Harris County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 7 - WATER, SEWAGE AND UTILITIES / Article III - SEWAGE / Division 3 - PUBLIC SEWERS
Sec. 7-74. Use of public sewers required.
Sobre este texto
- As published by Municode, current through 2023-12-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Unsanitary, offensive deposits on property generally. It shall be a violation of this division for any person to place, deposit or permit to be deposited in any unsanitary manner on public or private property within unincorporated areas of Harris County, any human or animal excrement, garbage or other objectionable waste.
(b) Discharging waste to natural outlets. It shall be a violation of this division to discharge to any natural outlet or storm sewer system within any area in Harris County, Georgia, and/or under the jurisdiction of Harris County any sewage or other polluted waters, except where suitable treatment has been provided in accordance with subsequent provisions of this division, or a NPDES permit which has been issued by the Georgia
Environmental Protection Division.
(c) Private sewage disposal. Except as hereinafter provided, construction or maintenance of any privy, privy vault, septic tank, cesspool or
other facility intended or used for the disposal of sewage is prohibited in those areas of unincorporated Harris County for which Harris County operates a public sewer system and has been so
designated by resolution adopted by the Harris County Board of Commissioners.
(d) Sewer connection required if available. The owner of all houses, buildings or properties used for human occupancy, employment, recreation or other purposes, situated within the unincorporated jurisdiction of Harris County, Georgia, and abutting on any street, alley or right-of-way in
which there is now located or may in the future be located, a public sanitary or combined sewer, are hereby required at their expense to install adequate and suitable toilet facilities therein for all occupants and/or users of said property and to
connect such facilities with the proper public sewer in accordance with the provisions of this division, within 90 days after the date of official notice to do so, provided that said public sewer is within the required distance. In the event pumping is required for access to the public sewer, the pumping facility shall be installed and maintained by the owner.
As for commercial and industrial users, the quality of the wastewaters must be analyzed and an assessment of those waters reviewed for proper disposal methods. Based on this assessment and where Harris County's sewage conveyance system is available, those industrial and commercial users shall at their own expense and without
regard to distance to the sanitary sewer system, install a sewage conveyance system to be connected to the sanitary sewer system of Harris County.
Historia
(Ord. No. 07-14, § 2, 12-16-2014)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.