13.10.1770. Sanitary sewer system connection fee.

Sobre este texto

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Users subject to fee. Users of the sewer system shall pay a sewer connection fee before new or additional service will be made available.

Applications for new or additional sewer service must include the street address for a specific lot or lots where the service is to be provided. Applications for sewer service shall expire unless all fees have been paid to the county's finance director no later than ten calendar days after the date of application issuance by the utilities department. Sewer service approved for a specific lot shall not be transferred to any other lot or property. Existing users shall be subject to the fee when their existing water service tap is inadequate to deliver the volume of water desired and requires an increase in the water service tap and

meter size. New users will be subject to the fee at the time new service is requested. All users shall be subject to the sewer connection fee regardless of location of the service tap.

B. Determination of connection fee.

(1) The sanitary sewer system connection fee shall be imposed unless other fees are established by contractual obligation between an entity and the county including a three percent administrative fee to account for tracking the collection and use of the connection fee. Said fee shall be as

set forth in the Hall County Sewers and Sewage Disposal Fee Schedule adopted by the Hall County Board of Commissioners for connection fees. The sanitary sewer system connection fee shall be paid at the time of application for sanitary sewer service and in addition to the meter and sanitary sewer system tapping fees.

C. Changing tap and meter size.

(1) After the original sewer connection fee has been paid and installation made, any customer requesting a change in water tap size resulting in a smaller water meter shall make proper application at the water and sewer department for this change.

Such change shall be made without cost to the customer. No credit shall be given for sewer connection fees or water meter costs paid on the existing larger water meter. The water meter removed shall remain the property of the water provider and shall be returned to the same.

(2) After the original sewer connection fee has been paid and installation made, any customer requesting a change in water tap size resulting in a larger water meter shall make proper application for this change. The customer shall pay a sewer connection fee equal to the difference between the current applicable sewer connection fee for the existing water meter size and the current applicable sewer connection fee for the requested water meter size.

D. Payment of fee.

(1) Existing users shall pay the sewer connection fee at the time the application is made to increase the size of the existing

water service tap on meter.

(2) New users shall pay the sewer connection fee at the time the application is made for sewer service.

E. Revenue restrictions.

(1) All revenues received from each sewer system connection fee service area shall be accounted for separately and distinctly from any other system revenues. Available sewer system connection fee balances shall be invested and all interest earned on these investments shall be accounted for as part of the sewer system connection fee revenues for each service

area. The accounting system shall be established so that sewer system connection fee collections from each service area,

interest earned, and expenses can be clearly tracked on a monthly basis and so that connection fees are properly deposited, accounted for and expended in accordance with this section.

(2) Sewer connection fee funds from each service area shall be expended only for costs related to system improvements, as defined in O.C.G.A § 36-71-2(20), as amended, that provide capacity to serve new connections to the sewer system located within that service area. All costs permitted under O.C.G.A. § 36-71-2(19),

as amended, shall be permitted under this section. Such costs include, but are not limited to, planning, design, engineering, land acquisition, land improvement, surveying, and construction or reconstruction costs as well as principal, interest and other financing costs on contracts,

bonds, notes or other obligations issued by the county to finance such system improvements. Sewer connection fee funds shall not be expended for maintenance or repair of system improvements nor for operational expenses.

F. Applicant contributions of system improvements; credits/reimbursements.

(1) Project improvements are the responsibility of the developer or property owner and no credits against connection fees shall be

made for project improvements. Project improvements include all lot or building improvements necessary to provide service (including for example the building sewer and cleanout and prestubs if required) and main extensions of eight inches in diameter and up to 100 feet in length

from the property line or project boundary as required to connect to the nearest main.

Project improvements also include any other sewer system facilities, including but not limited to pump stations and larger diameter lines, that are planned, designed and necessary to provide service to a particular development project in accordance with O.C.G.A. § 36-71-2(15), as amended. Tap costs are covered by the tapping fee imposed pursuant to this section.

(2) Upon application for new or increased sewer service, the sewer connection fee otherwise due shall be reduced by any applicable credits for the contribution of money or dedication of land for or the construction of system improvements, as defined in O.C.G.A. § 36-17-2(20), as amended, within the service area where the new connection is located and serving the new connection, and required or accepted by the county from the applicant or his predecessor in title or interest. In the

event that the amount of credit due exceeds the total sewer connection fees due, an agreement between the applicant and

the county shall govern the amount and timing of reimbursement payments to the applicant. The county shall have the option of reimbursing an applicant by a lump sum payment or periodic payments

and from existing funds or from sewer connection fees collected in the future.

(3) The amount of applicable credit/reimbursement, if any, shall be determined based on credible evidence submitted by the applicant on forms provided by the county utility department, which:

(a) Describes the contribution for which credit/reimbursement is claimed;

(b) Establishes the original cost and date of the construction, contribution or dedication;

(c) Identifies the specific development project for which the construction, contribution or dedication was made, including the location, land use, size, number of buildings or number of dwelling units in the original development project; and

(d) Describes the development project for which the credit/reimbursement against sewer connection fees is requested, if different from the project described in paragraph F.(3)(c) of

this section. Credits/reimbursements may not be transferred from one development project to another project. All costs related to submitting the credit/reimbursement application and any additional information requested by the director are the responsibility of the applicant.

(4) The director of public works and utilities, and the director of finance shall determine the amount of credit/reimbursement due per connection, if any, based on consideration of the original and current or depreciated value of the contribution or

dedication, the facilities required to serve the development project, the ability of the contribution or dedication to provide service to other development, and, if the contribution or dedication is determined

to be a system improvement which is eligible for credit/reimbursement, the per connection share of the present value of the construction, contribution and dedication. System improvements shall be determined based on accepted engineering principles and data produced by a registered engineer. The burden of establishing eligibility for a credit/reimbursement is on the applicant claiming the credit/reimbursement.All costs incurred by the county, including the value of staff time and consultant fees, as well as expenses related to applications for credit/reimbursement,

shall be the responsibility of and charged to the applicant. Regardless of the results of any appeal of a determination of the director by the applicant, county costs billed to and paid by the applicant shall not be refunded.

G. Annual report. At least once every year, the director of public works and utilities and director of finance shall jointly prepare a report on the sewer connection fees. Such report shall include:

(1) The total amount of sewer connection fees collected within each service area during the past fiscal year;

(2) The total expenditures and projects funded in part or in whole by sewer connection fees within each service area during the past fiscal year;

(3) The sewer connection fee interest earned and account balance for each service area;

(4) The sewer system projects within each service area anticipated to be funded in whole or in part by sewer connection fees;

(5) Any proposed changes to the Hall County Sewers and Sewage Disposal Fee Schedule for sewer connection fee calculation methodology; and

(6) Any other recommendations as the director of public works and utilities or the director of finance deem appropriate or as

may be requested by the board of commissioners.

H. Appeal process.

(1) Applicants for a new or changed sewer service may appeal any determination of the director of public works and utilities regarding the meter or line size required to serve the property or the amount of credits and reimbursement due for contributions of system improvements to the board of commissioners. Appeals shall be

made to the board of commissioners and must be filed no later than 30 days after the date of determination by the director of public works and utilities. The board of commissioners shall provide the applicant with a written explanation of its determination within 60 calendar days of

filing of the appeal with board of commissioners. Appeals shall be submitted on a form provided by the county.

I. Authority to establish an administrative fee.

(1) A reasonable fee to cover all or a portion of the administrative costs incurred in administering and managing the sewer connection fee system may be established by resolution of the board of commissioners.

Such administrative fee may include, but is not limited to, the following costs to the extent the costs are related to the administration and operation of the connection fee system: reasonable charges for control

authority staff time, consultant fees and expenses, computer equipment/software, and other equipment the costs of which are not included in the sewer connection fee calculations.

(2) The administrative fee adopted by resolution of the board of commissioners shall be paid at the time of application for new

or changed sewer service and shall be paid in addition to the cost of the sewer system connection fees and sewer system tapping fees.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 1-8-09(1), §§ 1, 2(Exh. A))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hall-county/code/13.10.1770@2026-05-28-498fc6d503

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hall County Code of Ordinances, 13.10.1770. Sanitary sewer system connection fee | Georgia Commons