Habersham County · Código de ordenanzas
Habersham County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2025-12-15
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 4 de 8. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
(f) Paper printouts of each transaction's documentation required by this section, which shall include any documentation or information provided by the person pawning the article to the pawnbroker, shall be made by the pawnbroker and stored on premises for inspection by the sheriff or his designee.
(g) Daily reports shall also include any other information or documentation provided by the person pawning the article to the pawnbroker, as well as any documentation of the transaction in the pawnbroker's possession.
(h) To the extent that the pawnbroker utilizes security cameras, video surveillance tapes shall be maintained for a minimum of 30 days and made available to the sheriff's office as requested.
(Ord. of 3-16-2015, § 7(18-721)) Sec. 18-322. Pawned merchandise not to be disposed of for forty days.
(a) Regarding any and all articles not redeemed by the person who pawned the article by the maturity date (30 days), the pawnbroker must hold the pawned article for an additional ten-day grace period before disposing of the article or placing the article in public view for sale.
(b) In the event the pawnbroker purchases the article instead of the pledge, then the pawnbroker is required to hold the article for 30 days before disposing of the article or placing the article in public view for sale.
(Ord. of 3-16-2015, § 7(18-722)) Sec. 18-323. Dealing with minors.
It shall be unlawful for any pawnbroker, his agents or employees, to receive in pawn, pledge or sale, goods of any character or description from a minor. For the purposes of this section, a minor is any individual 17 years of age or under.
(Ord. of 3-16-2015, § 7(18-723)) Sec. 18-324. Enforcement of article.
The article shall be enforced by the Habersham County Sheriff or his designee. This article shall not apply to incorporated portions of the county, unless it is expressly adopted by the applicable local municipal governing authority. Pursuant to O.C.G.A. § 16-11-173(b), firearms shall not be regulated pursuant to this article. However, pawnbrokers must comply with all requirements, including but not limited to record-keeping requirements for firearms as specified in O.C.G.A. § 44-12-132, of title 44, chapter 12, article 3, part 5 of the Official Code of Georgia Annotated, and shall be subject to all applicable criminal penalties under state law for any violation of same.
(Ord. of 3-16-2015, § 7(18-724)) Sec. 18-325. Violation; penalty.
It shall be unlawful and a violation of this article for any person to fail to comply with any provision of this article. Any violation of any provision of this article shall subject the pawnbroker or person, as applicable, to citation returnable to the magistrate court of Habersham County, Georgia and shall be subject to fines and/or imprisonment as provided for in the Code of Ordinances, Habersham County, Georgia.
(Ord. of 3-16-2015, § 7(18-725)) Chapter 19
RESERVED
Chapter 20
DRIVEWAY CONSTRUCTION*
Sec. 20-1. Intent.
The safe operating of motor vehicles, and the need to minimize potential nuisance factors resulting from conflicts between commercial or industrial traffic utilizing streets designed for residential traffic, are issues which directly relate to the public health, safety, and welfare of residents in the county. The appropriate design and location of driveways can significantly lessen the adverse effects related to these issues. The establishment of reasonable design standards and administrative procedures included herein shall aid in protecting the health, safety, and welfare of the residents of the county.
(Ord. of 6-20-2016) Sec. 20-2. Purpose of design standards.
The purpose of this chapter is:
(1) To ensure that vehicles leave or join the roadway traffic at a proper angle and in conformity with the rules of the road.
(2) To reduce hazard to vehicles by reducing areas of conflict and points of conflict between vehicles.
(3) To increase the capacity of roads and intersections by reducing areas of conflict between vehicles.
(4) To provide sufficient space for the installation of traffic control devices, utilities and crosswalks.
(5) To reduce hazard to pedestrians by reducing areas of possible conflict between pedestrians and vehicles, and to define such areas.
(6) To provide reasonable assurance against the hazardous and indiscriminate use of highway right-of-way through encroachment.
(7) To provide a maximum practical sight distance, especially at intersections.
(8) To provide uniform and impartial consideration in all cases where access is required by abutting property owners.
(9) To reduce the possibility of conflicts between commercial/industrial traffic generators and residential areas.
(Ord. of 6-20-2016) Sec. 20-3. Definitions.
(a) The following definitions apply to the standards set forth in these regulations and figures included as examples of driveway types:
Buffer areas means the border area along the frontage between the traveled way and the right-of-way line and within the frontage boundary lines; areas (1), (2), (3), (4) in figures 1 and 2 of section 20-23.
Buffer island means the area between the frontage right-of-way line and a line parallel to and a minimum of a four-foot distance from the right-of-way line extended away from the right-of-way line; area (5) in figures 1 and 2 in section 20-23.
Common access driveway means the primary means of access to a public street, shared by and connecting three but no more than five parcels, tracts, lots, building sites or structures.
Corner clearance (C) means, at an intersecting street or highway, the dimension measured along the edge of the traveled way between the frontage boundary line opposite the intersection of the two right-of-way lines and the tangent projection of the nearest edge of the driveway; see figure 3, section 20-23.
Distance between double driveways (D) means the distance measured along the right-of-way line between the tangent projection of the inside edges of two adjacent driveways to the same frontage; D in figure 2 of section 20-23.
Driveway angle (Y) means the angle of 90 degrees or less between the driveway centerline and the edge of the traveled way; see figures 1 and 2 of section Sec. 20-23.
Driveway width (W) means the narrowest width of the driveway measured parallel with the edge of the traveled way; see figures 1 and 2 of section 20-23.
Edge clearance (E) means the distance measured along the edge of the traveled way, between the frontage boundary line and the tangent projection of the nearest edge of the driveway; see figures 1 and 2 of section 20-23.
Frontage means the length along the highway right-of-way line of a single property tract of roadside development area between the edges of the property; the distance between (1) and (2) in figures 1 and 2 of section 20-23.
Frontage boundary line (abbreviated as FB line) means a line perpendicular to the highway centerline, at each end of the frontage lines, extending from the right-of-way to the edge of the through-traffic lane; line (1)—(4) or (2)—(3) in figures 1 and 2 of section 20-23.
Inside radius (U) means the inside or smaller curve radius on the edge of the driveway, used when Y is substantially less than 90 degrees; see figures 2 and 3 of section 20-23.
Outside radius (R) means the outside or larger curve radius on the edge of the driveway; see figures 1, 2 and 3 of section 20-23.
(b) For simplicity, the above definitions are stated in terms of single radius curves of the edge of driveways or intersecting highways. Where compound curves or tapers are used, an equivalent single radius curve may be used as a control guide.
(Ord. of 6-20-2016) Sec. 20-4. Application for permit.
Application for a permit to construct or alter a driveway or curb cut occurring on or abutting a county road right-of-way shall be made to the building official of the county under the following circumstances:
(1) When such driveway(s) or curb cut(s) are incidental to the development of a new structure or the development of previously undeveloped property, the driveway permit shall constitute a part of the building permit.
(2) When such driveway or curb cut construction constitutes a separate action apart from any other construction on the same site, a driveway permit shall be secured from the building official.
(3) When property abutting a county road right-of-way changes from one use to another and driveways and/or curb cuts have previously been extended across or to a county road right-of-way, or when the type of use or the volume of use of an existing and/or previously approved driveway is substantially changed, application for review shall be submitted and a driveway permit secured from the building official.
The occupancy permit may be withheld until such driveway improvements have been approved.
(Ord. of 6-20-2016) Sec. 20-5. Issuance or denial of permit; appeals.
Upon reviewing an application for a driveway permit in any of the aforementioned circumstances, the building official shall take one of the following courses of action:
(1) Issue the permit if the standards correspond with the requirements as outlined in the regulations.
(2) Submit the application to the public works director and/or the planning director for their review, such review not to exceed five working days. The public works director and/or the planning director shall:
a. Recommend approval of the permit to the building official;
b. Recommend disapproval of the permit unless certain modifications are made which they shall delineate in writing to the building official.
(3) Issue the permit if the applicant agrees to follow the recommendations of the public works director/planning director.
(4) Deny the permit application.
(5) If the driveway permit is denied by the building official, the applicant can appeal the building official's decision to the planning commission, who shall hear testimony from the applicant. The planning commission may either approve or deny the application.
(Ord. of 6-20-2016) Sec. 20-6. General design standards.
The location, design and construction of the driveway shall be in accordance with the following standards. These standards are in no case to be modified unless specifically authorized by the building official:
(1) A driveway shall be located and restricted as to width as necessary driveway and its appurtenances are contained within the frontage along the highway of the property served. At public highway intersections a driveway shall not provide direct ingress or egress to or from the public highway intersection area and shall not encroach on or occupy areas of the roadway or right-of-way deemed necessary for effective traffic control or for highway signs or signals. A driveway shall be so located and constructed that vehicles approaching or using it will have adequate sight distance in both directions along the highway.
(2) The number of driveways permitted serving a single property frontage shall be a maximum of two unless more are deemed necessary by the public works director for reasonable service to the property without undue impairment of safety, convenience, and utility of the highway.
(3) If the property has frontage on more than one street, and a driveway permit is requested, the building official may request a recommendation from the public works director, planning director, or planning commission as to the potential adverse effects which may result. If it is determined that it would cause a nuisance to the surrounding area, or a traffic hazard, or unduly congest traffic, then the permit may be denied.
(4) The island area on the right-of-way between successive driveways or adjoining a driveway and between the highway shoulder and right-ofway line shall remain unimproved for vehicular travel or parking.
Such areas shall be considered as restricted and may be filled in or graded down only as hereinafter provided in subsection (8) of this section.
(5) The surface of the driveway connecting with rural type highway sections shall slope down and away from the highway shoulder a sufficient amount and distance to preclude ordinary surface water drainage from the driveway area flooding onto the highway roadbed.
(6) The driveway shall not obstruct or impair drainage in side ditches or roadside areas. Driveway culverts, where necessary, shall be adequate for surface water drainage along the roadway and in no case less than the equivalent of 15-inch diameter pipe. The distance between culverts under successive driveways shall be not less than ten feet except as such restricted area is permitted to be filled in under the provisions of subsection (8) of this section. All driveway culverts shall be constructed of the following materials and meet Georgia Department of Transportation (D.O.T.) specifications:
a. Reinforced concrete pipe (RCP), D.O.T. approved Class III or better.
b. Corrugated metal pipe, D.O.T. approved, type II aluminized steel.
This material is prohibited in live stream applications.
c. High density polyethylene (HDPE) pipe, D.O.T. approved, dual walled.
(7) Driveways connecting to L back curb and gutter must be constructed by removing the curb and gutter and pouring a valley gutter. When curb and gutter is removed for constructing a driveway, the new connections shall be of equivalent acceptable material and curb returns shall be provided or restored in a neat, workmanlike manner.
The driveway or valley gutter surface shall connect with the highway pavement and sidewalks, if any, in a neat workmanlike manner. In no case shall the driveway construction impair the flow of water in the gutter. Figures 7 and 8 depict the proper details for constructing a valley gutter.
(8) Driveways connecting to rolled curb and gutter may be constructed by either pouring the driveway directly up to the back of the curb or by removing the curb and gutter and pouring a valley gutter. When curb and gutter is removed for constructing a driveway, the new connections shall be of equivalent acceptable material and curb returns shall be provided or restored in a neat, workmanlike manner. The driveway or valley gutter surface shall connect with the highway pavement and sidewalks, if any, in a neat workmanlike manner. In no case shall the driveway construction impair the flow of water in the gutter. Figures 7 and 8 depict the proper details for constructing a valley gutter.
(9) Any activities that impair the flow of water in a curb and gutter are prohibited. These prohibited activities include, but are not limited to:
The filling in of curb and gutter with concrete or asphalt, or the removal of curb and gutter without providing an acceptable valley gutter as described in [subsections] (7) and (8) above.
(10) The restricted area between successive driveways may be filled in or graded down only when the following requirements are fully complied with:
a. The filling or grading down shall be to grades approved by the public works director; and, except where drainage is by means of curb and gutter, water drainage of the area shall be directed away from the highway roadbed in a suitable manner.
b. Culvert extension under the restricted area shall be of like size and equivalent acceptable material of the driveway culvert, and intermediate manholes adequate for clean-out purposes may be required where the total culvert length exceeds 100 feet.
c. Where no side ditch separates the restricted area from the roadbed, permanent provision may be required to separate the areas from the highway roadbed, to prevent its use for driveway or parking purposes, by construction of a border, curb, rail or posts deemed adequate by the public works director.
(Ord. of 6-20-2016) Sec. 20-7. Specific design standards.
The following specific design standards in sections 20-9 through 20-16 shall apply to driveways requiring permits as set forth in these regulations.
The items are driveway width, angle of entry and exit, return radius of curb, maximum percent of frontage for driveway use, distance to side property lines, island areas, intersection clearance, parking and storage areas and driveway grade.
(Ord. of 6-20-2016) Sec. 20-8. Driveway widths.
Measured parallel to the roadway, [driveway widths shall be as follows]:
Minimum Maximum Residential 8 feet 0 inches 15 feet Minimum Maximum Residentialduplex 8 feet 0 inches 22 feet Apartments 10 feet 0 inches 30 feet Commercial:
One-way 15 feet 0 inches 25 feet Two-way 20 feet 0 inches 30 feet Industrial 20 feet 0 inches 40 feet (Ord. of 6-20-2016) Sec. 20-9. Angle of entry and exit.
Driveway angles [shall be as follows]:
(1) Residential, 60 to 90 degrees, or parallel to property line;
(2) Apartments, 70 to 90 degrees for two-way driveways or 45 to 90 degrees for one-way streets;
(3) Commercial, 70 to 90 degrees for two-way driveways or 45 to 90 degrees for one-way on divided roadway or 60 to 90 degrees for one-way ramp on non-divided roadway;
(4) Industrial, 90 degrees, or as close as practicable, for two-way, or 45 degrees, one-way access on one-way street;
(5) Rural, land access only, 60 to 90 degrees.
(Ord. of 6-20-2016) Sec. 20-10. Return radius of curb.
[Return radius of curbs shall be as follows:]
Minimum Maximum Residential 3 feet 15 feet Apartment 5 feet 20 feet Commercial:
Urban 10 feet 20 feet Suburban 15 feet 25 feet Rural 15 feet 35 feet Industrial:
Urban 15 feet 25 feet Rural 25 feet 40 feet (Ord. of 6-20-2016) Sec. 20-11. Maximum percentage of frontage for driveway use.
(a) Each single driveway shall have a maximum width of 30 percent of the property frontage. Where two or more driveways are permitted, no more than 60 percent of property frontage shall be used as driveways.
(b) No approval for a curb cut will be given where it is apparent that the intent is not to provide access but to provide parking only. A driveway approach must provide access to something definite on private property such as a parking area considerably greater in extent than the width of the driveway, or provide access to a driveway, or to a door at least eight feet wide intended for the entrance of vehicles, etc. (not applicable for residential driveways).
(Ord. of 6-20-2016) Sec. 20-12. Distance to side property lines.
(a) The area within five feet of a frontage boundary line shall be a restricted area on which no driveway may be developed on public right-ofway (E).
(b) A minimum of 1 feet of pavement edge or curb shall be left undisturbed adjacent to each frontage boundary line to serve as an island area. This distance shall be measured between the FB line and the point of tangency of the driveway radius and the edge of the pavement measured along the edge of the pavement.
(c) Subsection (a) or (b) of this section shall apply, whichever is more restrictive.
(d) These requirements may be waived when a single driveway is approved to serve two adjacent lots.
(Ord. of 6-20-2016) Sec. 20-13. Island areas.
(a) Minimum island dimensions.
(1) Distance between double driveways (D), ten feet minimum at narrowest point;
(2) Minimum island depth, four feet where parking abuts street right-ofway line.
(b) Treatment of island or buffer area. In the development of private property and the construction of driveways thereto, it may be necessary to regrade the buffer area by cutting or filling. Such work shall be done in a manner to insure adequate sight distance for traffic operations, proper drainage, suitable slopes for maintenance operations, and good appearance.
The buffer area outside the driveways shall be treated to prevent use by vehicles. This may be accomplished by grading, or use of curbs, rails, guide posts, low walls, low shrubs, etc., in a manner which will not impair clear sight across the area.
(c) Visibility clearance. No landscaping, fences, terraces, or other natural or artificial features adjacent to any street shall be of a nature impairing visibility from or of approaching vehicular traffic where such visibility is important to safety, nor shall such features in any way create potential hazards to pedestrians. In particular, at vehicular entrances and exits, no off-street parking, landscaping, or other material impediment to visibility between the height of three feet and ten feet, measured from the roadway level, shall be permitted within triangular areas defined by lines connecting points described as follows:
a. Nonresidential use. Beginning at a point where the midline of the entrance or exit intersects the public right-of-way, thence to a point of 35 feet along the right-of-way in the direction of approaching traffic, thence to a point of 25 feet toward the interior of the lot along the midline of the entrance or exit, and thence to a point of beginning. (See figure Sec. 20-13 A [Sec. 20-23 5A].)
b. Multifamily residential use. Beginning at a point where the midline of the entrance or exit intersects the public right-of-way, thence to a point of ten feet along the right-of-way in the direction of approaching traffic, thence to a point of ten feet toward the interior of the lot along the midline of the entrance or exit, and thence to the point of beginning. (See figure Sec. 20-23 B [Sec. 20-23 5B].)
(Ord. of 6-20-2016) Sec. 20-14. Intersection clearance.
The length, width and shape of corner island areas will vary for different locations. The angle of intersection, angle of driveways, width of the right-of-way on both approaches, channelization radii, and other conditions will influence the location of driveways at intersections. The location and angle of an approach in relation to the highway intersection shall be such that a vehicle leaving the service facility may be merged in the lane of traffic moving in the desired direction before crossing the intersection, and that a vehicle entering the facility from the intersection may do so in an orderly and safe manner with a minimum of interference to through traffic.
The following conditions may be applicable in most instances:
(1) No driveway shall be allowed to encroach upon pavement edge radii.
(2) The following minimum distances from the intersection right-of-way line (C) shall apply where there is no conflict with the foregoing conditions:
a. Traffic volume A.D.T. of 1,500 or less, 20 feet;
b. Traffic volume A.D.T. over 1,500 but less than 10,000, 35 feet;
c. Traffic volume A.D.T. over 10,000 but less than 15,000, 50 feet;
d. Traffic volume A.D.T. over 15,000, 65 feet.
The public works director shall have the authority to increase these distances if in his opinion such action is necessary for the protection of traffic.
The public works director may also modify these requirements if justifiable on the basis of site conditions.
(Ord. of 6-20-2016) Sec. 20-15. Parking and storage areas.
(a) Each roadside business establishment, when providing off-street parking or storage space, shall provide such parking or storage space off the right-of-way to prevent the storage of vehicles on the driveway or the backing up of traffic on the travel way. This is particularly needed for businesses where a number of vehicles will be leaving and entering at the same time.
(b) Particular attention will be paid to drive-in facilities such as banks, minute car washes, drive-in restaurants, drive-in bill paying facilities, and other service facilities where motorists are served while in their vehicles, to insure that queues of vehicles will not extend out onto the public streets.
(Ord. of 6-20-2016) Sec. 20-16. Driveway grade.
(a) Residential driveways: The maximum grade which shall be permitted is 17 percent.
(b) Apartment, commercial and industrial driveways: The maximum grade which shall be permitted is eight percent.
(c) Grades within the right-of-way shall be controlled by existing shoulder slope or existing and future sidewalk elevations.
(d) When driveways are intended for special use vehicles, the underside clearance and/or break over angle of the subject vehicle shall dictate the maximum driveway.
(Ord. of 6-20-2016) Sec. 20-17. Common access driveways; general provisions.
The following specific design standards shall apply to common access driveways requiring permits as set forth in these regulations. Even though a common access drive may provide access to parcels or lots, each resultant parcel, tract, or lot must still meet the minimum public street frontage requirements for the zoning district in which it is located unless otherwise exempted as a lot of record. Parcels, tracts, lots, or building sites for which building permits are requested or upon which there is a proposed subdivision of land that will not have separate and individual driveway access to a public street within the limits of the property itself, but is proposed to be served by a common access driveway, shall install such a driveway in conformance to the following standards in sections 20-18 through 20-22.
(Ord. of 6-20-2016) Sec. 20-18. Common access driveways; submission of plans.
Any [person seeking an] (a) building permit or occupancy permit requested for lots of record, or (b) proposed subdivision of land, whereby three but not more than five parcels or lots are to be served by a common access driveway, shall, at the time of the permit application or proposed subdivision of property, submit all necessary plans as required by the county engineer indicating the proposed location and construction specifications for the proposed common access driveway.
(Ord. of 6-20-2016) Sec. 20-19. Common access driveways; construction prior to plat approval or issuance of occupancy permit.
New common access driveways shall be constructed prior to the issuance of an occupancy permit for lots of record or prior to the approval and recording of a final plat for the proposed subdivision of land.
(Ord. of 6-20-2016) Sec. 20-20. Common access driveways; plats and required statements.
Plats indicating the location of common access driveway easements and lots to be served shall be recorded with the clerk of superior court of the county. The plats shall include:
(1) A statement to the effect that the driveway easement shown on the plat is not to be dedicated as a public road and not to be maintained by the county, but shall be privately maintained; and
(2) A statement signed by the surveyor, a registered engineer or a registered landscape architect that the driveway has been constructed in accordance with the minimum standards of the county.
(Ord. of 6-20-2016) Sec. 20-21. Common access driveways; previously existing driveways.
Any existing easements or common driveways which have been recorded prior to the effective date of this amendment [chapter] may continue to serve existing lots which were also recorded prior to the effective date of the resolution codified in this chapter. Any new driveways which would propose access to three or more undeveloped lots of record must conform with the standards for a common access driveway in accordance with this amendment.
(Ord. of 6-20-2016) Sec. 20-22. Common access driveways; minimum standards.
Construction of common access driveways shall conform to the following minimum standards. Please see Figure 6 for a cross-section detail:
(1) Easement width, 30 feet, 30 feet radius easement in cul-de-sac;
(2) Roadbed width 20 feet;
(3) Shoulder width, two feet;
(4) Base width, 18 feet;
(5) Pavement width, 16 feet;
(6) Minimum radius at cul-de-sac transition and intersections, 20 feet;
(7) Pavement type:
a. Plant mix, one inch thick over graded aggregate four inches thick (except within the public right-of-way, which shall be six inches thick);
b. Concrete, four inches thick (except within the public right-of-way, which shall be six inches thick);
(8) If a common access driveway terminates in a dead end, the termination shall be either a cul-de-sac with a paved radius of 25 feet, or another termination method that allows for vehicles to turn around safely and is acceptable to county engineering;
(9) If a common access driveway is a cul-de-sac, the maximum length of the cul-de-sac shall be 1,000 feet;
(10) Individual driveways joining the common driveway must be placed entirely on the property that they serve;
(11) Individual driveways joining the common driveway may only serve one lot;
(12) Ditches: Front slope, maximum 2:1 ratio; rear slope, maximum 2:1 ratio; 1 foot minimum depth;
(13) Maximum finished driveway grade, 17 percent; driveway grades up to 20 percent may be approved by the county engineer in extreme conditions;
(14) Pavement crown, -inch per foot;
(15) All slopes and shoulders to be grassed;
(16) Minimum crossdrain pipe size, 18 inches;
(17) The driveway must intersect the public road at an angle of 65 degrees or greater;
(18) The driveway must enter the public road at least 65 feet from any intersection of another common access driveway as measured from centerline to centerline. The driveway must enter the public road at least 65 feet from another public road intersection as measured from the centerline of the common access driveway to the closest point of right-of-way intersection;
(19) Intersection sight distance shall be as specified in the sight distance table in appendix A § 1220 of this Code.
(Ord. of 6-20-2016) Sec. 20-23. Example figures.
The following figures may be used in conjunction with the standards and definitions set forth in this chapter as examples of typical driveway types:
(Ord. of 6-20-2016) Sec. 20-24. General conditions of approval; rights of county.
The following conditions shall apply to all approvals for driveway construction on public right-of-way:
(1) The applicant shall represent all parties with a property interest in the proposed driveway and shall certify that any driveway or approach constructed by him is for the bona fide purpose of securing access to his property and not for the purpose of parking or servicing vehicles, or for advertising, storage, or merchandising of goods on the county right-ofway.
(2) The applicant shall furnish all materials, do all work, and pay all costs in connection with the construction and maintenance of the driveway and its appurtenances on the right-of-way unless the county agrees otherwise. The applicant shall arrange for and bear the entire cost of moving poles, trees, signs, hydrants, catch basins, and other existing installations which may interfere with the proposed driveway. Materials used and type and character of work shall be suitable and appropriate for its intended purpose, and the type of construction shall be as designated by and subject to approval of the public works director. The time-table for installation shall be approved by the building official and/or public works director. The applicant shall make the installation without jeopardy to or interference with vehicular traffic using the highway or pedestrian traffic using the adjacent sidewalk. Street surfaces, shoulders, ditches and vegetation disturbed shall be restored to equivalent or original condition by the applicant.
(3) No revisions or additions shall be made to the driveway or its appurtenances on the right-of-way without the written permission of the building official.
(4) The county reserves the right to make such changes, additions, repairs and relocations within statutory limits to the driveway or its appurtenances on the right-of-way as may at any time be considered necessary to permit the relocation, reconstruction, widening and maintaining of the highway or to provide proper protection to life and property [on] or adjacent to the street. The county shall make all reasonable attempts to comply with all provisions of this resolution [chapter].
(5) The applicant, his successors or assignees agree to hold harmless the county and its duly appointed agents and employees against any action for personal injury or property damage sustained by reason of the exercise of the permit issued pursuant to this chapter.
(6) Whenever an existing road is improved by reconstruction or maintenance work, existing entrances to the road may be altered by the county to conform to the spirit and intent of the policy and standards set forth in this chapter.
(7) Whenever the public works director determines that inadequate or indiscriminate access or long stretches of paved or unpaved accesses result in an undue hazard to the motoring public on the thoroughfare, existing entrances may be required to be altered or reduced in extent to conform with the spirit and intent of this policy and upon approval of the governing authority.
(Ord. of 6-20-2016) Sec. 20-25. Conflict with other laws.
Should any requirement or design standard conflict in any manner with any other law, rule or regulation of any local, state or federal governmental body or administrative agency, then the stricter law, rule, or regulation shall be applied. It is not intended by this chapter to interfere with or abrogate or annul any easements, covenants, or other agreements between parties;
provided, however, that, where this chapter imposes a greater restriction upon the use of property or premises than is imposed or required by other resolutions, rules or regulations, or by easements, covenants, or agreements, the provisions of this chapter shall govern.
(Ord. of 6-20-2016) Sec. 20-26. Severability; penalty; additional remedies.
(a) Validity. Should any article, clause or provision of this chapter be declared by a court of competent jurisdiction to be invalid, such action shall not affect the validity of the chapter as a whole or any part hereof being declared severable.
(b) Remedies. In case any driveway is (or is proposed to be) constructed, reconstructed, altered, converted, or maintained, or any driveway is (or is proposed to be) used, in violation of any provision of this chapter, the building official, county attorney, or [other appropriate official may, in addition to] other remedies, institute injunction, mandamus, or other appropriate action or proceeding to prevent such unlawful construction, reconstruction, alteration, conversion, maintenance, or use [or] to correct or abate such violation. Where a violation of these regulations exists, the county building official may, in addition to other remedies, notify all public utilities and county service departments of such violation and request that service be withheld therefrom until such time as there is no longer a violation of these regulations.
(c) Penalties for violations. Any person, firm, corporation, association or partnership violating any provision of this chapter as the same exists or as it may hereinafter be amended, or shall fail to do anything required by this chapter as the same exists or as it may hereafter be amended, shall be guilty of a misdemeanor, amenable to the process of the Magistrate or State Court of Habersham County, and upon conviction, shall be punished as provided in the Official Code of Habersham County, Georgia section 1.50.020 for each violation in the discretion of the court. Each and every day that such violation exists shall be deemed a separate offense.
(Ord. of 6-20-2016) Chapter 21
RESERVED
Chapter 22
EMERGENCY SERVICES*
ARTICLE I. IN GENERAL
Sec. 22-1. Ambulance service to Tallulah Falls city limits.
(a) Purpose. Provide guidelines for appropriate ambulance response to the City of Tallulah Falls, Georgia, by way of an agreement between Rabun County and Habersham County Ambulance Services.
(b) Procedure.
(1) Any call received from lower Rabun County that is determined to be within the city limits of Tallulah Falls will be considered in the Habersham County response area.
(2) Should assistance be needed on any given call, back up support may be requested from either Habersham County or Rabun County Ambulance Services.
(3) Should a patient request to be transported to a hospital other than H.C.M.C., their request will be honored provided their condition is stable. If the patient's condition is unstable, based on the EMT/ paramedic's findings, they will then be transported to the nearest facility capable of treating the emergency.
(4) Calls in Rabun County outside the Tallulah Falls city limits will continue to be handled by the mutual aid agreement between Habersham and Rabun Counties.
(Ord. No. 92-11, §§ A, B, 12-7-1992) Secs. 22-2—22-20. Reserved.
ARTICLE II. EMERGENCY 911 SYSTEM*
DIVISION 1. GENERALLY
Sec. 22-21. Central dispatch department created.
The county central dispatch department is created.
(Res. of 7-2-1990) Secs. 22-22—22-45. Reserved.
DIVISION 2. COUNTY EMERGENCY COMMUNICATIONS SERVICE
DISTRICT
Sec. 22-46. Short title.
This division shall be known and may be cited as the "Habersham County Emergency Communications Service District Resolution."
(Res. No. 1-91, § I, 1-7-1991) Sec. 22-47. Definitions.
The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
District means the corporate boundaries, including its municipalities, of Habersham County, Georgia, providing an emergency telephone number 911 system.
Emergency 911 system means a local telephone exchange service which facilitates the placing of calls by persons in need of emergency services to a public safety answering point by dialing the telephone number 911 and under which calls to 911 are answered by public safety answering points established and operated by the local government subscribing to the 911 service. The term "emergency 911 system" also includes "enhanced '911' service," which means an emergency telephone system that provides the caller with emergency 911 system service and, in addition, directs 911 calls to appropriate public safety answering points by selective routing based on the geographical location from which the call originated and provides the capability for automatic number identification and automatic location identification features.
Exchange access facilities means the access from a particular telephone subscriber's premises to the telephone system of a service supplier. Exchange access facilities include service supplier provided access lines, PBX trunks, and centrex network access registers, all as defined by tariffs of telephone companies as approved by the Georgia Public Service Commission. Exchange access facilities do not include service supplier owned and operated telephone pay station lines, wide area telecommunications service (WATS), foreign exchange (FX) or incoming other lines.
Governing authority means the board of commissioners of Habersham County.
911 charge means a contribution to the local government for the 911 service start-up equipment costs, subscriber notification costs, addressing costs, billing costs, nonrecurring and recurring installation, maintenance, service and network charges of a service supplier providing the 911 service pursuant to this chapter, and costs associated with the hiring, training and compensating of dispatchers employed by the local government to operate said 911 system at the public safety answering points.
Public agency means the state and any city, county, city and county, municipal corporation, chartered organization, public district or public authority located in whole or in part within this state which provides or has authority to provide firefighting, law enforcement, ambulance, medical or other emergency services.
Public safety agency means a functional division of a public agency which provides firefighting, law enforcement, emergency medical, suicide prevention, civil defense, poison control, drug prevention, child abuse, spouse abuse or other emergency services.
Service supplier means a person or entity who provides local exchange telephone service to a telephone subscriber.
Tariff rate means the rate billed by a service supplier as stated in the service supplier's tariffs and approved by the Public Service Commission that represent the service supplier's recurring charges for exchange access facilities exclusive of all taxes, fees, licenses or similar charges whatsoever.
Telephone subscriber means a person or entity to whom local exchange telephone service, either residential or commercial, is provided and in return for which the person or entity is billed on a monthly basis. When the same person, business or organization has several telephone access lines, each exchange access facility shall constitute a separate subscription.
(Res. No. 1-91, § II, 1-7-1991) Sec. 22-48. Purpose.
The purpose of the district is to plan, acquire, construct, add to, extend, improve, equip, operate and maintain an emergency telephone number 911 system to support the district public safety agencies in the provision of emergency services and law enforcement services, resulting in the saving of life, a reduction in the destruction of property, quicker apprehension of criminals and ultimately the saving of moneys.
(Res. No. 1-91, § III, 1-7-1991) Sec. 22-49. Establishment and funding of district.
(a) Establishment. The government authority herewith establishes an emergency telephone number 911 system district and levies an emergency telephone service charge in an amount not to exceed the total district operating budget of the emergency telephone number 911 system divided by the total number of exchange access facilities within the district. Any district service charge shall have uniform application and shall be imposed throughout the entire district to the greatest extent possible in conformity with the availability of such service in any area of the district. The funds generated by the service charge shall be utilized by the county solely to defray the actual costs of the emergency telephone 911 system as those costs are defined at O.C.G.A.
§ 46-5-134(e). The governing authority may, by resolution, amend the service charge rate to an amount adequate to fund the district.
(b) Service charge.
(1) The government authority may impose the emergency telephone service charge provided for in subsection (a) of this section in an amount not to exceed $1.50 per month per exchange access facility provided to telephone subscriber.
(2) Every billed telephone subscriber shall be liable for any service charge imposed under this section until it has been paid to the service supplier.
The duty of the service supplier to collect any such service charge shall commence upon the date of its implementation as set forth in subsection (c)(1) of this section. Any such emergency telephone service charge shall be added to, and stated separately in, the bill by the service supplier to the service user.
(c) Collection.
(1) The service charge shall be collected at the same time as the tariff rate in accordance with the regular billing practice of the service supplier;
provided, however, that no such charge be levied or collected prior to 30 days following the date the emergency telephone number 911 system becomes fully operational.
(2) The service supplier shall have no obligation to take any legal action to enforce the collection of any emergency telephone service charge. The service supplier shall provide the governing authority with the name and address of each telephone subscriber who has notified the service supplier in writing of such telephone subscriber's refusal to pay the emergency telephone service charge. The service supplier shall so notify the governing authority within 60 days of receipt of such notice by the user. A collection action may be initiated by the county and reasonable costs and attorneys' fees associated with that collection action may be awarded to the county.
(3) Good faith compliance by the service supplier with this provision shall constitute a complete defense to any legal action or claim which may result from the service supplier's determination of nonpayment or the identification of telephone subscribers in connection therewith.
(d) Revenue.
(1) The amounts collected by the service supplier attributable to any emergency telephone service charge shall be due quarterly to the district. The amount of service charge collected in one calendar quarter by the service supplier shall be remitted to the district no later than 60 days after the close of a calendar quarter. Said amounts shall be deposited and accounted for in a separate special revenue fund maintained by the county and known as the Emergency Telephone System Fund. The county may invest the money in the same manner as other moneys of the county may be invested, and any income earned from such investment shall be deposited into the Emergency Telephone System Fund.
(2) On or before the 60th day after the close of a calendar quarter, a return, in such form as may be mutually agreed to by the county and the service supplier, shall be filed with the county, together with a remittance of the amount of service charge collected payable to the district.
(3) The service supplier shall maintain records of the amount of the service charge collected for a period of at least three years from date of collection. The county may, at its expense, require an annual audit of the supplier's books and records with respect to the collection and remittance of the service charge.
(4) The service supplier shall be entitled to retain as an administrative fee an amount equal to three percent of the gross receipts to be remitted to the district.
(e) Additional funding. In order to provide additional funding for the district, the county may receive federal, state, municipal, or private funds which shall be expended for the purposes of this division.
(f) Tax exemption. The emergency telephone service charge is not subject to state and local tax.
(g) Exemption. The service charge does not apply to exchange access facilities provided to federal, state and local governments.
(Res. No. 1-91, § IV, 1-7-1991) Secs. 22-50—22-71. Reserved.
DIVISION 3. EMERGENCY 911 SYSTEM ADVISORY BOARD*
Sec. 22-72. Duties.
The duties of the 911 advisory board shall be to assist the county with:
(1) Reviewing and analyzing the progress by public safety agencies in developing 911 system requirements;
(2) Recommending steps of action to effect the necessary coordination, regulation and development of a 911 system;
(3) Identifying mutual aid agreements necessary to effect the 911 system;
(4) Assisting in the promulgation of necessary rules, regulations, operating procedures, schedules and other such policy and administrative devices as shall be deemed necessary and appropriate; and
(5) Providing other services as may be deemed appropriate by the local government.
(Res. of 3-1-2004) Sec. 22-73. Members.
(a) In accordance with O.C.G.A. § 46-5-136, the county board of commissioners shall appoint the sheriff and the following representatives listed below, from other public safety agencies, which respond to emergency calls under the 911 system, and individuals knowledgeable of emergency 911 systems and the emergency needs of the citizens of the county. Individuals listed below, except for the sheriff, shall be public officials or representatives appointed by said public officials provided those selected are knowledgeable of emergency 911 systems and the emergency needs of all local governments, businesses and citizens within the county:
(1) Sheriff;
(2) County fire chief;
(3) EMS director;
(4) 911 director;
(5) EMA director;
(6) City of Clarkesville governmental representative;
(7) City of Baldwin governmental representative;
(8) City of Cornelia governmental representative;
(9) Town of Alto governmental representative;
(10) City of Demorest governmental representative;
(11) Town of Mount Airy governmental representative;
(12) Town of Tallulah Falls governmental representative;
(13) County citizen.
(b) The 911 advisory board, at no time, shall exceed 13 appointed members;
and, such terms shall be for the public officials term of office, except each citizen shall serve for a three-year term.
(c) Members of the 911 advisory board shall not be compensated.
(Res. of 3-1-2004) Sec. 22-74. Officers.
The 911 advisory board shall elect a chairperson and vice-chairperson from within its membership, and the position of secretary shall be filled by the clerk of the county commission.
(Res. of 3-1-2004) Secs. 22-75—22-91. Reserved.
ARTICLE III. ROAD NAMES AND PROPERTY NUMBERS
Sec. 22-92. System established.
There is hereby established a uniform system for road naming and for numbering property and buildings on all roads, streets and public ways in the county; and all buildings shall be numbered in accordance with the provisions set forth in this chapter.
(Ord. No. 93-1, art. I, 3-1-1993) Sec. 22-93. Road naming.
The following shall apply to the naming of roads:
(1) No new road names shall duplicate or be similar, either phonetically or by spelling, to another road name in the county, regardless of the road name suffix (see subsection (c) of this section).
(2) Existing duplicate road names. Where necessary to maintain the order and uniformity sought by this article, existing duplicate road names may be changed by resolution of the board, upon receipt of recommendations from the planning commission and/or public hearing. All new road names shall be approved by the board of commissioners, with the exception of new subdivision roads and streets which is governed by the county subdivision regulations.
(3) A master list of the names, including pertinent suffixes, of all roads and streets within the county shall be maintained by the office of planning and development.
(Ord. No. 93-1, art. II, 3-1-1993) Sec. 22-94. Property numbering.
A uniform system of numbering properties and principal buildings is hereby adopted and made a part of this chapter:
(1) All buildings north of east/west roads and east of north/south roads shall bear even numbers, and likewise all buildings on the south side of east/west roads and west of north/south roads shall bear odd numbers.
Roads running more nearly north/south shall be numbered as north/ south roads and all roads running more nearly east/west shall be numbered as east/west roads.
(2) All numbers shall be assigned in a manner so agreed upon by the county and the U. S. Postal Service.
(3) Principal building or structure, shall have its own number. A building number shall be assigned for each separate unit.
(Ord. No. 93-1, art. III, 3-1-1993) Sec. 22-95. Assignment of numbers.
(a) Existing numbers shall be changed only where it is necessary in the judgment of the land development administrator in order to maintain the order and uniformity sought by this chapter.
(b) Effective upon the date of the ordinance from which this article is derived, the county office of planning and development shall begin assigning any and all developing structures located on any road, street or public way in the jurisdiction of this chapter its respective number under the uniform system provided for in this chapter. A copy of the correctly numbered plat will be returned to the developer as well as a copy being sent to the central dispatch office.
(c) Written notification of the proper address of each building shall be given to the owner, occupant or agent of each building in all instances where a new number is assigned under the terms of this chapter.
(Ord. No. 93-1, art. IV, 3-1-1993) Sec. 22-96. Placement of numbers.
(a) When each principal building or structure has been assigned its respective number, the owner, occupant or agent shall place or cause to be placed upon each principal building or structure controlled by him, the number assigned under the uniform system as provided in this article, or by the county's consultant.
(b) Such numbers shall be placed on existing principal building or structure within 45 days after the date of notification of proper number assignment.
(c) Each one-family and two-family dwelling unit shall have posted and maintained in a conspicuous place on the property, visible from the road or street providing general public access, the address of such dwelling unit in figures at least three inches high on a contrasting background that will allow 24-hour visibility.
(d) Each multifamily (three or more dwelling units) shall have posted and maintained in a conspicuous place on the building, visible from the parking lot or street providing general public access, the address or number of the building in figures of at least three inches high on a contrasting background and each individual apartment/unit within the building shall be marked on or about its main entrance with the individual apartment/unit number and/or address in figures at least three inches high on a contrasting background that will allow 24-hour visibility. In addition to the above, where a multifamily building has more than one exterior entrance, each such entrance shall be marked in figures at least three inches high on a contrasting background, with the number and/or address of each and every individual apartment/unit to which access is provided through that common entrance.
(e) Each business or other nonresidential building shall have posted and maintained in a conspicuous place on the property, visible from the street providing public access, the address of such building in figures at least four inches high on a contrasting background that will allow 24-hour visibility. If the numbers are not placed within 15 feet of the back of the street curbing or edge of street surface, then such figures shall be at least six inches high.
(f) Numbers shall be put in a conspicuous place immediately above, on or at the side of the proper door so that the number is clearly visible from the road or street line. In cases where the building or structure is situated more than 50 feet from the road or street line, the building number shall be placed near the walk, driveway, or common entrance to the building, and upon the front of mailbox, gate post, fence, curb or other appropriate place so as to be clearly visible from the road or street line. When the number is placed on the front of mailbox, the height of numbers may be reduced to 21/2 inches in height. Also, a double faced number sign may be used, and placed perpendicular to the road or street, when the building or structure is located more than 50 feet from the road or street line.
(g) Cost of numbers and installation shall be the responsibility of the property owners, except as provided in this article.
(Ord. No. 93-1, art. V, 3-1-1993) Sec. 22-97. Administration and implementation.
(a) Whenever any house, building or structure shall be erected or located in the area of the jurisdiction of this chapter after March 10, 1993, it shall be the duty of the land development administrator to inform any party applying therefore, of the number belonging to or embraced within the limits of any lot or property as provided in this chapter. In case of conflict as to the proper number to be assigned, the land development administrator shall determine the number of such principal building or structure.
(b) It shall be the duty of the owner to secure the correct number as designated by the office of planning and development for said property and attach said number so assigned on said building as provided by this chapter.
(c) A certificate of occupancy shall not be issued for any principal building or structure until the owner has obtained the assigned number from the office of planning and development.
(d) Final approval of any structure erected, repaired, altered or modified after the effective date of the ordinance from which this article is derived shall be withheld by the county building official until permanent and proper numbers have been attached or fastened to said structure.
(Ord. No. 93-1, art. VI, 3-1-1993) Secs. 22-98—22-150. Reserved.
ARTICLE IV. JOINT CITY/COUNTY GOVERNMENT ORDINANCE
REGARDING EMERGENCY MANAGEMENT
Sec. 22-151. Definitions.
[The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:]
Disaster means any natural, technological, civil emergency or threat thereof that causes or has the potential to cause damage of sufficient severity and magnitude to result in a declaration of a state of emergency declared by a county, the governor or the President of the United States.
Emergency means any natural or manmade event requiring the activation of the local emergency operations plan.
Emergency management means the preparation for the carrying out of all emergency functions other than functions for which military forces are primarily responsible to prevent, minimize, and repair injury and damage resulting from emergencies, energy emergencies, disasters, or the imminent threat thereof, of manmade or natural origin" ... "These functions include, without limitation, fire-fighting services; police services [public safety]; medical and health services; rescue; engineering; warning services; communications; defense from radiological, chemical, and other special weapons; evacuation of persons from stricken areas; emergency welfare services; emergency transportation; [nuclear. power] plant protection; temporary restoration of public service utility services; and other functions related to civilian protection, together with all other activities necessary or incidental to the preparation for and carrying out of the foregoing functions.
Local emergency management director means the person nominated by the local governments and appointed by the state emergency management director to implement the local emergency operations plan.
State emergency management director means the person appointed by the governor to head the Georgia Emergency Management Agency.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-152. Local organization for emergency management.
In agreement with the governing officials of the cities within the county, there is herby established the Habersham County Emergency Management Agency. The chairperson of the Habersham County Commissioners, with the concurrence of officials of the cities within the county, shall nominate, for appointment by the state emergency management director, a director of the Habersham County Emergency Management Agency. Upon appointment, the local emergency management agency director shall have direct responsibility for the organization, administration, and operations of the local organization for emergency management, subject to the direction and control of the executive officer or governing body and shall serve at the pleasure of such executive officer or governing body. When appointed, the local emergency management director is charged with the following duties:
(1) Represent the governing officials of the county on matters pertaining to emergency management.
(2) Assist local officials in organizing county departments for emergency operations.
(3) Develop, in conjunction with county and city departments, the Habersham County Emergency Operations Plan for emergency functions. Such plan will be in consonance with the Georgia Emergency Operations Plan and shall be submitted to the governing officials of Habersham County and the cities within the county for approval, and thence to the Georgia Emergency Management Agency for approval.
(4) Maintain the emergency management agency and carry out the day-today administration of the Habersham County emergency management program, including the submission of required reports, to the Georgia Emergency Management Agency.
(5) Submit reports as required by governmental officials in keeping with good management practices, e.g., financial, daily activities, etc.
(6) Obtain, with the authority of governing officials, a facility to be used as the Habersham County Emergency Operations Center.
(7) Coordinate the activities of the Habersham County emergency operating staff during periods of emergency, and under the supervision of Habersham County/cities governing officials.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-153. Habersham County Emergency Management Agency.
The Habersham County Emergency Management Agency shall be established around existing county and city departments. The emergency support functions, (ESFs) and department/agency assignments are as follows:
(Department/Agency assignment listed below are examples only. It is the responsibility of local governments to make assignments based upon local capabilities.)
Emergency Support Function (ESF) Department/Agency*
1. Transportation (P) County Road Dept.
(S) City Public Works
2. Communications (P) County 911/Dispatch
(S) City Police Department
3. Public works and engineering (P) County Road Dept
(S) City Public Works
4. Firefighting (P) County Fire Department
(S) City Fire Department
5. Emergency management (P) County Emergency Management Agency (Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-154. [Duties of chairperson.]
In the event of a manmade or natural disaster or any other emergency which may effect the lives and property of the citizens of Habersham County, the chairperson of the Habersham County Commissioners separately, or jointly with the Mayor of Alto, Baldwin, Clarkesville, Cornelia, Demorest, Mt. Airy and Tallulah Falls City(ies), or in their absence their legally appointed successors may determine that an emergency or disaster exists and thereafter shall have and may exercise for such periods as such emergency or disaster continues, the following powers:
(1) To appropriate and expend funds, execute contracts, and to obtain and distribute equipment, materials, and supplies for emergency management purposes;
(2) To provide for the health and safety of persons and property, including emergency assistance to the victims of any emergency or disaster resulting from manmade or natural causes or enemy attack and to direct and coordinate the development of emergency management plans and programs in accordance with the policies and plans set by the federal and state emergency management agencies;
(3) To appoint, employ, remove, or provide, with or without compensation, chiefs of services, warning personnel, rescue teams, auxiliary fire and police personnel, and other emergency management workers;
(4) To establish a primary and one or more secondary control centers to serve as command posts during an emergency or disaster;
(5) Subject to the order of the governor or the chief executive of the political subdivision, to assign and make available for duty the employees, property, or equipment of the subdivision relating to firefighting, engineering, rescue, health, medical and related services, and to police, transportation, construction, and similar items or services for emergency management purposes, within or outside of the physical limits of the subdivision;
(6) In addition to the heretofore stated powers and authorities, to acquire, temporarily or permanently, by purchase, lease, or otherwise, sites required for installation of temporary housing units for disaster victims;
and to enter into whatever arrangements, including purchase, of temporary housing units and payment of transportation charges, which are necessary to prepare or equip such sites to utilize the housing units.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-155. Volunteers.
All persons, other than officers and employees of Habersham County, performing emergency functions pursuant to this resolution/ordinance, shall serve with or without compensation. While engaged in such emergency functions, duly assigned volunteers shall have the same immunities as county officers and employees. Immunity does not apply in cases of willful misconduct, gross negligence or bad faith.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-156. Penalties.
Any person violating any provision of this chapter, rule, order or regulation made pursuant to this chapter shall, upon conviction thereof, be punished as provided for in section 1-7 herein.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-157. Liberality of construction.
This resolution/ordinance shall be construed liberally in order to effectuate its purpose.
(Ord. of 2-16-09, § 1(Exh. A)) Sec. 22-158. Effective date.
This resolution/ordinance is effective immediately and where the provisions of this resolution are in conflict with existing local laws, the provisions of this resolution/ordinance will govern and such provisions of existing laws which are in conflict, are hereby rescinded.
(Ord. of 2-16-09, § 1(Exh. A)) Secs. 22-159, 22-160. Reserved.
ARTICLE V. EMERGENCY MANAGEMENT*
DIVISION 1. GENERALLY
Sec. 22-161. Preamble, purpose, intent and enactment clause.
The health, safety and welfare of the citizens and property of Habersham County may be jeopardized during an emergency, disaster or imminent threat thereof, by the presence of looters, vandals, thieves and others who would take advantage of the confusion and devastation that accompanies such an event;
and The health, safety and welfare of the citizens and property of Habersham County may be jeopardized during an emergency, disaster or the subsequent recovery period by the inability for the local governing authority to act expediently without regard to certain formalities; and
The health, safety and welfare of the citizens of Habersham County depend upon the availability and affordability of certain essential goods, materials, services and housing; and
During and following periods of emergency resulting from natural or manmade disaster, the public is at risk from unscrupulous building contractors and repair services, scams and other unconscionable activities related to constructing, repairing, renovating and making improvements to buildings and other structures damaged during the disaster; and
The local governing authority of Habersham County is authorized pursuant to O.C.G.A. §§ 38-3-27(b)(2) and 38-3-28 to take actions necessary to provide for the health and safety of persons and property during periods of emergency or disaster, provided that such actions are not inconsistent with any orders, rules, or regulations promulgated by the governor or his delegatee; and The powers and functions exercised by the local governing authority necessary to conduct the business and affairs of Habersham County during an emergency or disaster proclaimed as such by the appropriate state official may continue without the regard to compliance with time consuming procedures and formalities pursuant to O.C.G.A. § 38-3-54; and
In accordance with O.C.G.A. §§ 36-10-4(c)(5) and 36-4-63(6), certain formalities concerning public works contracts may be waived when necessitated by emergency; and
The Habersham County Board of Commissioners believes that it is desirable to have legislation in place authorizing the board to waive certain formalities and procedures as necessary in case of emergency, natural disaster or the subsequent recovery period; and
The Habersham County Board of Commissioners believes that it is desirable to have legislation in place authorizing the board to enact a curfew when it is determined necessary to maintain order and to protect either the citizens or their property during an emergency or disaster in certain areas of the county.
The governing authority of Habersham County enacts the following article, divisions, and sections.
(Ord. of 3-22-2010, § 1(Exh. A)) Secs. 22-162—22-165. Reserved.
DIVISION 2. CURFEWS
Sec. 22-166. Institution of curfew.
(a) Upon the declaration of a state of emergency by the governor, or upon the determination by the county governing authority, or its designee, of the existence of an emergency or disaster, the county governing authority, its designee or the emergency interim successor may adopt a resolution instituting a curfew when it is determined necessary to protect and safeguard the people and property of Habersham County.
(b) All of the territory of the unincorporated county shall be subject to the terms of the curfew, unless otherwise specified in the resolution.
(c) The resolution instituting the curfew shall include the dates and hours that the curfew shall be in effect.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-115)) Sec. 22-167. Definitions.
(a) Curfew. A 'curfew' is a regulation requiring the withdrawal from any person not otherwise exempt from this article from appearing in certain public areas during specified hours.
(b) Exempt individuals. Unless otherwise specified in the resolution implementing the curfew, 'exempt individuals' include those individuals engaged in the provision of designated, essential services, such as fire, law enforcement, emergency medical services and hospital services, military services, utility emergency repairs. The resolution may, in the discretion of the governing authority, also exempt regular employees of local industries traveling to and from their jobs with appropriate identification, news media employees, building and repair contractors, properly registered according to Habersham County Ordinance No. ("Ordinance to Require Registration and Licensing of Building and Repair Services during a State of Emergency"), performing activities related to construction, repair, renovation or improvement of buildings and other structures damaged during the disaster or emergency.
(c) State of emergency. As defined by O.C.G.A. § 38-3-3(5), a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster, emergency, or energy emergency is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-116)) Sec. 22-168. Prohibition.
It shall be prohibited for any person, other than exempt individuals, to appear in public in the territory subject to the curfew, including but not limited to, streets, highways, alleys, sidewalks, vacant lots, parks, public buildings or any other public places in all or a delineated part of unincorporated Habersham County during the stated hours of the curfew.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-117)) Sec. 22-169. Penalties.
Any individual violating this article, upon conviction, shall be punishable as provided in chapter 1, section 1-7 herein.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-118)) Sec. 22-170. Severability.
If any section, paragraph, sentence, clause, phrase or word of this article is, for any reason, held to be unconstitutional, inoperative, or void by any court of competent jurisdiction, such holding shall not affect the remainder of this article.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-119)) Sec. 22-171. Effective date.
This article shall become effective upon adoption by the local governing authority of Habersham County.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-120)) Secs. 22-172—22-175. Reserved.
DIVISION 3. SUSPENSION OF CODE AND OTHER FORMALITIES
Sec. 22-176. Authority to waive procedures and fee structures.
(a) Meetings. Upon proclamation by the appropriate state official of an emergency or disaster of manmade or natural causes or enemy attack impending on or affecting Georgia or the United States, the affairs and business of Habersham County may be conducted at places other than the regular or usual place thereof, within or outside of Habersham County, when it is not prudent, expedient or possible to conduct business at the regular location. When such meetings occur outside of county, all actions taken by the local governing body shall be as valid and binding as if performed within Habersham County. Such meetings may be called by the presiding officer or any two members of the governing body without regard to or compliance with time-consuming procedures and formalities otherwise required by law.
(b) Purchasing and public works contracts. Upon the declaration of a state of emergency by the governor, or upon the determination by the county governing authority, or its designee, of the existence of an emergency or disaster, the county governing authority, their designee or the emergency interim successor may contract for public works without letting such contract out to the lowest, responsible bidder and without advertising and posting notification of such contract for four weeks; provided, however, that any public works contract entered into pursuant to this subsection shall be entered on the minutes of the county as soon as practical and the nature of the emergency described therein.
(c) Code enforcement. Upon the declaration of a state of emergency by the governor, or upon the determination by the county governing authority, or its designee, of the existence of an emergency or disaster, the county governing authority, their designee or the emergency interim successor may temporarily suspend the enforcement of the Code of Ordinances of Habersham County, or any portion thereof, where: (a) the emergency or disaster is of such nature that immediate action outside the Code is required; (b) such suspension is consistent with the protection of the public health, safety and welfare; and (c) such suspension is not inconsistent with any federal or state statutes or regulations.
(d) Fees. Upon the declaration of a state of emergency by the governor, or upon the determination by the county governing authority, or its designee, of the existence of an emergency or disaster, the county governing authority, their designee or the emergency interim successor may temporarily reduce or suspend any permit fees, application fees or other rate structures as necessary to encourage the rebuilding of the area impacted by the disaster or emergency.
(e) Temporary dwellings. Upon the declaration of a state of emergency by the governor, or upon the determination by the county governing authority, or its designee, of the existence of an emergency or disaster, the county governing authority, their designee or the emergency interim successor may issue temporary mobile home, trailer, recreational vehicle or other temporary dwelling structures or parks in any zoning district while the primary dwelling is being repaired provided that such temporary dwellings or parks are designed by an engineer and the plans are approved by the Habersham County Health Department and Habersham County Building and Inspections Department. The temporary permit shall not exceed six in duration. In the case of continuing hardship and in the discretion of the governing authority or its designee, the permit may be extended for a period for an additional six months.
Upon expiration of the temporary permit or an extension, the temporary dwelling shall be removed.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-140)) Sec. 22-177. Definitions.
(a) Fees. Any fee or rate charged by the county for building permits, land disturbance permits, zoning applications, special land use permits, temporary land use permits, and other fees relating to the reconstruction, repair and clean up of areas impacted by the disaster or emergency. "Fees" shall not include those fees collected by the county on behalf of the federal or state government or those fees charged by the county pursuant to a federal or state statute or regulation.
(b) State of emergency. As defined by O.C.G.A § 38-3-3(5), a condition declared by the governor when, in his judgment, the threat or actual occurrence disaster, emergency, or energy emergency is of sufficient severity and magnitude to warrant extraordinary efforts in preventing or alleviating the damage, hardship, or suffering threatened or caused thereby.
(c) Subsequent recovery period. The period of time that the disaster emergency continues to cause disruptions in the area impacted by the disaster emergency. The "subsequent recovery period" shall not exceed six months the state of emergency declaration by the governor is terminated unless extended by official action of the governing authority of Habersham County.
(d) Temporary dwelling. Any mobile or easily movable home, trailer recreational vehicle or structure not otherwise permitted by the zoning regulations a particular zoning district.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-141)) Sec. 22-178. Severability.
If any section, paragraph, sentence, clause, phrase or word of this article is, for any reason, held to be unconstitutional, inoperative, or void by any competent jurisdiction, such holding shall not affect the remainder of this article.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-142)) Sec. 22-179. Effective date.
This article shall become effective upon adoption by the local governing authority of Habersham County.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-143)) Secs. 22-180—22-185. Reserved.
DIVISION 4. OVERCHARGING FOR GOODS, MATERIAL, SERVICES
AND HOUSING
Sec. 22-186. Overcharging prohibited.
In order to preserve, protect, or sustain the life, health, or safety of persons or their property, it shall be unlawful during the duration of a state of emergency or subsequent recovery period in which Habersham County has been designated as a disaster area, for any person, firm, or corporation located or doing business in Habersham County to overcharge for any goods, materials, services or housing sold within the county.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-164)) Sec. 22-187. Definitions.
(a) Overcharging. The term "overcharging" is defined as charging prices for goods, materials, services, or housing which are substantially in excess of the customary charges or in applicable cases substantially in excess of the supplier's or provider's costs for such goods, materials, services or housing.
The existence of overcharging shall be presumed from a substantial increase in the price at which the goods, materials, services, or housing was offered in the usual course of business immediately prior to the onset of the emergency, but shall not include increases in costs to the supplier directly attributable to higher costs of materials, supplies, and labor costs resulting from the emergency.
(b) State of emergency. The term "state of emergency" is defined, pursuant to O.C.G.A. § 38-3-3(5), as a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster or emergency is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.
(c) Subsequent recovery period. The term "subsequent recovery period" is defined as that period during which the disaster continues to cause disruptions in the disaster area, but shall not exceed six months after the emergency declaration has been terminated by the governor unless extended by official action of the governing authority of Habersham County.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-165)) Sec. 22-188. Penalties.
Violation of the provisions of this article upon conviction shall be punishable as provided in chapter 1, section 1-7 herein. Each sale shall constitute a separate offense.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-166)) Sec. 22-189. Severability.
If any section, paragraph, sentence, clause, phrase or word of this article is for any reason held by the court to be unconstitutional, inoperative, or void, such holding shall not the remainder of the article.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-167)) Sec. 22-190. Effective date.
This article shall take effect on the date of its being duly adopted but shall be operative only during the period of a declared state of emergency and any subsequent recovery periods.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-168)) Secs. 22-191—22-195. Reserved.
DIVISION 5. REGISTRATION OF BUILDING AND REPAIR
CONTRACTORS
Sec. 22-196. Building contractor registration required.
No person, firm, partnership, corporation or other entity shall engage in, undertake or carry on any business in whole or in part within the unincorporated areas of Habersham County, consisting of or relating to building, constructing, repairing, renovating or making improvements to real property including dwellings, homes, buildings, structures, or fixtures attached thereto without having registered the name of the business with the governing authority of the county and having paid fees as provided by this article.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-190)) Sec. 22-197. Definitions.
(a) Building contractor. As used in this article the word or term "building contractor" shall mean any person, firm, partnership, corporation or other entity engaging in, undertaking or carrying on any business consisting of or relating to building construction, repair, and renovation or making improvements to real property including dwellings, homes, buildings, structures, or fixtures attached thereto.
(b) Doing business. Any building contractor shall be deemed to be "doing business" subject to the requirements of this article if: (a) he has or operates an office, agency, project site or place of business located in the unincorporated areas of the county, whether permanently, temporarily, periodically, or otherwise, that provides the following activities in the unincorporated areas of the county expressly including but not limited to the construction, renovation or repair of dwellings or buildings or the making of improvements to real property or any fixtures attached thereto; or (b) he performs the following activities or services in the unincorporated areas of the county expressly including but not limited to the construction, renovation or repair of dwellings or buildings or the making of improvements to real property or any fixtures attached thereto regardless of the location of the principal office.
(c) State of emergency. The term "state of emergency" is defined, pursuant to O.C.G.A. § 38-3-3(5), as a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster or is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.
(4) Subsequent recovery period. The term "subsequent recovery period" is defined as that period during which the disaster continues to cause disruptions in the disaster area, but shall not exceed three months after the emergency declaration has been terminated by the governor.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-191)) Sec. 22-198. Registration; certification.
All building contractors doing business or proposing to do business in the unincorporated areas of Habersham County during a state of emergency or the subsequent recovery period shall register and file applications with the clerk of the governing authority of the county or such other person designated by the governing authority at the county courthouse or such other place or places designated by the county. The building contractor shall, under oath, provide the county governing authority with a statement describing the general nature of the business to be conducted and give true and correct information as may be called for on the registration form, application or certificate provided by the county.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-192)) Sec. 22-199. Registration fees.
Building contractor registration fees are hereby fixed under the terms and conditions of this article at $50.00 per annum. Registration fees shall be paid in full at the time of issuance of the registration certification.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-193)) Sec. 22-200. Penalties.
Any building contractor required by this article to pay a registration fee who engages in business without first registering and receiving a registration certification from the county as required shall be in violation of this article.
Violation of this article, upon conviction, shall be punishable as provided in chapter 1, section 1-7 herein. Each day a building contractor does business in the unincorporated areas of the county without complying with this article shall constitute a separate offense.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-194)) Sec. 22-201. Transferability.
Each certification issued under this article is granted to, and shall be accepted by, the building contractor under the condition that the same is not transferable and after issuance no such certification shall be transferred by the county or the building contractor to another individual or entity.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-195)) Sec. 22-202. Display of registration certification.
Each certification issued hereunder shall be posted conspicuously by the building contractor in the place of business of the building contractor or shall be carried on his person or vehicle used in such business. Such certification shall be exhibited to any authorized enforcement officer when so requested.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-196)) Sec. 22-203. Revocation; suspension.
Each certification granted under this article is a mere permit to engage in the business only so long as said business is conducted in a lawful manner. The county governing authority hereby reserves the right to revoke or suspend any certification granted hereunder, if the building contractor, or the building contractor's agent or employee acting within the scope of his employment, violates this article or any other county, state or federal law. If after issuance of a certification, the county desires to revoke such certification, written notice thereof shall be given to the building contractor, which notice shall specify the violation with which the building contractor is charged and a date, time and place at which a hearing shall be held with regard to the violation. The building contractor shall have an opportunity to be heard at such hearing, shall have the right to be represented by counsel, and shall have the right to introduce and submit evidence in opposition to such revocation.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-197)) Sec. 22-204. Severability.
If any section, paragraph, sentence, clause, phrase or word of this article is for any reason held by the court to be unconstitutional, inoperative, or void, such holding shall not affect the remainder to the article.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-198)) Sec. 22-205. Effective date; expiration.
This article shall take effect on the date of its being duly adopted and shall apply to all building contractors doing business in the unincorporated areas of Habersham County on that date and doing business on any date thereafter.
However, this article and any certification issued pursuant to it shall be operative only during the period of a declared state of emergency and any subsequent recovery periods.
(Ord. of 3-22-2010, § 1(Exh. A, § 22-199)) Secs. 22-206—22-219. Reserved.
Chapters 23—25
RESERVED
Chapter 26
ENVIRONMENT
ARTICLE I. IN GENERAL
Secs. 26-1—26-18. Reserved.
ARTICLE II. SOIL EROSION, SEDIMENTATION AND POLLUTION
CONTROL*
Sec. 26-19. Title.
This article will be known as Habersham County Soil Erosion, Sedimentation and Pollution Control Ordinance.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-20. Definitions.
The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:
Best management practices (BMPs): These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board: The Board of Natural Resources.
Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified Personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission: The Georgia Soil and Water Conservation Commission
(GSWCC).
CPESC: Certified professional in erosion and sediment control with current certification by EnviroCert, Inc. which is also referred to as CPESC or CPESC, Inc.
Sec. 26-21. Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following
(1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, The Georgia Surface Mining Act of 1968.
(2) Granite quarrying and land clearing for such quarrying;
(3) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
(4) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph;
provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.
§ 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 100 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 100 horizontal feet, but the director may giant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of subsection (b) of O.C.G.A. § 12-7-6 and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;
(5) Agricultural operations as defined in O.C.G.A. § 1-3-3, definitions, to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in paragraphs (15) and (16) of section 26-22(c) of this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(7) Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture;
(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, state waters excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round;
provided, however, that any person responsible for a project which involves less than one (1) acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs (1)—(7), (9) or (10) of this section;
(9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the Georgia Highway Authority, or the State Road and Tollway Authority;
or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or the State Road and Tollway Authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1;
except where the department of transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(10) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A.
§ 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power;
except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United states engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(11) Any public water system reservoir.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-22. Minimum requirements for erosion, sedimentation and pollution control using best management practices.
(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES general permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimenta-tion and pollution control measures and practices shall conform to the minimum requirements of subsections (b) and (c). The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this article and the NPDES general permit.
(b) Minimum requirements/ BMPs:
(1) Best management practices as set forth in subsections (b) and (c) shall be required for all land-disturbing activities. Proper design, installa-tion, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection (f) of O.C.G.A. § 12-5-30, the "Georgia Water Quality Control Act." As used in this subsection the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6 subsection (b).
(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to subsection (f) of O.C.G.A.
§ 12-5-30, the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to subsection (f) of O.C.G.A. § 12-5-30, the Georgia Water Quality Control Act, for each day on which such failure occurs.
(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.
(5) The LIA may set more stringent buffer requirements than stated in (c)
(15) and (16), in light of O.C.G.A. § 12-7-6 (c).
(c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion;
(2) Cut-fill operations must be kept to a minimum;
(3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(6) Disturbed soil shall be stabilized as quickly as practicable;
(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(9) To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A.
§ 12-7-1 et seq.;
(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(11) Cuts and fills may not endanger adjoining property;
(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in subsection (b)(2);
(15) Except as provided in paragraph (16) of this subsection, there is established a 25 foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along any ephemeral stream. As used in this provision, the term ephemeral stream means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the Georgia Water Quality Control Act, shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence. When such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream;
cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines; and
(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of Title 12, the Georgia Water Quality Control Act, except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream;
cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) Stream crossings for water lines; or (ii) Stream crossings for sewer lines.
(d) Nothing contained in O.C.G.A. § 12-7-1 et seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsections (b) and (c).
(e) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-23. Application; permit; process.
(a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. Habersham County shall review the tract to be developed and the area surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this article, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of Habersham County. However, the owner and/or operator are the only parties who may obtain a permit.
(b) Application requirements:
(1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Habersham County without first obtaining a permit from the planning and development department to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
(2) The application for a permit shall be submitted to the planning and development department and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in section 26-22(c) of this article. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land disturbing activity proposed will be carried out in such a manner that the provisions of subsections (b) and (c) will be met. Applications for a permit will not be accepted unless accompanied by one copy of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-10.
(3) In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. § 12-5-23, provided that such fees shall not exceed $80.00 per acre of landdisturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to subsection (a) of O.C.G.A. § 12-7-8 half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to paragraph (9) or (10) of O.C.G.A. § 12-7-17 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction. A fee, in the amount published on a fee schedule by the Habersham county commissioners shall be charged for each acre or any fraction thereof in a project area. Regardless of the acreage disturbed, all commercial and industrial sites will be required to obtain a land disturbing permit.
(4) Immediately upon receipt of an application and plan for a permit, Habersham County shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to Habersham County. No permit will be issued unless the plan has been approved by the district, and any variances required by subsections (c)
(15) and (16) have been obtained, all fees have been paid, and bonding, if required as per subsection (b)(6), have been obtained. Such review will not be required if Habersham County and the district have entered into an agreement which allows Habersham County to conduct such review and approval of the plan without referring the application and plan to the district. Habersham County with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of Habersham County with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
(5) If a permit applicant has had two or more violations of previous permits, this article section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing the application under consideration, Habersham County may deny the permit application.
(6) Habersham County may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, Habersham County may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of Habersham County with respect to alleged permit violations.
(c) Plan requirements.
(1) Plans must be prepared to meet the minimum requirements as contained in section 26-22(b), (c) of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this article. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws, maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
(d) Permits.
(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by Habersham County of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
(2) No permit shall be issued by Habersham County unless the erosion, sedimentation and pollution control plan has been approved by the district and Habersham County has affirmatively determined that the plan is in compliance with this article, any variances required by Section subsections (c)(15) and (16) are obtained, bonding requirements, if necessary, as per subsection (b)(6) are met and ail ordinances and rules and regulations in effect within the jurisdictional boundaries of Habersham County are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(5) The permit may be suspended, revoked, or modified by Habersham County, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(6) The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7 (f)(1).
(7) No permit shall be interpreted to relieve any person of the responsibility of maintaining full compliance with all codes, ordinances, and other regulations of Habersham County. Any permit issued in error or in contradiction to the provisions of an adopted code, ordinance, or regulations of Habersham County shall be considered to have been null and void upon its issuance.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-24. Inspection and enforcement.
(a) The planning and development department will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, Habersham County shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article.
(b) Habersham County must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.
(c) The planning and development department shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this article, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
(d) No person shall refuse entry or access to any authorized representative or agent of Habersham County, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
(e) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(f) The division may periodically review the actions of Habersham County which have been certified as local issuing authorities pursuant to O.C.G.A.
§ 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a Habersham County's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify Habersham County in writing.
Habersham County is so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority.
If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of Habersham County as a local issuing authority.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-25. Penalties and incentives.
(a) Failure to obtain a permit for land-disturbing activity. If any person commences any land-disturbing activity requiring a land-disturbing permit as prescribed in this article without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of Habersham County.
(b) Stop-work orders.
(1) For the first and second violations of the provisions of this article, the director or Habersham County shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or Habersham County shall issue a stop-work order requiring that landdisturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or Habersham County shall issue an immediate stop-work order in lieu of a warning;
(2) For a third and each subsequent violation, the director or Habersham County shall issue an immediate stop-work order; and;
(3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by Habersham County or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by Habersham County or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to ail land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
(c) Bond forfeiture. If, through inspection, it is determined that a person engaged in land-disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 26-23(b)(6). Habersham County may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
(d) Monetary penalties.
(1) Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to this article, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this article shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this article, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article under county ordinances approved under this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
(2) Any person convicted by a court of competent jurisdiction of violating any provision of this article shall be guilty of violating a duly adopted ordinance of Habersham County and shall be punished either by a fine not to exceed $2,500.00, per day, or by a sentence of imprisonment not to exceed 60 days in jail, or both a fine and jail or work alternate. Each day during which the violation or failure or refusal to comply continues shall constitute a separate violation. The owner of any lands or parts thereof, where anything in violation of this article shall be placed or shall exist, and each responsible party or other person assisting in the commission of any such violation, shall be guilty of a separate offense.
(3) a. There shall be a minimum penalty of $250.00 per day for each violation involving the construction of a single-family dwelling by or under contract with the owner for his or her own occupancy; and
b. There shall be a minimum penalty of $1,000.00 per day for each violation involving land disturbing activities other than as provided in subsection a.
1. The court shall have the power and authority to order the violation corrected in compliance with the requirements of this article and the court may require payment of restitution or impose other punishment allowed by law.
2. In any case in which any land is, or is proposed to be, used or activities are undertaken in violation of this article or any amendment thereto adopted by the board of commissioners,
the county, in addition to other remedies provided by law, may petition for a restraining order, injunction, abatement, or take any other appropriate legal action or proceeding through a court of competent jurisdiction to prevent, restrain, or abate such unlawful use or activity.
3. Issuance of certificates. Certificates of development conformance (CDC), certificates of occupancy (CO) or certificates of completion (CC) shall not be issued for any building unless all erosion control measures as shown on the approved plans and or BMP's shall have been completed in accordance with this article, and stabilization achieved.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-26. Education and certification.
(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
(b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.
(d) If a state general permittee who has operational control of landdisturbing activities for a site has met the certification requirements of paragraph (1) of subsection (b) of O.C.G.A. § 12-7-19, then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in paragraph (4) of subsection (b) of O.C.G.A.
§ 12-7-19 and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-27. Administrative appeal judicial review.
(a) Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by Habersham County upon finding that the holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions;
or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the Habersham County planning commission within 31 days after receipt by the local issuing authority of written notice of appeal.
(b) Judicial review. Any person, aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal denovo to the superior court of Habersham County.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Sec. 26-28. Liability.
Liability.
(1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.
(2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(3) No provision of this article shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.
(Ord. of 12-19-2016, § 1; Ord. of 9-17-2018, § 1) Secs. 26-29—26-50. Reserved.
ARTICLE III. OUTDOOR LANDSCAPE WATERING
Sec. 26-51. Restriction on outdoor water of landscape.
Outdoor watering for purpose of planting, growing, managing, or maintaining ground covers, trees, shrubs, or other plants in the unincorporated area may occur only between the hours of 4:00 p.m. and 10:00 a.m.; provided, however, that this limitation shall not create any limitation upon the following outdoor water uses:
(1) Commercial raising, harvesting, or storing of crops; feeding, breeding, or managing livestock or poultry; the commercial production or storing of feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, ratties, and turkeys; producing plants, trees, fowl, or animals; or the commercial production of aquacultural, horticultural, dairy, livestock, poultry, eggs, and apiarian products or as otherwise defined in
O.C.G.A. § 1-3-3;
(2) Capture and reuse of cooling system condensate or stormwater in compliance with applicable Habersham County ordinances and state guidelines;
(3) Reuse of graywater in compliance with O.C.G.A. § 31-3-5.2 and applicable local board of health regulations;
(4) Use of reclaimed wastewater by a designated user from a system permitted by the Environmental Protection Division of the Georgia Department of Natural Resources to provide and reclaim wastewater;
(5) Watering personal food gardens;
(6) Watering new and replanted plant, seed, or turf in landscapes, golf courses, or sports turf fields during installation and for a period of 30 days immediately following the date of installation;
(7) Drip irrigation or irrigation using soaker hoses;
(8) Hand watering with a hose with automatic cutoff or handheld container;
(9) Use of water withdrawn from private water wells or surface water by an owner or operator of property if such well or surface water is on said property;
(10) Watering horticultural crops held for sale, resale, or installation;
(11) Watering athletic fields, golf courses, or public turf grass recreational areas;
(12) Installation, maintenance, or calibration of irrigation systems; or
(13) Hydroseeding.
(Ord. of 1-3-2011) Sec. 26-52. Enforcement.
(a) No person shall use or allow the use of water in violation of the restrictions on outdoor water use contained in this article.
(b) The Habersham County Code Enforcement shall be the enforcement authority for this article. The county manager may also authorize other departments as may be deemed necessary to support enforcement.
(c) Criminal and alternative penalties. Any violation of this article may also be enforced by a citation or accusation returnable to the magistrate court or by any other legal means as set forth in this Code.
(Ord. of 1-3-2011) Chapter 27
RESERVED
Chapter 28
SCHEDULE OF FEES
Sec. 28-01. Schedule of fees.
A schedule of fees charged by the county for building permits, development services, plumbing permits, electrical permits, mechanical permits, animal control fees, recreational fees, occupational taxes, alcohol taxes and other applicable fees as set forth in the Habersham County Code of Ordinances, and any update or amendment thereto, shall be adopted by resolution of the board of commissioners. The board of commissioners shall review the schedule of fees annually for reasonableness during the county's budgetary process to determine if any adjustment to the schedule of fees is necessary to reflect actual costs of services provide by the county. The county clerk shall maintain the schedule of fees and make it available to the public upon request. The schedule of fees shall also be made available electronically on the county website.
(Ord. of 7-16-2018, § 1) Sec. 28-02. Amendments.
This chapter may be amended from time to time by resolution of the board of commissioners and all persons, businesses, occupations, trades and uses subject to this chapter shall be subject to such amendment.
(Ord. of 7-16-2018, § 1) Chapter 29
RESERVED
Chapter 30
FIRE PREVENTION AND PROTECTION
ARTICLE I. IN GENERAL
Secs. 30-1—30-18. Reserved.
ARTICLE II. OPEN BURNING*
Sec. 30-19. General requirements.
(a) All burning operations shall comply with "Rules for Air Quality Control." See regulations of Chapter 391-3-1 as written and amended by the Environmental Protection Division, Air Protection Branch unless specifically amended by this article.
(1) All hand piled natural vegetation permits are issued through georgiaburnpermits.com unless specified otherwise below.
(2) All machine piled natural vegetation permits are issued through the Georgia Forestry Commission (GFC) at 706-754-2354.
(b) No person shall cause, suffer, allow, or permit open burning in any area of the County except as follows:
(1) Agricultural fires (permit/no fee). Carrying out recognized agricultural procedures necessary for production or harvesting of crops. Contact Georgia Forestry prior to burning at 706-754-2354.
Sec. 30-20. Open burning on privately owned, residential property maintenance.
Homeowners or residents of single-family residential property are authorized to have open fires provided all the following requirements are met. All permits are required through georgiaburnpermits.com for this section. The 5 STAR safety standards must be followed.
(a) The fire must be on the property occupied by the person receiving the permit.
(b) Only natural vegetation can be destroyed by burning. The term "natural vegetation" includes sticks, tree parts six inches and less in diameter, grass, pine straw, hedge trimmings, etc. Burning of poison oak, poison ivy and any other vegetation, which produces severe respiratory damage, is not allowed. Hand piled only. Burning of cardboard, treated wood, materials containing petroleum products, i.e., tires, plastics, wire insulation, roofing shingles, etc., is not allowed.
(c) No vegetation pile shall be larger than six feet in diameter by four feet in height.
(d) There shall be a minimum of ten feet between vegetation piles.
(e) No burning is allowed within 50 feet of a structure.
(f) No burning is allowed within 25 feet of a wooded area, pine island, or other lightweight Class A fuel.
(g) No fire shall be within 25 feet of the adjacent property line.
(h) All open fires shall be constantly attended by a competent person 18 years of age or older to monitor and control such burning. A rake, shovel, or similar hand tool or land clearing machinery should be on-site to help control the fire if it were to get out of control. If possible or where available a charged water hose that will reach the most remote point of the burn should be used.
(i) No more than two burning piles are allowed at any one time.
(j) Failure to comply with these rules which results in an uncontrolled fire or a valid complaint by a nearby property owner or resident that requires the response of Habersham County Emergency Services, GFC or one of the city fire departments will result in the fire being extinguished immediately and may result in a fine being issued to the responsible party.
(Ord. of 1-27-2025, § 1) Sec. 30-21. Construction site burning.
(a) Only small warming fires using natural vegetation are allowed. These fires are to be in a metal container such as a clean 55-gallon metal drum or on bare ground with a noncombustible boarder to contain the fire.
(b) Fires incidental to the construction operation, i.e., tar kettle, welding torch, etc., are allowed.
(c) The developer/general contractor/landowner in control of the property is responsible for compliance with this article and the rules established by
EPA/EPD.
(Ord. of 1-27-2025, § 1) Sec. 30-22. Land clearing or right-of-way burning.
Permits for agricultural, land clearing or right-of-way burning in other than predominately residential areas will be issued if all the following conditions are met:
(a) Agriculture. Permits may be issued for open burning of agricultural land such as the burning of pastureland or hay fields and will be required by Georgia Forestry prior to burning at 706-754-2354.
(b) Land clearing and right-of-way burning. Permits required by Georgia Forestry prior to burning at 706-754-2354.
(1) Prevailing winds at the time of the burning are away from the major portion of the area's population.
(2) The location of the burning is not within 1,000 feet from any structure or not within 300 feet of any street, road, or highway open to the public.
(3) The amount of dirt on or in the material being burned is minimal.
(4) Petroleum oils, asphaltic materials, items containing natural or synthetic rubber, or any material other than plant growth are not being burned.
(5) The company/contractor/landowner in control of the property is responsible for compliance with the requirements of this article and the rules established by EPA/EPD.
(6) All open fires shall be constantly attended by a competent person 18 years of age or older to monitor and control such burning. A rake, shovel, similar hand tool, or land clearing machinery should be on-site to help control the fire if it were to get out of control. If possible or where available a charged water hose that will reach the most remote point of the burn should be used.
(Ord. of 1-27-2025, § 1) Sec. 30-23. Enforcement.
(a) All fire certified employees of Habersham County Emergency Services shall be responsible for the enforcement of this article.
(b) The chief officers shall be authorized to issue a citation returnable to Magistrate Court for violation of this or any other fire safety ordinance adopted by the Board of Commissioners.
(c) The Sheriffs Department, DNR and/or GFC may also be contacted for further enforcement or violations as Habersham County Emergency Services Chief Officers determine the severity of the offense.
(Ord. of 1-27-2025, § 1) Secs. 30-24—30-30. Reserved.
ARTICLE III. FIRE ALARMS
Sec. 30-31. Administration and enforcement.
Habersham County Emergency Services shall be responsible for the administration and enforcement of this chapter.
(Ord. of 2-17-2025) Sec. 30-32. Definitions.
For the purposes of this chapter, the following words and phrases shall have the meanings given:
Alarm company means any corporation, partnership, business or individual, licensed by the State of Georgia, engaged in the business or the installation, maintenance, alteration, servicing, or monitoring of an alarm system or which responds to such alarm systems.
Alarm response means any response to a premises by Habersham County Emergency Services because of an alarm signal received by Habersham County 9-1-1 or Habersham County Emergency Services.
Alarm signals mean the activation of an alarm system resulting in a request for an alarm response regardless of cause.
Alarm user means any person, firm, partnership, association, corporation, company or organization of any kind who or which purchases, leases, contracts for, or otherwise obtains an alarm system, or the servicing, maintenance or monitoring of an alarm system from an alarm company.
An alarm system means any assembly of equipment, mechanical or electrical, designed to signal an occurrence of fire, smoke, heat, or water application, or any other circumstances requiring urgent attention and to which Habersham County Emergency Services personnel are expected to respond.
Automatic dialing device means a device which is interconnected to a telephone line and is programmed to dial a predetermined telephone number, and which automatically transmits by recorded voice message or signal the existence of a hazard requiring urgent attention and to which firefighters are expected to respond.
Combination system means an alarm system that includes both security protection and fire detection in the same system.
County means Habersham County, Georgia.
False alarms mean any signal of fire, heat, smoke or water application, or any other circumstance when there exists no actual or threatened emergency to which Habersham County Emergency Services personnel are expected to respond.
Fire alarm code means the currently enforced fire code for Habersham County. It is the responsibility of all alarm companies to be aware of the currently enforced code for Habersham County.
Governing authority means the Board of Commissioners of Habersham County, Georgia.
Habersham County Emergency Services means Habersham County Emergency Services or other government department as requested by Habersham County Emergency Services to render aid.
Nonrequired system means a fire alarm system installed in an occupancy in which the Fire Code of Habersham County does not require said system to be installed.
Person means any individual, group of persons, firm, partnership, association of any kind, company or corporation.
Protected premises means the premises upon which an alarm system has been placed for the purpose of detecting a hazard.
Required system means a fire alarm system installed in an occupancy in which the current Fire Code of Habersham County requires said system be installed.
(Ord. of 2-17-2025) Sec. 30-33. Operation and maintenance; transmission.
Alarm companies, alarm users or individuals transmitting alarm signals are responsible for keeping their alarm system in good working order and repair and the county shall have no obligation with respect thereto.
(Ord. of 2-17-2025) Sec. 30-34. Intentional false alarms are prohibited.
It shall be unlawful for any person to knowingly activate an alarm system to summon Habersham County Emergency Services when there is no actual or threatening need for the immediate assistance of Habersham County Emergency Services.
(Ord. of 2-17-2025) Sec. 30-35. Automatic dialing device restrictions.
It shall be unlawful for any person to install, operate or maintain any automated dialing device which is programmed to transmit a prerecorded message or code signal directly to Habersham County 9-1-1 or Habersham County Emergency Services as an alarm signal.
(Ord. of 2-17-2025) Sec. 30-36. Required equipment.
(a) An alarm system operated within the jurisdiction of the governing authority should be equipped in such a manner to prevent false alarms due to interruptions in electrical power.
(b) After the effective date of this chapter, all combination systems installed as a nonrequired system in single-family residences shall not include an outside sounder that is audible beyond the confines of the premises.
(c) After the effective date of this chapter, it shall be the responsibility of the alarm company on all new alarm systems to post on the alarm panel the name and 24-hour contact information for the company responsible for servicing the alarm system as well as the contact information for the alarm company responsible for monitoring the alarm system if it is different from the servicing company. Further it shall be the responsibility of the alarm company to update this information on existing systems at any time the alarm system is serviced.
(Ord. of 2-17-2025) Sec. 30-37. Information not to be disclosed.
Any information supplied to Habersham County 9-1-1 or Habersham County Emergency Services pursuant to this chapter shall be held in confidence by all employees or representatives of the governing authority with access to such information. Because all alarm registration information is considered sensitive public safety information, the same shall not be available to the public, unless otherwise required by law.
(Ord. of 2-17-2025) Sec. 30-38. Excessive alarm responses are prohibited.
(a) It shall be unlawful for any alarm user in the jurisdiction of the governing authority to allow an excessive number of alarm responses to occur at a protected premises for which the alarm user is responsible.
(b) After an initial 30 day notice period or three violations, whichever first occurs, additional alarm responses to a protected premises in any consecutive 12-month period are deemed to be an excessive number and shall be subject to a $250.00 administrative fee sanction for each additional violation thereafter. However, upon a sixth additional violation, the administrative fee sanction shall increase to $500.00 per violation. Violations in excess of ten violations within any 12-month period shall be subject to an administrative fee sanction of $1,000.00 per occurrence.
(c) If an alarm user shows to the satisfaction of Habersham County Emergency Services representative that the false alarm was not the result of the negligence or improper maintenance by the alarm user, the administrative fee sanction as specified in section 30-40 of this chapter may be waived.
(d) Habersham County Emergency Services personnel assigned to incidents which are determined to be an alarm response shall, whenever possible, leave written notice for the alarm user which provides the following information.
(1) Date and time of alarm response.
(2) Habersham County Emergency Services contact information including phone number.
(3) A brief synopsis of the fire alarm ordinance.
(Ord. of 2-17-2025) Sec. 30-39. Inspection of alarm systems.
An alarm user with an alarm system in violation of section 30-38 of this chapter shall cause their alarm system to be inspected by an alarm company licensed to conduct business as an alarm company. The inspection shall entail a complete examination of the alarm system including, but not limited to, satisfactory design and installation of the equipment, proper functioning of the equipment and user education in the operation of the equipment. The alarm company shall record the details of the inspection and make such a record available to the alarm user. Notification of the requirements of this section for an inspection shall be made by Habersham County Emergency Services in writing, within 30 days of the violation, to the registered alarm user. The completed inspection report from an alarm company shall be returned to Habersham County Emergency Services by the alarm user within 30 days of the initial notification of the violation by Habersham County Emergency Services.
(Ord. of 2-17-2025) Sec. 30-40. Noncompliance with inspection.
If Habersham County Emergency Services does not receive a written completed inspection report within 30 days of the notification as provided in section 30-39, an administrative service fee for noncompliance with the inspection report request as specified in the fire alarm fee schedule adopted by the governing authority as part of its annual fee schedule adoption in accordance with Chapter 28 hereof shall be assessed against the alarm user.
(Ord. of 2-17-2025) Sec. 30-41. Subsequent violations.
If within 12 months of the notification provided in section 30-39 of this chapter, there are more than two alarm responses to a protected premise, excessive alarm response fees shall be assessed against the user for all subsequent alarm responses as specified in the fire alarm fee schedule adopted by the governing authority as part of its annual fee schedule adoption in accordance with Chapter 28 hereof.
(Ord. of 2-17-2025) Sec. 30-42. Appeals.
(a) The Habersham County, Georgia Board of Commissioners shall hear the appeal upon request of any alarm company or alarm user adversely affected by any decision of the Habersham County Emergency Services.
(b) Appeals to the Habersham County Board of Commissioners shall be filed in writing with the Clerk of the Habersham County Board of Commissioners within three days from the date of service of written notice of a decision adversely affecting an alarm user of an alarm company.
(c) Failure to file an appeal within such three-day period shall constitute a waiver of the right to such an appeal.
(d) The decision of the Habersham County Board of Commissioners shall be final.
(Ord. of 2-17-2025) Sec. 30-43. Immunity.
Nothing in this chapter is intended to, nor will it, create a contract, duty or obligation, either expressed or implied, of response. All liability and consequential damage resulting from the failure to respond to a notification is hereby disclaimed and governmental immunity as provided by law is retained. By notification of an alarm system, the alarm user acknowledges that the Habersham County response may be influenced by factors such as:
the availability of emergency units, priority of calls, weather conditions, traffic conditions, staffing levels and prior response history.
(Ord. of 2-17-2025) Sec. 30-44. Penalties.
Any person, firm, corporation, association or partnership violating any provision of this chapter as the same exists or as it may hereinafter be amended, or shall fail to do anything required by this chapter as the same exists or as it may hereafter be amended, shall be guilty of a misdemeanor, amenable to the process of the magistrate or state court of Habersham County, and upon conviction, shall be subject to a fine not to exceed $1,000.00 for each violation in the discretion of the court. Each day such violation is committed or permitted to continue shall constitute a separate offense and shall be punishable as such hereunder.
(Ord. of 2-17-2025) Chapters 31—33
RESERVED
Chapter 34
HEALTH AND SANITATION
ARTICLE I. IN GENERAL
Sec. 34-1. County smoke free air regulation.
(a) Purpose. The county is authorized to adopt ordinances or regulations to govern and protect the health, safety and welfare of its citizens; and numerous studies over the years have documented the detrimental effects of subjecting nonsmokers to second hand smoke; and nonsmokers should not be forced to inhale the secondhand smoke of others on property owned, leased or operated by the county due to documented ill effects, such as asthma attacks, heart attacks, strokes in adults and sudden infant death syndrome, middle ear infections, bronchitis, asthma, pneumonia and low birth weight in children;
and normal ventilation cannot eliminate the health risks; and it should be the goal of every elected official and department head to make Habersham County, Georgia, a safe, healthy, and attractive place to work and play; and the purpose of this chapter is to protect the public health, safety and welfare of county employees and members of the public by providing a smoke free environment.
(b) Definitions.
County building means any enclosed, indoor area which is owned, leased, or controlled by the county, including, but not limited to, rooms, offices, work areas, restrooms, and sports and recreational facilities.
County vehicle means any motor vehicle owned, leased or controlled by Habersham County, Georgia.
County sports and recreational facilities means buildings or structures such as, but not limited to pavilions, stadiums, gymnasiums, health spas, and swimming pools, leased, owned or controlled by the county where members of the general public assemble.
Outdoor public facility means any outdoor recreation area owned, leased or operated by the county, including, but not limited to ballfields, parks, amphitheaters, tennis centers, tennis courts and swimming pools.
Smoking is defined as holding, lighting, inhaling, burning, carrying, emitting or exhaling of a lighted pipe, cigar, cigarette, weed or plant of any kind.
(c) Application to county facilities and property.
(1) Smoking is prohibited in all buildings owned or building spaces leased or operated by Habersham County, Georgia Government, except in Habersham County detention facilities where the smoking policy is determined by the Sheriff of Habersham County, Georgia.
(2) Smoking is prohibited in all county vehicles at all times.
(3) Smoking shall be prohibited within 25 feet of facility/building entrances and exits.
(4) Smoking is prohibited at the entry steps and landing areas for a reasonable distance outside of an enclosed area where smoking is prohibited so as to ensure that tobacco does not enter the area through entrances, windows, ventilation systems or other means.
(5) County sports and recreational facilities and outdoor public facilities:
Smoking shall be prohibited within all county sports and recreational facilities and outdoor public facilities, with the exception of a designated smoking area within the fairgrounds.
(d) Advertising and posting of signs. Signs shall be posted at each public entrance to county buildings and outdoor county sports and recreational facilities providing notice to employees and the public at large that smoking is prohibited. Notwithstanding the provisions of this section, smoking is prohibited as set forth herein whether or not posted.
(e) Enforcement, violations and penalties.
(1) This section shall be enforced by authorized designees of the county in the Magistrate Court of Habersham County.
(2) A person who smokes in an area where smoking is prohibited shall be guilty of such infraction and punished by a fine not to exceed $1,000.00 and/or incarceration not to exceed 60 days.
(3) Each activity involving smoking shall be considered a separate offense and multiple smoking activities occurring at the same time or setting shall be considered separate offenses.
(Ord. of 3-21-2005(2), §§ 1—4; Ord. of 10-17-2011, §§ 2, 3, 5) Secs. 34-2—34-20. Reserved.
ARTICLE II. RULES AND REGULATIONS*
Sec. 34-21. State promulgated rules and regulations.
The following rules and regulations of the Georgia Department of Public Health, including all subsequent amendments, revisions or modifications thereto, and which are expressly incorporated herein, are hereby adopted and approved for enforcement as set forth herein.
(1) Control of Rabies, Rules and Regulations § 511-4-2.
(2) Food Service, Rules and Regulations § 511-6-1.
(3) Tourist Accommodations, Rules and Regulations § 511-6-2.
(4) On-Site Sewage Management Systems, Rules and Regulations. § 511- 3-1.
(5) Reserved.
(6) Drinking Water Supply, Rules and Regulations § 511-3-3.
(7) Solid Waste, Rules and Regulations § 511-3-4.
(8) Public Swimming Pools, Spas and Recreational Water Parks, Rules and Regulations § 511-3-5.
(9) Special On-Site Sewage Management Systems, Rules and Regulations § 511-3-6.
(10) The Georgia Smoke-free Air Act, Rules and Regulations § 511-3-7.
Copies of those DHR rules and regulations are on file in the office of the clerk of the board of commissioners, where the same are available for inspection and copying by the public during regular county operating hours.
(Ord. of 4-18-2016) Sec. 34-22. Local board of health enactments.
Pursuant to O.C.G.A. § 31-3-1 et seq., in addition to the above-referenced rules and regulations of the Georgia DHR, the following rules and regulations have been enacted by the Habersham County Board of Health and are hereby adopted by the Habersham County Board of Commissioners in accordance with State law, and are further hereby adopted and approved for enforcement as set forth herein:
(1) Rules and regulations concerning body art, enacted by resolution dated February 9, 2009, which are hereby set forth verbatim herein and adopted by the board of commissioners upon lawful adoption of this article.
(2) Rules and regulations concerning rabies control, enacted by resolution dated February 9, 2009, which are hereby set forth verbatim herein and adopted by the board of commissioners upon lawful adoption of this article.
Copies of those rules and regulations enacted by the Habersham County Board of Health and having been adopted by ordinance of the board of commissioners are on file in the office of the clerk of the board of commissioners, where the same are available for inspection and by the public during regular county operating hours.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-3)) Sec. 34-23. Minimum lot size.
In addition, the rules and regulations concerning minimum lot sizes for the orderly and safe development of property utilizing on-site sewage management systems, having been enacted by resolution dated February 9, 2009, by the Habersham County Board of Health are hereby adopted and made a part of this article as though fully set out at length herein. The Habersham County Board of Commissioners may, however, require larger minimum lot sizes for utilization of on-site sewage management systems in zoning or land use districts providing for septic service, and in the event there is a conflict between the minimum lot size(s) established by the Habersham County Board of Health and that established by the Habersham County Board of Commissioners, the larger lot size(s) established by the board of commissioners shall control and take precedence.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-4)) Sec. 34-24. Fee schedule.
A fee schedule for the implementation and confirmation of compliance with the above referenced state promulgated rules and regulations and local board of health enactments, including permit and inspection fees, has been established by the Habersham County Board of Health, and is hereby approved and adopted by the Habersham County Board of Commissioners. A copy of this fee schedule, including all subsequent amendments, revisions or modifications
thereto, is on file in the office of the clerk of the board of commissioners and is available for inspection and copying by the public during regular county operating hours.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-5)) Sec. 34-25. Enforcement.
The enforcement and prosecution of this article shall be within the jurisdiction of Habersham County and the Habersham County Board of Health, and their authorized designee(s) or agent(s), and all law enforcement personnel of Habersham County.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-6)) Sec. 34-26. Failure to comply.
It shall be unlawful for any natural person or persons or any legal entity including, and not limited to, a corporation, partnership, limited liability company, firm or trust, to violate any of the above-identified rules and regulations, and/or to fail or refuse to pay any fee established by the Habersham County Board of Health, and approved and adopted by the Habersham County Board of Commissioners, for the implementation and confirmation of compliance with the above-identified rules and regulations, including all permit and inspection fees.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-7)) Sec. 34-27. Penalties.
Pursuant to O.C.G.A. § 36-1-20, any person or persons or any legal entity including, and not limited to, a corporation, partnership, limited liability company, firm or trust, violating any provision of the rules and regulations identified and adopted in this article shall be deemed guilty of a misdemeanor and, upon conviction thereof, shall be punished by a fine not to exceed $1,000.00 or by imprisonment in the county jail for not more than 60 days, or both.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-8)) Sec. 34-28. Continuing offenses.
Each day during which a violation of any provision of the rules and regulations identified and adopted in this article shall constitute, and shall be considered, a separate offense.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-9)) Sec. 34-29. Magistrate court jurisdiction.
The Habersham County Magistrate Court shall have original jurisdiction upon any offense charged pursuant to this article.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-10)) Sec. 34-30. Other remedies available.
In addition to the rights and remedies set forth herein, or as otherwise authorized by law, Habersham County and the Habersham County Board of Health retain and reserve the right to seek equitable relief, injunction, abatement, or any appropriate action or proceeding to protect the public health, safety and welfare. Failure or refusal to pay any fee approved for the implementation and confirmation of compliance with the above-identified rules and regulations, including all permit and inspection fees, may result in suspension and/or revocation of any permit issued by the Habersham County Board of Health.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-11)) Sec. 34-31. Procedural matters.
Violations of all DHR promulgated rules and regulations and all local board of health enactments identified herein may be prosecuted by an accusation or citation with or without a prosecuting attorney in accordance with O.C.G.A.
§ 15-10-63, and any successor statute; and the Habersham County Board of Commissioners authorizes the county attorney or his designee to prosecute violations of this article, pursuant to O.C.G.A. § 15-10-66, and any successor statute. In addition, the solicitor of the county and his or her assistants shall also have the authority to prosecute all citations or accusations issued for violation of the rules and regulations identified and adopted in this article.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-12)) Sec. 34-32. Remedies not cumulative.
This article, and the enforcement and prosecution of this article by Habersham County and the Habersham County Board of Health, and their authorized agent(s) or designee(s), does not in any way effect, estop, prescribe, regulate, limit, or in any way control or prohibit the Georgia DHR, and its agent(s) or designee(s), from initiating or undertaking any action or proceeding to enforce compliance with its rules and regulations.
(Ord. of 4-20-2009, § 1(Exh. A, § 35-13)) Chapters 35—37
RESERVED
Chapter 38
LAW ENFORCEMENT*
Sec. 38-1. Adoption of jail construction and staffing act.
(a) Pursuant to O.C.G.A. § 15-21-92, the board of commissioners adopts this section placing in effect the provisions of the state Jail Construction and Staffing Act (O.C.G.A. § 15-21-90 et seq.).
(b) There shall be created a special account, to be known as the county jail fund, into which all proceeds collected under the terms of this section are to be deposited, and from which these sums are to be paid for the construction, operating and staffing of the county jail and correctional institute.
(Res. of 12-18-1989) Sec. 38-2. Payment of witness fees to law enforcement officers.
It shall be the policy of the board of commissioners to pay off-duty police officers and sheriff's deputies who are required by writ of subpoena to attend any superior court, or other courts having jurisdiction to enforce the penal laws of this state as provided by O.C.G.A. § 40-13-21, juvenile court, grand jury, or hearing or inquest held or called by a coroner, or magistrate court involving any criminal matter, as a witness on behalf of the state during any hours except the regular duty hours to which the officer is assigned. Such officers and deputies shall be paid for such attendance at a rate fixed by the court, but at a rate not less than the per diem paid grand jurors in the preceding term of the superior court of the county or $20.00 per diem, whichever is greater. The claim for the witness fees shall be endorsed on the subpoena, showing the dates of attendance and stating that attendance was required during hours other than the regular duty hours to which the claimant was assigned. The claimant shall verify this statement. The dates of attendance shall be certified by the judge or the prosecuting attorney of the court attended. The county sheriff, city police chief or city manager shall certify that the claimant has been paid no additional compensation and has not been given any time off on account of such service. The amount due shall be paid by the board of commissioners, which is authorized to dispense public funds for the operation of the court. However, no such officer may claim or receive more than one witness fee per day for attendance in any court or before the grand jury, regardless of the number of subpoenas which the officer may have received requiring him to appear in such court or before the grand jury on any one day.
(Ord. of 10-19-1987) Chapters 39—41
RESERVED
Chapter 42
OFFENSES AND MISCELLANEOUS PROVISIONS
ARTICLE I. IN GENERAL
Secs. 42-1—42-18. Reserved.
ARTICLE II. NOISE
Sec. 42-19. Purpose.
This article is enacted to protect, preserve and promote the health, safety, welfare, peace and quiet of the citizens of Habersham County, Georgia, through the reduction, control and prevention of loud and raucous noise, or any noise which unreasonably disturbs, injures or endangers the comfort, repose, health, peace or safety of reasonable persons of ordinary sensitivity.
(Ord. of 12-19-2005) Sec. 42-20. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
County manager means the county manager of Habersham County, Georgia, or the county manager's designee.
Emergency means any occurrence or set of circumstances involving actual or imminent physical trauma or property damage demanding immediate attention.
Emergency work means any work performed for the purpose of preventing or alleviating physical trauma or property damage, whether actually caused or threatened by an emergency, or work by private or public utilities when restoring utility service.
Noise sensitive area means, but is not limited to, a posted area where a school, hospital, nursing home, church, public library or similar institution is located.
Public right-of-way means any street, avenue, boulevard, highway, sidewalk, alley or similar place normally accessible to the public which is owned or controlled by a government entity.
Public space means any real property or structures on real property, owned by a government entity and normally accessible to the public, including but not limited to parks and other recreational areas.
Residential area means any real property which contains a structure or building in which one or more persons reside, provided that the structure or building is properly zoned, or is legally nonconforming, for residential use in accordance with the terms and maps of the county's land use ordinance.
(Ord. of 12-19-2005) Sec. 42-21. Findings.
(a) Loud and raucous noise degrades the environment of the county to a degree that it:
(1) Is harmful to the health, welfare and safety of its inhabitants and visitors;
(2) Interferes with the comfortable enjoyment of life and property;
(3) Interferes with the well being, tranquility, and privacy of the home; and
(4) Both causes and aggravates health problems.
(b) Both the effective control and the elimination of loud and raucous noise are essential to the health and welfare of the county's inhabitants and visitors, and to the conduct of the normal pursuits of life, including recreation, work, and communication.
(c) The use of sound amplification equipment creates loud and raucous noise that may, in a particular manner and at a particular time and place, substantially and unreasonably invade the privacy, peace and freedom of inhabitants of, and visitors to, the county.
(d) Certain short-term easing of noise restrictions is essential to allow the construction and maintenance of structures, infrastructure, and other elements necessary for the physical and commercial vitality of the county.
(Ord. of 12-19-2005) Sec. 42-22. Scope.
This article applies to the control of all sound originating within the unincorporated areas of Habersham County, Georgia.
(Ord. of 12-19-2005) Sec. 42-23. General prohibition.
(a) No person shall make, continue or cause to be made or continued any:
(1) Unreasonably loud or raucous noise;
(2) Noise which unreasonably disturbs, injures or endangers the comfort, repose, health, peace or safety of reasonable persons of ordinary sensitivity, within the unincorporated areas of the county; or
(3) Noise which is so harsh, prolonged, unnatural, or unusual in time or place as to occasion unreasonable discomfort to any persons within the neighborhood from which said noises emanate, or as to unreasonably interfere with the peace and comfort of neighbors or their guests, or operators or customers in places of business, or as to detrimentally or adversely affect such residences or places of business.
(b) Factors for determining whether a sound is unreasonably loud and raucous include, but are not limited to, the following:
(1) The proximity of the sound to sleeping facilities, whether residential or commercial;
(2) The land use, nature and zoning of the area from which the sound emanates and the area where it is received or perceived;
(3) The time of day or night the sound occurs;
(4) The duration of the sound; and
(5) Whether or not the sound is recurrent, intermittent or constant.
(Ord. of 12-19-2005) Sec. 42-24. Prohibited noises.
The following acts are declared to be violations of this article. This enumeration does not constitute an exclusive list:
(1) Unreasonable noise. The unreasonable making of, or knowingly and unreasonably permitting to be made, any unreasonably loud, boisterous or unusual noise, disturbance, commotion or vibration in any boarding facility, dwelling, place of business or other structure, or upon any public street, park, or other place or building. The ordinary and usual sounds, noises, commotion or vibration incidental to the operation of these places when conducted in accordance with the usual standards of practice and in a manner which will not unreasonably disturb the peace and comfort of adjacent residences or which will not detrimentally affect the operators of adjacent places of business are exempted from this provision.
(2) Vehicle horns, signaling devices and similar devices. The sounding of any horn, signaling device or other similar device, on any automobile, motorcycle, or other vehicle on any right-of-way or in any public space of the county for more than 20 consecutive seconds. The sounding of any horn, signaling device or other similar device, as a danger warning is exempt from this prohibition.
(3) Nonemergency signaling devices. Sounding or permitting sounding any amplified signal from any bell, chime, siren, whistle or similar device, intended primarily for non-emergency purposes, from any place more than 20 consecutive seconds in any hourly period. The reasonable sounding of such devices by houses of religious worship, ice cream trucks, seasonal contribution solicitors or by the county for traffic control purposes are exempt from the operation of this provision.
(4) Emergency signaling devices. The intentional sounding or permitting the sounding outdoors of any emergency signaling device including fire, burglar, civil defense alarm, siren, whistle or similar emergency signaling device, except in an emergency or except as provided in subsections (4)a. and (4)b. of this section.
a. Testing of an emergency signaling device shall occur between 7:00 a.m. and 7:00 p.m. Any testing shall use only the minimum cycle test time. In no case shall such test time exceed three minutes.
Testing of the emergency signaling system shall not occur more than once in each calendar month.
b. Sounding or permitting the sounding of any exterior burglar or fire alarm or any motor vehicle burglar alarm, shall terminate within three minutes of activation unless an emergency exists. If a false or accidental activation of an alarm occurs more than once in a calendar month, the owner or person responsible for the alarm shall be in violation of this article.
(5) Radios, televisions, boom boxes, phonographs, stereos, musical instruments and similar devices. The use or operation of a radio, television, boom box, stereo, musical instrument or similar device that produces or reproduces sound in a manner that is plainly audible to any person other than the player or operator of the device, and those who are voluntarily listening to the sound, and which unreasonably disturbs the peace, quiet, and comfort of neighbors and passers-by, or is plainly audible at a distance of 50 feet from any person in a commercial, industrial area or public space. The use or operation of a radio, television, boom box, stereo, musical instrument or similar device that produces or reproduces sound in a manner that is plainly audible to any person other than the player or operator of the device, and those who are voluntarily listening to the sound, and unreasonably disturbs the peace, quiet, and comfort of neighbors in residential or noise sensitive areas, including multifamily or single-family dwellings.
(6) Loudspeakers, amplifiers, public address systems and similar devices.
The unreasonably loud and raucous use or operation of a loudspeaker, amplifier, public address system or other device for producing or reproducing sound between the hours of 7:00 p.m. and 7:00 a.m. on weekdays, and 7:00 p.m. and 10:00 a.m. on weekends and holidays in the following areas:
a. Within or adjacent to residential or noise-sensitive areas;
b. Within public space if the sound is plainly audible across the real property line of the public space from which the sound emanates, and is unreasonably loud and raucous. This shall not apply to any public performance, gathering, or parade for which a permit has been obtained from the county.
(7) Yelling, shouting and similar activities. Yelling, shouting, hooting, whistling, or singing in residential or noise sensitive areas or in public places, between the hours of 10:00 p.m. and 7:00 a.m., or at any time or place so as to unreasonably disturb the quiet, comfort or repose of reasonable persons of ordinary sensitivities.
(8) Animals and birds. Unreasonably loud and raucous noise emitted by a domestic animal or bird for which a person is responsible. A person is responsible for an animal if the person owns, controls or otherwise cares for the animal or bird. Sounds made by animals or birds in animal shelters, kennels, veterinary hospitals, pet shops or pet kennels, licensed under and in compliance with licensing and permitting provisions set forth in this Code are exempt from this subsection. This section shall not apply to horses, livestock, poultry or other farm animals emanating from a legitimate farming operation or use on property zoned for agricultural use.
(9) Loading or unloading merchandise, materials, equipment. The creation of unreasonably loud, raucous, and excessive noise in connection with the loading or unloading of any vehicle at a place of business or residence.
(10) Construction or repair of buildings, excavation of streets and highways.
The construction, demolition, alteration or repair of any building or the excavation of streets and highways other than between the hours of 30 minutes before sunrise and 30 minutes after sunset. In cases of emergency, construction or repair noises are exempt from this provision.
In non-emergency situations, a building inspector/local government manager may issue a permit, upon application, if the building inspector/ local government manager determines that the public health and safety, as affected by loud and raucous noise caused by construction or repair of buildings or excavation of streets and highways between the hours of 30 minutes before sunrise and 30 minutes after sunset will not be impaired, and if the building inspector/local government manager further determines that loss or inconvenience would result to a party in interest.
The permit shall give permission in nonemergency cases for a period of not more than ten days. The permit may be renewed for a period of 30 days or less. This section shall not apply to the construction or repair of residential buildings and related structures by the homeowner unless such noises disturbs the comfort or repose of any person of normal sensibilities typically residing in the vicinity.
(11) Noise sensitive areas; schools, courts, churches, hospitals and similar institutions. The creation of any unreasonably loud and raucous noise adjacent to any noise sensitive area while it is in use, which unreasonably interferes with the workings of the institution or which disturbs the persons in these institutions; provided that conspicuous signs delineating the boundaries of the noise sensitive area are displayed in the streets surrounding the noise sensitive area.
(12) Blowers and similar devices. In residential or noise sensitive areas, between the hours of 10:00 p.m. and 7:00 a.m., the operation of any noise-creating blower, power fan or any internal combustion engine, the operation of which causes noise due to the explosion of operating gases or fluids, provided that the noise is unreasonably loud and raucous and can be heard across the property line of the property from which it emanates.
(13) Commercial establishments adjacent to residential property. Unreasonably loud and raucous noise from the premises of any commercial establishment, including any outdoor area which is part of or under the control of the establishment, between the hours of 12:00 p.m. and 8:00 a.m. which is plainly audible at a distance of 50 feet from any residential property.
(Ord. of 12-19-2005) Sec. 42-25. Exemptions.
Sounds caused by the following are exempt from the prohibitions set out in section 42-24 and are in addition to the exemptions specifically set forth in section 42-24:
(1) Motor vehicles on traffic ways of the county provided that the prohibition of section 42-24(2) continues to apply.
(2) Repairs of utility structures which pose a clear and immediate danger to life, health or significant loss of property.
(3) Sirens, whistles or bells lawfully used by emergency vehicles, or other alarm systems used in case of fire, collision, civil defense, police activity or imminent danger, provided that the prohibition contained in section 42-24(4) continues to apply.
(4) The emission of sound for the purpose of alerting persons to the existence of an emergency or the emission of sound in the performance of emergency work.
(5) Repairs or excavations of bridges, streets or highways by or on behalf of the county, the state or the federal government, between the hours of 30 minutes before sunrise and 30 minutes after sunset, when public welfare and convenience renders it impractical to perform the work between said hours.
(6) Reasonable activities conducted on public playgrounds and public or private school grounds, which are conducted in accordance with the manner in which such spaces are generally used, including but not limited to school athletic and school entertainment events.
(7) Outdoor gatherings, public dances, shows and sporting events and other similar outdoor events, provided that a permit has been obtained from the appropriate permitting authority.
(Ord. of 12-19-2005) Sec. 42-26. Enforcement.
(a) The following individuals shall enforce this article. The county code enforcement officer and/or sheriff's department will have primary responsibility for the enforcement of the noise regulations contained herein. Nothing in this article shall prevent the county code enforcement officer or sheriff's department from obtaining voluntary compliance by way of warning, notice or education.
(b) If a person's conduct would otherwise violate this article and consists of speech or communication; of a gathering with others to hear or observe speech or communication; or of a gathering with others to picket or otherwise express in a non-violent manner a position on social, economic, political or religious questions; the person must be ordered to, and have the opportunity to, move, disperse or otherwise remedy the violation prior to arrest or a citation being issued.
(Ord. of 12-19-2005) Secs. 42-27—42-50. Reserved.
ARTICLE III. MOTION PICTURE, TELEVISION AND
PHOTOGRAPHIC PRODUCTION
Sec. 42-51. Motion picture, television, and photographic production ordinance.
(a) Permit required.
(1) No person shall use any public or private property, building, facility or residence for producing, taking or making any motion picture, television production or photographic production without first applying for and receiving a county filming permit issued pursuant to the provisions of this article.
(b) Exceptions.
(1) Regulations by this article shall not apply to:
a. Amateur photographers.
b. Reporters or cameramen in the employ of a newspaper, news service, radio or television broadcasting station engaged in on-thespot broadcasting, reporting or photographing of news of general public interest. The exception is not to include magazine or documentary programs.
c. Productions which are conducted by the county or any county board or commission.
(c) Permit administrator.
(1) The county manager is hereby appointed as the permit administrator and shall issue permits as provided for in this article. The county manager may designate a county employee(s) to fulfill any or all of the duties assigned hereby to the county manager.
(d) Application for permit.
(1) Any person desiring a permit under the provisions of this article shall make application on the approved form provided by the county. The form must be signed and accompanied by all required fees, deposits, hold harmless agreement and insurance certificates required by this article before any permit will be considered for approval.
(2) Filming permit applications shall be submitted at least five working days prior to the date on which such person desires to conduct an activity for which a permit is required.
(e) Issuance of permits; conditions; appeals.
(1) The county manager shall issue a permit as provided for in this article, when, from a consideration of the application and from such other information as may be otherwise obtained, he finds that:
a. The conduct of such activity will not unduly interfere with traffic or pedestrian movement or endanger public safety and that no streets will be completely closed to traffic for an unreasonable period of time. Seventy-two hours advance notice of any street closure request shall be provided.
b. The conduct of such activity will not unduly interfere with normal government or county operations, threaten to result in damage or detriment to public property or result in damage or detriment to public property, or result in the county incurring costs or expenditures in either money or personnel not reimbursed in advance by the applicant.
c. At the determination of the county manager that such activity will not constitute a fire hazard or any other type of hazard and all safety precautions will be taken as determined necessary by the county manager.
(2) The decision of the county manager to issue, conditionally issue or deny a permit shall be final unless appealed in writing within five working days of the decision to the board of commissioners.
(3) The board of commissioners shall render a decision to issue, conditionally issue or uphold the denial of a permit at the next regularly scheduled meeting of the board of commissioners. The decision of the board of commissioners will be final.
(f) Bond, issuance, hold harmless and indemnification.
(1) As a condition of issuing such a permit, the applicant shall furnish a bond, insurance or both in the amount to be determined by the county manager, but in no event an amount less than $500,000.00 to protect the county against claims of third persons for personal injury, wrongful death and property damage and to indemnify the county for damage to county property arising out of the permittee's activities.
(2) A minimum of $5,000,000.00 of such bond, general liability insurance coverage or both shall be required in the event aircraft, helicopters, pyrotechnics or automobile chase scenes are used in activity. Such insurance shall be evidenced by the standard general liability special endorsement from mandated by this article. The county shall be listed as additional insured and the applicant shall have primary coverage.
(3) The applicant shall execute an indemnity and hold harmless agreement as provided by the county prior to the issuance of any permit that shall hold the county harmless against any claims, liability or judgments arising out of the permittee's activities.
(g) Suspension or revocation of permit.
(1) The county manager shall have the authority, after notice and an opportunity for a hearing, to suspend or revoke any permit issued hereunder where the terms and conditions of said permit have been violated or ignored, including the timely payment of all required fees and deposits, or suspend or revoke any permit where the public safety or welfare is endangered by the permitted activity. Provided, however, that whenever there is an imminent danger to the public health, safety or welfare from activities conducted by the permittee to the extent that immediate action is necessary to protect the public, the county manager shall have the authority to suspend a permit pending a hearing.
(h) Fees and costs of additional services.
(1) Each application shall be accompanied by the following non-refundable fees:
a. A processing fee in the amount of $150.00 will be submitted to the county at the time of application.
b. Upon approval of an application for a county filming permit, the county manager shall provide the applicant with a statement of estimated cost of providing law enforcement, public works and other county employees and services for public safety for the production. The cost of such services shall be paid to the county prior to the conducting of a production. The amount of such fees shall be based on the county's actual cost of providing the required number of law enforcement officers and other county employees and services necessary to ensure the safety of both the participants of the production and the community.
c. If the actual cost of public services for the production is less than the estimated cost pursuant to subsection b., the permittee shall promptly be refunded the difference by the county. If the actual cost for public services is more that the estimated cost pursuant to subsection b. the difference shall become due and payable to the county immediately upon the permittee's receipt of a statement of actual costs by the county.
d. All fees may be waived by the county manager for wholly charitable or educational purposes and from which no profit is derived, either directly or indirectly. Tax exempt and nonprofit organizations must qualify under Section 501(c)(3) of the United States Internal Revenue Code and proof of such status must be provided to the city in order for said fees to be waived by the county.
(i) Regulations and conditions.
(1) The applicant shall:
a. Maintain a copy of the production permit on-site at all times.
b. Comply with any and all conditions or restrictions the county may impose as a condition to issuing a permit. No changes to the conditions or restrictions shall be made without the written approval of the county manager.
c. Have nonexclusive use of facilities and public right-of-way unless otherwise granted in writing.
d. Provide advanced notification of 48 hours in a form approved by the county manager to adjacent properties for any production.
e. Comply with the noise regulations as set forth in article II of chapter 42 of the Habersham County Code of Ordinances.
(2) The county manager may promulgate and enforce additional regulations as necessary and appropriate in the implementation and enforcement of this article.
(j) Filming on private property.
(1) An applicant is required to obtain the property owner's permission, consent and/or lease for the use of property not owned or controlled by the county. Written permission of the property owner must be presented at the time of the permit application.
(2) An applicant is required to minimize interference with the normal activities of a neighborhood or commercial area, including access to private or public property.
(k) Filming at county facilities or on the public right-of-way.
(1) In the event that the applicant desires to locate their production event at a facility owned or managed by the county or on the public right-ofway, the county shall charge a daily fee in an amount determined by the county manager not to exceed $1,000.00 per day. If an existing facility charge has been established by the county at a facility owned or managed by the county, that fee will be charged to the applicant.
(l) Traffic control.
(1) The county retains the right and the authority to regulate traffic and require vehicles to be moved or towed at the owner's expense in order to protect the health, safety and welfare of the community.
(m) Faithful performance bond; clean up and restoration.
(1) To ensure the clean-up and restoration of any site on public property or public right-of-way used by the permittee within the unincorporated areas of the county, said permittee may be required to post a refundable faithful performance bond (amount to be determined by the county manager) at the time the application is submitted. Upon completion of the production and upon the finding by the county that the site has been satisfactorily cleaned up and restored, the bond may be returned to the permittee.
(Ord. of 6-18-2012, § 1) Sec. 42-52. Production or filming for adult entertainment.
Any production or filming for the purposes of adult entertainment is subject to all state and local regulations thereof prior to the issuance of any permit.
(Ord. of 6-18-2012, § 2) Chapters 43—45
RESERVED
Chapter 46
PLANNING*
ARTICLE I. IN GENERAL
Secs. 46-1—46-18. Reserved.
ARTICLE II. PLANNING COMMISSION
Sec. 46-19. Creation.
The board of commissioners hereby establishes the county planning commission, to be governed by the provisions of this article.
(Res. of 11-20-1972) Sec. 46-20. Membership; term of office; compensation of members.
The planning commission shall consist of five members, who shall be residents of the county and shall be appointed by the board of commissioners.
The terms of the members shall be for three years, except that, in the appointment of the first planning commission under the terms of this article, the first two members shall be appointed for a term of one year, the third member shall be appointed for a term of two years, and the fourth and fifth members shall be appointed for a term of three years, beginning January 1, 1973. Any vacancy in membership shall be filled for the unexpired term by the board of commissioners, which shall also have the authority to remove any member for cause, on written charges, after a public hearing. All members shall serve without compensation, but may be reimbursed for actual expenses incurred in connection with their official duties.
(Res. of 11-20-1972, § 1) Sec. 46-21. Officers, rules, staff and finances.
(a) The planning commission shall elect its chairman from among its members. The term of the chairman shall be one year, with eligibility for reelection. The planning commission shall appoint a secretary, who may be an officer or employee of the county. The planning commission shall make its own rules of procedure and determine its time of meeting. All meetings of the planning commission at which official action is taken shall be open to the public, and all records of the planning commission shall be a public record.
(b) The planning commission may appoint such employees and staff as it may deem necessary for its work, and may contract with the state planning agency and city planners and other consultants for such services as it may require. The expenditures of the planning commission, exclusive of gifts, shall be within the amounts appropriated for the purpose by the board of commissioners.
(Res. of 11-20-1972, § 2) Sec. 46-22. Powers and duties.
The planning commission shall serve in an advisory capacity to the county.
(Res. of 11-20-1972, § 3) Chapters 47—49
RESERVED
Chapter 50
ROADS AND BRIDGES*
Sec. 50-1. Road maintenance and improvement policy.
(a) New roads and streets constructed in accordance with the latest edition of the county subdivision regulations, as amended, and any other applicable ordinances, resolutions and specifications, and located within properly dedicated public rights-of-way, shall be accepted and maintained by the county;
however, the county assumes no obligation to improve the quality or character of the roadway or street above that which was accepted for maintenance.
(b) Existing county roads and streets located within dedicated rights-of-way accepted by the county shall be maintained at a reasonable level of service so as to provide egress and ingress to abutting property owners; however, the county shall not be obligated to widen, pave or make other improvements to such roads and streets which increase the value of the abutting property.
(c) Existing roads and streets which have become public through the operation of prescriptive rights of the public users, and on which maintenance work has been historically performed by the county, shall continue to be maintained by the county to a level of service that will provide reasonable egress and ingress to abutting properties; however, the county shall not make substantial improvements on such roads and streets until appropriate rightsof-way have been granted, accepted and properly filed for record.
(d) Existing private roads, streets and driveways shall not be maintained by the county, nor shall new private roads and streets be constructed by the county. However, safety of the traveling public is a high priority, therefore, from time to time it may be desirable in the interest of safety to perform a limited amount of maintenance to provide positive drainage and sight distance at private road, street, and driveway approaches. This act shall not obligate the county to perform future maintenance at these locations.
(e) With respect to road and street improvements, the county recognizes its responsibility to expend public funds for road and street improvement on roads which are primarily intracounty traffic conductors. With respect to the improvement of residential streets and other roads primarily residential in nature, it shall be the policy of the county to assign priority to those roads and streets where the benefiting property owners substantially contribute to the payment of the cost of improvements.
(Res. of 4-18-1983, §§ 1—5; Res. of 3-5-1990, §§ 1—5) Sec. 50-2. Installation of driveway pipe by county.
It shall be the policy of the county to furnish and install appropriate driveway pipe, where needed, for access from a county road to a construction site for a new residence or for a new mobile home installation, subject to the following conditions that:
(1) Budgeted funding is available.
(2) The proposed new residence or mobile home installation is not for speculative or resale purposes.
(3) The property owner or his authorized agent makes written application on forms provided by the county.
(4) For new construction, the owner has a valid building permit, with the number thereof shown on the application for such pipe installation.
(5) In the case of mobile homes, the mobile home has a current valid ad valorem tax decal affixed thereon and the number thereof is furnished in the application.
(6) The scheduling of such driveway pipe installation is subject to the priority of public road maintenance as determined by the road superintendent.
(Res. of 3-2-1987(2)) Sec. 50-3. Use of right-of-way by utility companies.
(a) Permit required. All utility companies wishing to use county rights-ofway for the construction, maintenance or repair of utility lines, poles, stations and other equipment must first make application for and be granted a permit for such use of county rights-of-way. Such applications are available in the office of the planning commission.
(b) Standards for use. All utilities granted a permit for use of county rights-of-way must conform to the current edition of utility accommodation policy and standards, as published by the state department of transportation, office of utilities, a copy of which is on file in the office of the planning commission, which is adopted by reference as part of this section. Amendments of the utility accommodation policy and standards are hereby declared to be amendments to this section.
(c) Issuance of permit. Approval of applications and granting of permits under this section shall be the administrative responsibility of the development coordinator, office of the planning commission, under the direction of the board of commissioners.
(d) Violations; penalty. Violation of this section in any manner is hereby declared to be a misdemeanor, and shall be punished in accordance with section 1-7. Each day such violation continues shall be a separate offense.
(Res. of 12-27-1983) Sec. 50-4. Provisions saved from repeal.
The resolution adopted March 3, 1985, which identifies as public roads all the roads shown on the 1982 map of the county prepared by the state department of transportation, as modified by the county highway department, is not repealed and shall continue in full force and effect.
Chapters 51—53
RESERVED
Chapter 54
SOLID WASTE*
ARTICLE I. IN GENERAL
Sec. 54-1. Definitions.
Commercial solid waste means all types of solid waste generated by stores, offices, restaurants, warehouses and other non-manufacturing activities, excluding residential and industrial wastes. (As defined in O.C.G.A. 12-8-22) Composting means the controlled biological decomposition of organic matter into a stable, odor-free humus.
County means any area lying and being in unincorporated Habersham County, Georgia.
Dump means to throw, discard, place, deposit, discharge, bury, burn, or dispose of a substance. (As defined in O.C.G.A. 16-7-51)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.