. The director may take any, all, or any combination of these actions against a noncompliant user. Enforcement of pretreatment violations will generally be in accordance with the county's enforcement response plan. However, the director may take other action against any user when the circumstances warrant. Further, the director is empowered to take more than one enforcement action against any noncompliant user.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-136. Supplemental enforcement action.
(a) Penalties for late reports. A penalty may be assessed to any user for each day that a report required by this division, a permit or order issued hereunder is late,
beginning five days after the date the report is due.
Actions taken by the director to collect late reporting penalties shall not limit the director's authority to initiate other enforcement actions that may include penalties for late reporting violations.
(b) Performance bonds. The director may decline to issue or reissue an individual wastewater discharge permit or a general permit to any user or hauler who has failed to comply with any provision of this division, a
previous individual wastewater discharge permit or a previous general permit, or order issued hereunder, or any other pretreatment standard or requirement, unless such user first files a satisfactory bond, payable to the county, in a sum not to exceed a value determined
by the director to be necessary to achieve consistent compliance.
(c) Payment of outstanding fees and penalties. The director may decline to issue or reissue an individual wastewater discharge permit or a general permit to any user who has failed to pay any outstanding fees, fines or penalties incurred as a result of any provision of this division, a previous individual wastewater discharge permit or a previous general permit, or order issued hereunder.
(d) Water supply severance. Whenever a user has violated or continues to violate any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement, water service to the user may be severed. Service will recommence, at the user's expense, only after the user has satisfactorily demonstrated its ability to comply.
(e) Public nuisances. A violation of any provision of this division, an individual wastewater discharge permit or a general permit, or order issued hereunder, or any other pretreatment standard or requirement is
hereby declared a public nuisance and shall be corrected or abated as directed by the director. Any person(s) creating a public nuisance shall be subject to the provisions of chapter 38 governing such nuisances,
including reimbursing the county and/or DWR for any costs incurred in removing, abating, or remedying said nuisance.
(f) Contractor listing. Users which have not achieved compliance with applicable pretreatment standards and requirements are not eligible to receive a contractual award for the sale of goods or services to the county.
Existing contracts for the sale of goods or services to the county held by a user found to be in significant noncompliance with pretreatment standards or requirements may be terminated at the discretion of the county.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-137. Affirmative defenses to discharge violations.
(a) CIU upset.
(1) For the purposes of this section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of
factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
(2) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the
requirements of subsection (3) of this section are met.
(3) A user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:
a. An upset occurred and the user can identify the cause(s) of the upset;
b. The facility was at the time being operated using industry best practices and in compliance with applicable operation and
maintenance procedures; and
c. The user has submitted the following information to the director within 24 hours of becoming aware of the upset:
1. A description of the indirect discharge and cause of noncompliance;
2. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and
3. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance.
(4) In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall have the burden of proof.
(5) Users shall have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards.
(6) Users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss, or failure of its treatment facility until the facility is restored
or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is
reduced, lost, or fails.
(b) Bypass.
(1) The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning:
Bypass means the intentional diversion of waste streams from any portion of a user's treatment facility.
Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable,
or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage
does not mean economic loss caused by delays in production.
(2) A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient
operation. These bypasses are not subject to the provisions of subsections (b)(3) and (4) of this section.
(3) Bypass notifications.
a. If a user knows in advance of the need for a bypass, it shall submit prior notice to the director, at least ten days before the date of the bypass, if possible.
b. A user shall submit oral notice to the director of an unanticipated bypass that exceeds applicable pretreatment standards within 24 hours from the time it becomes aware of the bypass. A written
submission shall also be provided within five days of the time the user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the
bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned
to reduce, eliminate, and prevent reoccurrence of the bypass. The director may waive the written report on a case-bycase basis if the oral report has been received within 24 hours.
(4) Unavoidable bypass.
a. Bypassing is prohibited, and the director may take an enforcement action against a user for a bypass, unless all of the following conditions pertain:
1. The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;
2. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate
back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and
3. The user submitted notices as required under subsection (b)(3) of this section.
b. The director may approve an anticipated bypass, after considering its adverse effects, if the director determines that it will meet the three conditions listed in
subsection (4)a of this section.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-138. Determination of wastewater volume.
(a) Sewer billing based on metered water consumption. Unless otherwise provided, the volume of wastewater delivered to the POTW will be based upon the quantity of water purchased from and metered by
DWR.
(b) Sewer billing volumes from IUs. If the volume of water delivered to the POTW by an IU is greater or less than the volume purchased from DWR, the IU shall demonstrate to the director such differences. If differences do exist in the opinion of the director, it shall be the obligation of the IU to install DWR-approved
meters or other devices to determine the portion or quantity of wastewater delivered to the POTW. At locations readily accessible for meter reading by DWR employees, separate water meters installed in the county right-of-way are preferred for measuring non-sewered IU consumptive water usage. The director may establish a constant ratio, factor or percentage to be applied to the metered water quantity delivered by DWR in
order to determine the wastewater delivered by the IU;
determining, as well as justifying, the factor to DWR will be the responsibility of the IU. The value of this factor may be periodically reviewed for accuracy by DWR. Other methods, such as considering the amount of water consumed during different seasons, may be established by the director to estimate the quantity of wastewater released to the POTW by the IU. IUs which claim wastewater volumes to be inaccurately determined by these methods shall bear the expense of installing DWR-approved meters or wastewater flow measuring devices to estimate flows to the POTW more accurately.
(c) Sewer billing volumes from non-IUs. Sewer billing to non-IU accounts connected to sewer shall be based upon the volume of water measured by the water
meter.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Sec. 106-139. Pretreatment and other sewer user fees and charges.
(a) General. The director may adopt reasonable fees for recovery of costs of administering and operating DWR's pretreatment program, the FOG program, and/or the POTW, which may include:
(1) Fees for wastewater discharge permit applications and permit renewals, including the cost of processing such applications;
(2) Fees for monitoring, inspection, and surveillance procedures, including the cost of collecting and analyzing a user's discharge, resampling, and reviewing monitoring reports
and certification statements submitted by users;
(3) Fees for reviewing and responding to accidental discharge procedures and construction;
(4) Fees for permitting septic tank waste haulers and fees for receipt and treatment of hauled waste;
(5) The director is authorized to set threshold concentrations and surcharge rates for highstrength wastewater based upon POTW O&M and debt service costs, and to collect the surcharge revenue thus generated, even when such wastewater concentrations exceed local limits.
Surcharges for discharges exceeding local limits shall be in addition to enforcement actions as stated elsewhere in this division and payment of such do not constitute a defense against enforcement.
a. To calculate a FOG surcharge, the analytical results of any grab sample for FOG shall be deemed representative of
the user's discharge for the entire billing period in which the sample is taken, unless additional samples are taken either by DWR or the user during the same
billing period, in which event the average of all FOG analytical results for that period shall be used to calculate the FOG surcharge for that period;
b. To calculate a surcharge on BOD5
, TSS,
NH3 -N, or Phosphorus, the analytical results of any composite sample for
BOD5
, TSS, NH3
-N, or Phosphorus shall be deemed representative of the user's discharge for the entire billing period in which sample is taken, unless additional samples are taken either by DWR or the user during the same billing period, in which event the average of each parameter's analytical results for that period shall be used to calculate the surcharge
for that period;
(6) Fees for filing appeals;
(7) Fees for debris or plugs introduced into the POTW; and
(8) Fees to recover administrative and legal costs associated with the enforcement activity taken by the director to address IU noncompliance.
(b) Other financial requirements. The director may adopt other financial requirements that may be deemed necessary to carry out the requirements contained herein, including fees to create incentives for compliance and bonds for waste haulers and/or hauled waste generators. These fees and bonding requirements relate solely to the matters covered by this division and are separate
from all other fees, fines, and penalties chargeable.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Secs. 106-140—106-161. Reserved.
DIVISION 3. FATS, OILS AND GREASE*
Sec. 106-162. FOG requirements for food service establishments.
(a) Additional definitions.Those definitions set forth in division 2 of this article, in O.C.G.A. § 12-15-20, and in Rules of Georgia Department of Natural Resources 391-3-6-.24(2) are adopted and are incorporated by reference into this division as if fully set forth herein.
(b) Food service establishment requirements.
(1) All food service establishments that discharge to the POTW shall provide a grease trap or interceptor as indicated below. Additionally, the director may require any user who generates any wastewater which contains greater than 150 mg/l FOG to install a grease trap.
(2) All grease traps and interceptors shall be emptied of all material, including solids and liquids, each time these are serviced. Partial pumping, including skimming, is strictly prohibited.
All grease traps and interceptors shall be serviced as specified in this section. All grease traps and interceptors shall be serviced by a
state licensed hauler and a completed manifest shall be kept on site by the user for every service event. All grease waste shall be taken to a licensed and approved disposal facility for disposal and in no manner shall any grease trap or interceptor contents be discharged by a hauler to the collection system, either sewer or stormwater. Any violation may result in full prosecution under all applicable state and local laws and ordinances on the first offense.
(3) All facilities installed by any user pursuant to this division shall comply with all other county ordinances and with all building codes that may be enforced by the county from time to time.
(c) Penalties on non-compliant food service establishments.
(1) Violations. Violating any provision of this section for a total of three violations within 18 months shall be punishable by a fine for each
successive violation not to exceed $1,000.00.
Additionally, any user violating any provision of this division may be liable to pay restitution in the discretion of the court for:
a. The total cost incurred by DWR to repair or replace facilities damaged as a result of the violation.
b. Any injury or damage to person or property or loss of services resulting from the violation.
(2) FOG surcharges. Any user discharging greater than 150 mg/l FOG as measured by any grab sample may be subject to a high-strength surcharge in addition to other enforcement and penalties.
(3) Abnormal occurrences. If, in the judgment of the director, a user is causing or may cause water pollution to such an extent as to be or become dangerous to public health, safety, welfare, or the environment, the director may require such corrective measures as may be necessary for the protection of the public on an emergency basis, and shall have the power and authority to cause all operations of the user to cease until appropriate corrective measures have been taken by issuing an order to the owner or operator thereof directing the
cessation of the operation, or by ordering the utility providing water service to the user to cease providing such service.
(d) Grease trap regulations for new food service establishments.
(1) Grease trap requirements. All food service establishments discharging wastewater containing FOG to the POTW shall install, operate, and maintain at their own expense a sufficiently sized grease trap necessary to achieve and maintain compliance as indicated below.
Installation and maintenance shall conform to the current DWRSSS.
a. Outdoor grease traps. New food service establishments shall have a grease trap as outlined in the DWRSSS. A size variance may be issued in an extreme case but shall be verified and documented by
inspection. The size variance shall conform to DWRSSS size variance guidelines and is subject to approval by the director. All scullery sinks, mop sinks,
floor drains, dishwashers, hub drains, and open receptacles shall drain into the outside grease trap.
b. Outdoor grease trap design. Outdoor grease trap design and installation shall conform to the DWRSSS. The trap shall be located for easy access for user cleaning, pump-out, and inspection by DWR personnel. Dishwasher and food grinder
wastewater should be discharged through a suitably sized solids interceptor prior to the emptying into the outdoor grease trap.
c. Indoor grease traps. All indoor grease trap design and installation shall conform to the DWRSSS. All scullery sinks shall discharge into an indoor grease trap.
d. Mechanical grease traps. Mechanically operated grease traps (Big Dipper, skimmers, etc.) may not be used by any user tied to the POTW.
e. Prohibited discharge. It is prohibited to discharge the following materials into a grease trap:
1. Wastewater with a temperature higher than 120 degrees Fahrenheit.
2. Acid or caustic trap cleaners.
3. Any discharge from a dishwasher without approval from the director.
f. Sampling point. To allow for observation, sampling, and measurement of wastewaters, a sampling point on the
effluent discharge side of the grease trap, as required by the DWRSSS, shall be provided at the user's expense. The sampling point shall be maintained and kept safe and accessible to DWR employees
at all times.
(2) Variances. All users connected to the POTW shall install a minimum 1,500-gallon exterior grease interceptor. Variances may be granted if in the opinion of the director a limited amount of FOG will be discharged by the user during all aspects of their operation. If a variance is granted, a minimum of a 100-pound grease trap shall be installed along with an
effluent test point that meets the testing requirements of DWR's grease program. If at any time the user exceeds the local limit, the
user may be required to upgrade to a minimum of a 1,500 gallon outdoor interceptor at the user's expense. A variance will not be
granted if a dishwasher, grill, range top, fryers, or griddle is present, or if the food service establishment processes meat. The user may also be subject to any fines or penalties associated with the illegal discharge at the discretion of the director.
(e) Grease trap regulations for existing food service establishments.
(1) Upgrade. If a food service establishment in existence prior to codification of this division has no grease trap or, as documented by inspection, it is determined that the current grease trap is insufficient for the volume of food service waste being treated, the director may require that the establishment upgrade to an adequately sized grease trap and sampling point
as outlined in this section.
(2) FOG best management practices (FOG BMPs).
In order to enhance the overall efficiency of the grease trap, food service establishments should implement FOG BMPs to reduce FOG and solids loading to their grease trap. Examples of FOG BMPs are:
a. Scraping food from pots, pans, plates and utensils into a garbage can;
b. Installation of a solid waste interceptor;
c. Pre-washing plates by spraying them off with cold water over a small mesh catch basin positioned over a drain. The catch basin should be cleaned into a garbage can as needed; and
d. Pouring all liquid grease and oil from pots and pans into a waste grease bucket stored at the pot-washing sink. Heavy solids buildup of oil and grease on pots and pans should be scraped off into the waste grease bucket.
e. Observe the contract cleaning of grease traps to ensure full removal of grease trap contents.
f. Additional information on FOG BMPs and reference materials may be obtained from DWR.
(f) Grease trap maintenance. All grease traps shall be maintained by the owner so as to be in continuously efficient operation.Maintenance shall include the complete removal of all contents by a properly licensed waste hauler. Top skimming, decanting or back flushing of the grease trap or its waste is prohibited. Further, the discharge of liquid, semi-solids, or solids into a
grease trap from vehicles after servicing is prohibited.
Vehicles capable of separating water from grease shall not discharge separated water into the grease trap or into the POTW. Cleaning and maintenance of all grease traps shall include removal of materials from the tank walls, baffles, cross pipes, inlets and outlets, both tee's and the cover. Recyclable FOG shall not be discharged into the POTW. Any violation in the removal of grease waste shall result in prosecution under state law. Maintenance shall be performed at frequencies as required by subsections (f)(1) and (2) of this section.
(1) Outdoor grease interceptor. Maintenance shall be performed at intervals of not less than once every 90 days and as required by the 30 percent rule, as follows: The depth of both bottom solids and floating oil/grease in a trap shall not equal or be greater than 30 percent of the total operating depth of the trap; the operating depth of a trap is the internal depth from the inlet or outlet water elevation to the bottom of the trap. Outdoor grease interceptors shall have a minimum of 1,500-gallon capacity. Any solids interceptor should be emptied and cleaned daily.
(2) Indoor grease trap. Maintenance shall be performed at intervals not less than once every 30 days. A variance is required to operate an
indoor grease trap in place of a 1,500-gallon minimum outdoor interceptor. Indoor grease traps shall have a minimum of 100 pound capacity. Any current user connected to the POTW that currently operates an indoor grease trap, regardless of size, shall prove to the satisfaction of the director that they are not discharging illegally or the user shall be required to upgrade to a 1,500-gallon minimum outdoor grease interceptor. Users may not operate indoor grease traps with a capacity less than 100 pounds. A solids interceptor tied to
an indoor grease trap should be emptied and cleaned daily.
(3) Pumping variance. Variances may be granted if the user can prove at their expense to the director's satisfaction that the discharge from the user's grease trap or interceptor is meeting
the local limit up to 180 consecutive days for outdoor grease interceptors or 120 consecutive days for indoor grease traps.
(4) Additives. It is specifically prohibited to use any additive, such as enzymes, chemicals, or bacteria, as a substitute for grease trap maintenance. The direct addition of such additives to a grease trap is also prohibited.
(5) Waste removal. The user shall be responsible for the proper removal and legal disposal of the grease trap waste. All waste removed from each grease trap shall be tracked by an approved three-part manifest and the contents shall be disposed of at a facility permitted to
receive such waste. In no manner shall any grease trap contents be discharged to the collection system, sewer or stormwater.
(6) Manifest transmittal. The user shall maintain a legible copy of the completed three-part manifest on site for each service event. Failure to provide all manifests for review by DWR's
grease trap inspectors may result in a fine at the discretion of the director.
(7) In the event this section is in conflict with Rule 391-3-6-.24 (Regulation of Commercial Waste Originators, Pumpers, Transporters, Processors, and Disposal Facilities) of the Rules of the Georgia Department of Natural Resources,
the more stringent requirement shall prevail.
(g) Recordkeeping by user. It shall be a violation of this division for a user to allow the removal of their grease trap waste without documentation by an approved three-part manifest. The user shall be responsible for maintaining a copy of these manifests on site for a period of three years and subject to the director's
review without prior notification. The manifest shall contain the information listed below:
(1) Food service establishment.
a. Facility name, address, and telephone number.
b. Trap type and size.
c. Date and volume removed from the trap.
d. Authorized signature (verifying the grease trap was cleaned and in operable condition).
(2) Service company information (waste hauler).
a. Pumper name, address, and telephone number.
b. Pumper permit number.
c. Date and volume removed from the trap.
d. Disposal method.
e. Authorized signature of pumper.
(3) Disposal site.
a. Facility name, address, and telephone number.
b. Facility EPD permit number.
c. Date and volume received.
d. Authorized signature verifying receipt of waste.
(h) Grease trap inspections by DWR personnel.
(1) Inspection. Inspection of a grease trap shall be performed according to the "30 percent rule" as defined herein.
(2) Failed inspection. If a grease trap fails the initial inspection, the inspector may notify the user that the grease trap shall be cleaned out within seven calendar days. After seven calendar days, the grease trap may be re-inspected.
(3) Failed re-inspection. If at the first re-inspection, the grease trap is found to still be in non-compliance, a notice of violation may be
issued and the user may be told that the grease trap shall be cleaned immediately. After three weekdays, the grease trap may be re-inspected.
(4) Mechanical grease traps. Mechanically operated grease traps may not be used by any user tied to the POTW.
(i) Notice of FOG violation by DWR personnel.
(1) Issue FOG NOV. As outlined in division 2 of this article, whenever the director discovers a violation of any provision of this division, a written NOV may be issued to the user. If satisfactory remedy has occurred within the timeframe specified in the NOV, the requirement for a written explanation of the violation and a plan for satisfactory correction and prevention by the user may be waived by the director.
(2) Disregard of FOG NOV.If a user served with a NOV fails to initiate/complete corrective action within the timeframe specified within the NOV, the director may pursue one or more of
the following options:
a. Have the grease trap pumped and place the appropriate charge on the user's monthly water and sewer bill.
b. Terminate water and sewer service to the establishment.
c. File an appropriate action in the courts to compel compliance.
d. Any combination of the above enforcement actions.
(Ord. No. DWR:2019-01(GCID:2019-0963), Exh. A, 11-5-2019) Secs. 106-163—106-192. Reserved.
DIVISION 4. RECLAIMED WATER
Sec. 106-193. Reclaimed water.
All users of reclaimed water shall comply with the conditions of the county's reuse permit issued by the state EPD. The director of water resources is authorized to issue permits for the use of reclaimed water.
These permits will contain conditions of the use and application of reclaimed water, including curtailment or interruption of usage.
(Code 1994, § 114-107; Ord. No. SWR-2010-001, 11- 16-2010) Secs. 106-194—106-224. Reserved.
ARTICLE IV. WATER AND SEWER SYSTEM
DEVELOPMENT CHARGES
Sec. 106-225. Title, authority, and applicability.
(a) Title. This article shall be known and may be cited as the Gwinnett County Water and Sewer System Development Charge (SDC) Ordinance of 2010.
(b) Authority.The county has the authority to adopt this article pursuant to article 9, section 3, paragraph 1 and article 9, section 2, paragraph III of the Constitution of the state, and pursuant to Related Laws article II, division 8, section 23.
(c) Applicability. This article shall apply to all areas where the county provides water and/or sewer service, including both retail and wholesale service.
(Code 1994, § 114-111; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-226. Intent and purpose.
(a) Intent. The intent of this article is to ensure that new development bears an appropriate and proportionate share of the capital cost for system improvements necessary to provide water and/or sewer facilities in the
county. It is in the interest of the public's health, safety and welfare and convenience for the county to require payment of appropriate and proportionate share charges upon commencement of any development increasing demand. This article therefore imposes a SDC on new service whenever the new service creates the potential for additional demand. Increased potential for retail water demand is generally characterized as installing or adding a water meter for any purpose other than static fire protection; increased potential for wholesale water demand is generally characterized as measured increases in wholesale water usage above past amounts.
Increased potential for retail sewer demand is generally characterized as installing or adding a water meter when any portion of down-stream plumbing is connected to the sewer system; increased potential for wholesale sewer demand is generally characterized as
measured increases in wholesale sewer usage above past amounts.
(b) Purpose. The purpose of this article is to establish revenues to assist in providing increased capacity for the water and sewer system. The increased capacity
shall accommodate the additional demand new development places on the water system and/or sewer system. New development which increases demand or which has the potential to increase demand shall be
required to pay a fee which does not exceed a proportionate share of the reasonably anticipated capital costs of new water and sewer facilities that its presence necessitates. This will be accomplished by requiring payment of appropriate and proportionate share charges upon commencement of any new development increasing demand, including increasing demand within wholesale jurisdictions. The water system development charge and sewer system development charge are for the exclusive purpose of providing increased capacity for the water and sanitary sewer system, respectively.
(Code 1994, § 114-112; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-227. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Authority means an entity having legal existence with the capacity to sue and be sued in the state, and empowered to enter into binding contracts.
Building permit means the document issued by the county, or by any city or jurisdiction where the county provides direct water or sewer services, authorizing the construction, repair, alteration or addition to a structure, or authorizing the installation of a mobile home.
Capital improvement means an improvement with a useful life of ten years or more, by new construction or other action, which increases the service capacity of a public water facility or public sewer facility. (See also System improvements.)
Capital improvements plan or CIP means the portion of the county capital improvements plan which sets out projected needs for water system and sewer system improvements, and a description of anticipated funding sources for each required improvement.
County means Gwinnett County, a political subdivision of the state.
Developer means any person or legal entity undertaking development activity.
Developmentor development increasing demand means any construction or expansion of a building, structure, or use, any material change in use of a building or structure, or any change in the use of land, including irrigation, any of which increases the actual or potential demand on the water system and/or sewer system and need for public facilities as demonstrated by an
increase in the number or size of water taps and/or a connection to water and/or sewer where none previously existed.
Director means the county director of water resources (DWR) and/or the officials that he may designate to administer the various provisions of this article.
Meter size means the manufacturer's rated diameter of the inlet and outlet connecting pipes to the meter, or nominal diameter of the tap on the water main if different from the manufacturer's rated diameter of the meter.
Person means any person, group of persons, firm or firms, corporation or corporations, nonprofit organization or non-government organization, municipality, or other form of government, or any other entity.
Public sewer facility or public sewer facilities means assets providing wastewater capacity, including, but not limited to, wastewater collection and conveyance facilities, reclamation plants, residual biosolids handling and disposal facilities, and other support facilities required for system operation.
Public water facility or public water facilities means assets providing water system capacity, including, but not limited to, water supply, potable water treatment plants, raw and potable water storage, raw and potable water transmission lines, potable water distribution lines, and other support facilities required for system operation.
Sewage pumping station means an installation for the conveyance of sewage by means other than gravity, and which is built in accordance with county standards and specifications.
Sewer demand means the potential demand placed on the county sewer system by a connection to the sewer system. Sewer demand flows are equated to metered water demand.
Sewer system means all public sanitary sewer facilities for wastewater collection and treatment and other support facilities required for system operation.
Sewer system development charge(s) orsewer SDC(s) means a payment of money imposed on development as a condition of development approval to pay for a proportionate share of the capital cost of sewer system improvements needed to serve new growth and development. SDCs shall be deemed to run with the land, and shall not be transferable from one tract or lot of
land to another.
System improvements means capital improvements that are public water facilities or public sewer facilities and are designed to provide service to the community at large.
System improvements costs means capital costs incurred to provide additional water or sewer capacity needed to serve new growth and development. Such
capital costs may be incurred for planning, design, land acquisition, land improvement, construction, including the cost of both new construction and reconstructing system improvements or public water facility or public sewer facility expansions, and related land acquisition costs, including land purchases, court awards and costs, attorneys' fees, and expert witness fees. System improvement costs may also include projected interest charges and other finance costs if and to the extent the water or sewer SDCs are to be used for the
payment of principal and interest on bonds, notes, or other financial obligations issued by or on behalf of the county to finance capital improvements. Such costs do not include routine and periodic maintenance expenditures, personnel training, and other operation costs.
Water demand means the potential demand placed on the county water system by a connection to the water system. Demands are rated either by the potential maximum flow through the water meter for each connection, or by the average historical usage by different sized connections.
Water system means all public water facilities for supply, treatment, storage, transmission, distribution, and other support facilities required for system operation.
Water system development charge(s) orwater SDC(s) means a payment of money imposed upon development as a condition of development approval to pay for a proportionate share of the capital cost of water
system improvements needed to serve new growth and development. SDCs shall be deemed to run with the land, and shall not be transferable from one tract or lot of land to another.
(Code 1994, § 114-113; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-228. Imposition of system development charges.
(a) Applicable to development which increases demand. Any person who engages in development increasing water demand or creating the potential to increase water demand by adding or increasing the size of a
water meter shall pay a water SDC as required by this article. Any person who engages in development increasing sewer demand shall pay a sewer SDC as required by this article. Examples include, but are not limited to, the following circumstances wherein a SDC
is due. The examples provided are not exhaustive. Exceptions are defined elsewhere in this article.
(1) Establishment of a new water system connection with a new meter mandates payment of a water SDC.
(2) Establishment of a new sewer system connection where none previously existed mandates payment of a sewer SDC.
(3) A water customer who was not previously a sewer user and who taps onto sewer mandates payment of a sewer SDC(s) for all water meters serving fixtures which are thus connected to sewer.
(4) An existing water-only customer who adds a water tap and meter must pay an additional water SDC appropriate to the size of the new tap, regardless of whether or not there were changes in structure or occupancy. Similarly, an existing water and sewer customer who adds a water tap and meter must pay both the water and sewer SDC appropriate to the size of the new tap, regardless of whether there were changes in structure or occupancy, and regardless of whether a new sewer tap was made, unless no fixtures or plumbing of that new water tap are connected to sewer.
(5) A tap made for the sole purpose of irrigation shall pay a water SDC but not a sewer SDC.
(b) SDC payment prerequisite to a building permit.
No building permit for any activity requiring payment of the appropriate SDC(s) pursuant to this article shall be issued by the county unless and until the SDC has been paid.
(c) Sewage pumping station charges. Any person who engages in development increasing sewer demand and who installs a new sewage pumping station shall pay sewage pumping station charges as required by this article.
(d) Change of use, redevelopment, or modification of structure. When a change of use, redevelopment or modification of an existing use or building requires an increase in water meter size, the new SDC(s) shall be based on the difference between the current value of the SDC for the existing tap and the SDC calculated for the proposed use. However, should the change of use, redevelopment or modification of an existing use or building or water meter result in a net decrease in water meter size, no refunds or credits for past impact fees or SDCs paid shall be made or created.
(Code 1994, § 114-114; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-229. Payment of system development charges.
(a) Any person required to pay water and/or sewer SDCs pursuant to this article shall pay such fees to the department of planning and development or to the appropriate municipality prior to or concurrent with the issuance of a building permit. If an existing water meter is to be replaced with a larger meter then SDCs shall be paid prior to the installation of the new meter.
Sewage pumping station charges shall be paid as a prior condition of sewer extension plan approval.
(b) All funds collected pursuant to this article shall be properly identified as SDCs and accounted for as further described in the section of this article on accounting for SDCs. Funds shall be used solely for the purposes specified in this article.
(Code 1994, § 114-115; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-230. Calculation of water system development charges and sewer system development charges.
(a) SDC Formulas. The maximum amount of the proportionate share SDC shall be calculated using the following formulas. In any given year the actual SDC charged may be less than the maximum allowable.
Water and sewer SDCs shall be separately calculated.
SDC = ACC × ME
SDC = System Development Charge.
The SDC for the meter in question.
ACC = Allocated Capital Cost.
The allocated capital cost of providing water facilities required to serve the demand created by an average three-fourthinch meter customer.
ME = Meter Equivalency.
The meter equivalency factor for the meter in question, from the schedule of meter equivalencies established from historical usage by Gwinnett County customer categories.
ACC = AB/CB × D
AB = Value of the Total Asset Base for Future Customers.
CB = Total Capacity of Total Asset Base for Future Customers.
The capacities created by the total historical and planned investment made in facilities available for future customers expressed in gallons per day of capacity on an average daily basis.
D = Projected Water Demand.
The average daily water consumption of all active customers with a three-fourthinch meter as of the calendar year(s) prior to the date the SDC resolution was
passed by the WSA, which has been calculated by the Department of Water Resources (DWR) from billing records.
AB = ((FA-G-CA-P) × %AFC) + FCIPFRC
FA = Total Fixed Assets.
The total value of all existing fixed assets of the water system or sewer system.
G = Fixed Assets Funded by Grants.
The value of grants received by the county from the state, the EPA or other sources for system improvements. This value is deducted from the fixed assets to reflect the fact that this amount was not paid by existing customers and therefore should not be recovered from future customers through SDCs.
CA = Contributed Assets.
The value of water distribution lines, collection sewers, and any other water or system assets donated to the water or sewer system, usually by developers. The contributed assets received by the county are deducted from the value of existing fixed assets to reflect the fact that these facilities were not paid
for by existing customers and therefore should not be recovered from future customers through the SDCs.
P = Principal Outstanding on Bonds for Fixed Assets.
To prevent SDCs from recovering debt on existing assets that will be repaid using future rate payments, the total amount of principal on outstanding debt used to develop existing fixed assets is deducted from the cost basis of the SDC.
%AFC = Percent of Fixed Assets Available for Future Customers.
Only the value of existing fixed assets that is associated with capacity actually available for use by future customers is allocated to SDCs.
An estimate of the existing capacity available for future customers by functional category is multiplied by the net value of existing assets to remove the value of any assets currently used or committed to existing customers.
FCIP = Future CIP Projects Allocated to Future Customers.
The projected cost of capital improvement plan projects that will result in an increase in capacity available for future customers.
FRC = Future Rate Credit.
To prevent SDCs from recovering for the portion of the value of planned assets providing capacity that will be repaid using the present value of rate payments from future customers, a projection of rate payments by future customers for debt retirement on planned assets providing capacity is deducted from the cost basis of the SDCs.
CB=CHI+CCIP
CHI = Capacity of Historical Investment Available to Future Customers.
Capacities for each system functional category of the historical investment available for future customers.
CCIP = Capacity of CIP Projects Allocated to Future Customers.
Capacities reflecting the net increase in capacity available for future customers resulting from all CIP projects by functional category.
(b) SDCs established by resolution. The amount of the SDC graduated by water meter size shall be that established by joint resolution of the water and sewerage authority and the board of commissioners.
(Code 1994, § 114-116; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-231. Sewage pumping station phase-out charges.
If, for the purposes of development, a sewage pumping station must be installed, the developer shall pay sewage pumping station phase-out charges as set by
joint resolution by theWSA and the BOC. Such charges may recover some or all of the costs imposed on longrange capital improvements plan caused by the public acceptance of the sewage pumping station. Such payments shall be made as a prior condition of sewer plan approval.
(Code 1994, § 114-117; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-232. Use of water and sewer system development charge funds.
(a) Dedication of SDC revenues to system improvements. Funds collected from SDCs shall be used to pay a proportionate share of system improvement costs,
including servicing debt for applicable system improvements. No funds generated by SDCs shall be used for periodic or routine maintenance.
(b) Exclusive to either water or sewer system improvements. Water SDCs shall be used exclusively for water system improvements. Sewer SDCs shall be used exclusively for sewer system improvements.
(c) Annual reporting. Each fiscal period the department of financial services shall present to the BOC an annual report describing the amount of SDCs collected, encumbered and used during the preceding year.
(d) Debt service funding. Water and sewer SDCs may be used for the payment of principal and interest on bonds, notes or other financial obligations issued by or on behalf of the county or the WSA to finance public water or sewer system improvements, respectively.
(Code 1994, § 114-118; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-233. Sewage pumping station operation and maintenance and replacement charges.
If, for the purposes of development, a sewage pumping station must be installed, the developer may be required to pay a cost as set by joint resolution of the
WSA and BOC to defray the future operation and maintenance or replacement cost of that sewage pumping station. This cost may recover some or all of the projected future costs to operate, maintain, and replace
the sewage pumping station over a 25-year planning period. Such payment shall be made as a prior condition of sewer plan approval.
(Code 1994, § 114-119) Sec. 106-234. Exemptions and refunds.
(a) Exemptions. The following shall be exempted from payment of SDCs:
(1) Any development whereby neither water nor sewer service is initiated.
(2) Any development:
a. Which does not add or increase the number or size of water meters; and
b. Where sewer service is not initiated.
(3) The replacement of a building, mobile home or structure that was in place on the effective date of the ordinance from which this article is derived, or the replacement of a building, mobile home or structure subsequent thereto and for which the then-correct SDC had been paid
or otherwise provided for, with a new building, mobile home or structure, provided that the size of the pre-existing water meter stays the same and no new taps are requested.
(4) Public school districts which own the property served and which pay the water and/or sewer bill for the service requested are exempt from the payment of SDCs.
(5) State universities which own the property served and which pay the water and/or sewer bill for the service requested are exempt from the payment of SDCs.
(6) Taps made solely for the purpose of fire suppression and which are deemed to have zero consumption except for the purposes of fire
protection shall not pay SDCs. However, should usage on such fire lines be initiated after installation for purposes other than fire protection then the entity receiving the water bill shall be
invoiced for the full amount of the thencurrent water and/or sewer SDC corresponding to the size of the fire line tap, which shall thereafter be metered. Such SDC(s) shall be
paid within 90 days unless usage is disconnected; unpaid SDCs shall become a lien on the property after 90 days.
(7) If a development eliminates or relocates one or more existing sewage pumping stations such that, even though new sewage pumping stations are built, the result is there is a decrease in the county's inventory of sewage pumping
stations, then the new sewage pumping station(s) is exempt from payment of both sewage pumping station charges.
(8) If a development eliminates or relocates one or more existing sewage pumping stations such that, even though new sewage pumping stations are built, the result is no net increase in the county's inventory of sewage pumping stations and the new pump station(s) is in the same size category as the old pump station(s),
then the new sewage pumping station(s) is exempt from payment of both sewage pumping station charges; however, if an existing pumping station is decommissioned and a
larger pumping station is built, then that new pumping station is exempt from the phase-out charge but may be liable for the difference in the operation and maintenance and replacement charges applicable to different size categories of pumping stations.
(b) SDCs not refundable. Unless otherwise required by law, refunds of SDCs shall not be made unless such was collected in error.
(Code 1994, § 114-120; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-235. Water and sewer system development charge service areas established.
There is hereby established a SDC service area comprised of all areas where the county presently or may through system extensions provide water and/or sewer
service.
(Code 1994, § 114-121; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-236. Accounting for water and sewer system development charges.
(a) SDC accounts.Water and sewer SDC funds shall be deposited and maintained in one or more interest bearing accounts. Interest earned on SDCs shall be considered funds of the account on which it is earned and shall be subject to all restrictions imposed by the section of this article on use of SDC funds.
(b) SDC account withdrawals.Funds withdrawn from these accounts must be used in accordance with the provisions of the section of this article on use of SDC funds.
(Code 1994, § 114-122; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-237. Review of charges.
The SDC schedule and pumping station charges may be reviewed by either the WSA and/or the BOC at the time of their determination. Any failure to review such schedule shall not invalidate this article. Amendments to the SDC schedule may be adopted by resolution.
(Code 1994, § 114-123; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-238. Penalty and enforcement provision.
(a) SDC payment required for construction. Any building permit used for new construction as covered by this article but without payment of the fee as required by this article shall be void and construction activity may be halted by the county.
(b) Violations. A violation of this article shall be a misdemeanor punishable according to law; however, in addition to or in lieu of any criminal prosecution, the county shall have the power to sue for relief in civil court to enforce the provisions of this article. Knowingly furnishing false information to the director on any matter relating to the administration of this article
shall constitute a violation thereof.
(Code 1994, § 114-124; Ord. No. SDC-2010, 12-14- 2010) Sec. 106-239. Interlocal government agreement and SDC equivalents (SDCEs).
(a) Interlocal agreements for SDC collection. The county may enter into interlocal agreements with municipalities within or outside the county, with other counties, with authorities, or with the state for the
purpose of assessing, collecting, and expending SDCs as further provided by this article.
(b) Wholesale SDCs and SDC equivalents. The county may require payment of SDCs as a condition of providing wholesale water or sewer service. The county shall require payment of SDCEs as a condition of providing for increases in wholesale water or sewer demand. An interlocal agreement is not required for the imposition and collection of SDCEs. SDCE amounts may be established by county resolution.
(Code 1994, § 114-125; Ord. No. SDC-2010, 12-14- 2010)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.