Hall County · Código de ordenanzas
Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.20 - CONSTRUCTION STANDARDS AND OPERATIONAL RESPONSIBILITIES FOR SEWERAGE SYSTEMS AND FOR REUSE SYSTEMS
13.20.040. Adoption of standard construction practices.
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A. For sewerage systems, the following publications are hereby incorporated by reference and are adopted as the standard construction practices for sewerage systems:
1. Standard Construction Practices for Water and Wastewater Systems, latest edition, Hall County, Georgia; and
2. Minimum Design Standards for Community Sewerage Systems, latest edition, United States Department of Housing and
Urban Development.
B. For reuse systems, the following publications are hereby incorporated by reference and are adopted as the standard construction practices for reuse systems:
1. Standard Construction Practices for Reuse Systems, latest edition, Hall County, Georgia; and
2. Guidelines for Water Reclamation and Urban Water Reuse, latest edition, Georgia Department of Natural Resources.
C. In the event any provisions of the documents above are in conflict with each other or the provisions of this chapter, the more stringent
standard shall be applied.
Historia
(Res. of 1-8-09(2), §§ 1, 2(Exh. A))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.