Ir al contenido
Georgia Commons
Menú

Haralson County · Código de ordenanzas

Part - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS AND LAND DEVELOPMENT

Sec. 40-12. Survey monuments for all lots required.

Sobre este texto

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

For all subdivisions, a Georgia registered land surveyor shall install permanent survey monuments at all property corners and land lot lines, prior to final plat approval. Lot corners shall be marked with metal rods not less than one-half inch in diameter and 18 inches in length and driven so as to be stabilized in the ground. Permanent survey monuments shall also be installed in accordance with the most recent edition of section 180-7-.05, Monument, of the Rules of State Board of Registration for Professional Engineers & Land Surveyors and the Georgia Plat Act (O.C.G.A. § 15-6-67).

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 1-23-2024(1), § 1(Exh. A))

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:haralson-county/code/40-12@2023-06-06-b00f7fc605

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.